Text
_
o.
~.
TENNE $iffR@@hhz UTHORITY CH O GA TENNESSEE 374ot 400 Chestnut Str e Tower II 4
83 JUll8
- July 14, 1983 BLRD-50-438/83-41 BLRD-50-439/83-35 U.S. Nuclear Regulatory Commission Region II Attn: Mr. James P. O'Reilly, Regional Administrator 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30303
Dear Mr. O'Reilly:
BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - WELDS ON VENDOR (TRANSAMERICA DELAVAL AND ITE IMPERIAL) ASSEMBLIES DO NOT MEET REQUIREMENTS - BLRD-50-438/83-41, BLRD-50-439/83 FIRST INTERIM REPORT The subject deficiency was initially reported to NRC-0IE Inspector L. Watson on June 15, 1983 in accordance with 10 CFR 50.55(e) as NCR BLN 2389 Enclosed is our first interim report. We expect to submit our next report by November 30, 1983 Evaluation of applicability of 10 CFR Part 21 to this deficiency has been I
postponed pending final determination of the acceptability of the welds.
If you have any questions, please get in touch with R. H. Shell at FTS 858-2688.
Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills, Ma ager Nuclear Licensing l
Enclosure cc: See page 2 8307220304 830714 l
PDR ADOCK 05000438 S
PDR gD 1983-TVA 5OTH ANNIVERSARY h
,7, c
e
> U.S. Nuclear Regulatory Commission July 14, 1983 co (Enclosure):
Mr. Richard C. DeYoung, Director Office of Inspection and Enforcement U.S. huolear Regulatory Commission Washington, D.C.
20555 Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339
(.
ENCLOSURE BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 WELDS ON VENDOR (TRANSAMERICA DELAVAL AND ITE IMPERIAL) ASSEMLBIES DO NOT MEET REQUIREMENTS BLRD-50-438/83-41, BLRD-50-439/83-35 10 CFR 50.55(e)
FIRST INTERIM REPORT Description of Deficiency Some of the welds on safety-related electrical switchgear panels supplied by ITE Imperial Corporation, Knoxville, TN (ITE), appear to violate the acceptance criteria delineated in the vendor's QA manual. Similar deficiencies have been noted on the standby diesel generator (DG) control panels supplied by Transamerica Delaval (TD), Oakland, CA, that apparently violate American Welding Society (AWS) D1.1 acceptance criteria.
Interim Progress TVA has determined that one of the DG control panels at BLN was the panel seismically qualified by TD in support of TVA's contract requirements. TVA is in the process of identifying the qualified panel and an acceptance criteria which may be used as a basis of comparison to the other three panels and subsequent acceptability for use "as is."
TVA has received a report from ITE in support of ITE's contention that the panels supplied for use at BLN are substantially similar to the ITE panels which were seismically qualified and are, therefore, acceptable for use "as is."
TVA will disposition this deficiency accordingly, pending development of an inspection acceptance criteria and evaluation of the ITE panels to determine if they are basically similar.
+
e
'O 4 %l} *
',k '
i,
- ]
j e
e
.%: -~ - f*r = _ :
.,xt, m m.
. -. wp
. ;g;;
. u :is4
- L. 2
-,___.._._.__,_s
.. - -. =..
,. ~,. _.. _. _,
, __ _.. _,.. _.