ML20077E289
| ML20077E289 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 07/25/1983 |
| From: | Bradley E PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | Schwencer A Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8307280242 | |
| Download: ML20077E289 (4) | |
Text
_ _ _ -
b 0-f[7 h
- a r,, "j h PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 PHILADELPHIA. PA.19101 EDW ARD G. S AUER, JR.
(2153841-4000 vece ense.oen, ano sumsma6 counss6 EUGENE J. BR ADLEY assocsava emmena6 coumsu6 DON ALD SLANKEN RUDOLPH A. CHILLEMI E. C. KI R K M A LL T. H. M AM ER CO RN ELL PAUL AUERBACH assistant emnsma6 couwsu6 EDW A RD J. CULLEN. J R.
woM As w. Miu.En. J R.
July 25, 1983 1R EN E A. McM EN N A assistant coumssk Mr.
A.
Schwencer, Chief Licensing Branch No. 2 Division o f Licensing U.
S.
Nuclear Regulatory Commission Washington, D.C.
20555
Subject:
Limerick Generating Station, Units I and 2 Procedures and Test Review Branch
Reference:
PECO and NRC Conference Call dated 7/14/83 File:
GOVT l-1 (NRC)
Dear Mr. Schwencer:
As a result of the discussions in the reference conference call, the attached draft FSAR page changes addressing operator actions when entry level TRIP procedures a re me t, will be incorporated into the FSAR exactly as it appears on the attach-ments in the revision scheduled for August, 1983.
Sincerely, Eu ne Bradley RJS/gra/38 Copy to:
See Attached Service List
\\
8307280242 830725 I k PDR ADOCK 05000352 A
pm
g- -
e cc: Judge Lawrence Brenner (w/o enclosure)
Judge Richard F. Cole (w/o enclosure)
Judge Peter A. Morris (w/o enclosure)
Troy B. Conner, Jr., Esq.
(w/o enclosure)
Ann P. Hodgdon (w/o enclosure)
Mr. Frank R. Romano (w/o enclosure)
Mr. Robert L. Anthony (w/o enclosure)
Mr. Marvin I. Lewis (w/o enclosure)
Judith A. Dorsey, Esq.
(w/o enclosure)
Charles W. Elliott, Esq.
(w/o enclosure)
Jacqueline I. Ruttenberg (w/o enclosure)
Thomas Y. Au, Esq.
(w/o enclosure)
Mr. Thomas Gerusky (w/o enclosure)
Director, Pennsylvania Emergency Management Agency (w/o enclosure)
Mr. Steven P. Hershey (w/o enclosure)
Donald S. Bronstein, Esq.
(w/o enclosure)
Mr. Joseph H. White, III (w/o enclosure)
David Wersan, Esq.
(w/o enclosure)
Robert J. Sugarman, Esq.
(w/o enclosure)
Martha W. Bush, Esq.
(w/o enclosure)
Spence W. Perry, Esq.
(w/o enclosure)
Atomic Safety and Licensing Appeal Board (w/o enclosure)
Atomic Safety and Licensing Board Panel (w/o enclosure)
Docket and Service Section (w/o enclosure) i
a*
~
shutdown from hot standby to cold con'ditions; preparation for refueling operations System Procedures:
Recirculation system; reactor water cleanup system; residual heat removal system; high pressure coolant injection system; core spray system; reactor core isolation cooling system; standby liquid control system; fuel pool cooling system; containment; control rod drive systems; reactor protection system; main steam system; turbine-generator; condensate and feedwater systems; eirculating water system; cooling towers; cooling water systems; main generator; plant radwaste Y # electrical systems; de systems; diesel-generators; systems; solid radwaste processing; standby gas treatment system; mr heating, ventilation, and air conditioning systems; fire 4
protection systems; nuclear instrumentation Operational Tedniient Procedure W Seactor low water level; n
r level; high pressure; reac r vessel ain steam line,dryw(1) radiation; APRM h gh power
)
re tor high,wa hig hi h pressure; 1 vel; IRM'high power levely scram discharge volume igh leve-1; in condenser low vacuum;'turbin trip; main' steam / isolation alve c)osure; loss of r(actor fayedpump; loss of condensate pump; secircdlation pump trip'; stuck c6ntrol rod; loss of circulating wate / pump; l<ss of c6ntainmen integrity; loss of flux n
umentati n; hi h radiatio offgas; high r diation ilation s loss of com n rit cooling er E M ency Pros b es:
Loss' fc,olant;mainstemlinebrefk; of electric /l powerf loss of shutdown cooling; loss of a
ea tor pr6tect on system chan 'el; conditions, requiring us'e of at dby riquid contr61 system; firer' reactiv ly control stem fa lu
- react r t(ip; refuel ng/ fuel hand 11 g accidents l
ab o al relea es of radioact vi'ly
'Emeraency Plan Procedures Radiological surveys and monitoring; rescue operations; fire fighting; first aid; decontamination; personnel accountability; communications; repairs and damage
- *~g,,"
control; record keeping; organization, duties T I psar-Licensed reactor operators and senior reactor rators are u-required to know the immediate operator actio in operational PT transient procedures --
-,mney procedures 5,p3I n
13.5.2.2 Main'tenance ' and-Ottrar Procedures L
In add ion to opera ing procedures related primar)1y to control room perations, pr edures shall.be issued to co col other plan activities.
hese procedures shall include f ael handling p t'o c e d u r e s, c h e m i ry procedures, health physics procedures, 7p g f maintenance pro dures, security procedures, survei llance test yW ures.
The types of procedures, a preventivemaintenancep{oced M
,M q"A M fQ NOD M MN op d
13.5-30 stu m br ey F
e 9.C @5EFA
^
y e
^
DRAFT
.* +.
e#
4, we e
+w--
4 A h MAA mA
_mMmAW2AA.1
=~-
7/w/e 3
_m.
man.-een-
--memqm.,
h-a--m=m...a
--m-*e -y
+
e
.=
-e-e phen-r-m----
--m---.ame----
-e.p my
.m
--%--m,_-
ee, s.-#--rm.
-..---ww,.we w
+--reas.
me-e-----w-em-ew.em.-s*he.----e eN*
e
-m-aw--o._.-w-
-.-wim.--
,%s.._.
.ms-,,.m-w._.,,_
. _ - =.---
_ew,.-
-m.am
.ms m,
umm=e-isemww..
r'- h *' - - N a me+
-p.--ao.---o-
-_--,am-mm.-,
.,,.m
-_,,..,,,. _., ~__
..,..--e_
--+-w..,,.-g.-mus-ey
.--..m
=e--w-wh+---
w, + - -.
_%..w - -- w -.
,,_m-_
,m-._,,,., _,.,._
,,__.,_.-..--.-__._.mmema-
--_$-w_.
=-.:m,.
.-g
~
em
-we---uimm--
--wa
>--een---na-.
-e----m-
e= -.
-w e=
-'-----a.
'N-"
-.-==
e%e
,,_ma.
%.,ee_.
e.%
--e.w---.ee.--..
-.-#ee-
.i mad.-.e
--,--ex-_emmmew..
--emr-mmmu---e.--
ww---
--ee.4.que-
.-4m.-a-..-,_e-,.e.--
um---
-a,.---m wm4- - -w en --4e.m*-
am.m.-m.
a e m. mum
- - -_ _ _ _ _ _ _ _ _ _____ _____..