Monthly Operating Rept for May 1983
ML20077A248
Person / Time
Site: Indian Point 
Issue date: 06/01/1983
From: Brons J, Kelly L
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
IP-LK-1615, NUDOCS 8307220251
Download: ML20077A248 (8)


Text

.

1-I OPERATING DATA REPORT l

DOCKET NO.

50-286 DATE

< Tuna 1.

1983 COMPLETED BY

7. - Ke11v TELEPHONE (914) 739-8200 OPERATING STATUS
1. Unit Name. Indian Point No. 3 Nuclear Power Plant Mav 1983
2. Reporting Period:
3. Licensed Thermal Power (MWtl:

3025 1013

4. Nameplate Rating (Gross MWe):

965

5. Design Electrical Rating (Net MWe):

926

6. Maximum Dependable Capacity (Gross MWe):

891

7. Maximum Dependable Capacity (Net MWe):

li. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:

i

9. Power Level To Which Restricted,If Any (Net MWe):
10. Reasons For Restrictions.If Any:

This Mont's Yr. to-Date Cumulative 744 3623.0 59,184.0

11. Hours in Reporting Period 0

0 34,090.8

12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours 0

0 0.0 0

0 32.913 1

14. Hours Generator On Line
15. Unit Reserve Shutdown Hours 0

0 0.0 0

0 86,143,401.0

16. Gross Thermal Energy Generated (MWH) 0 0

26,298,300.0

17. Gross Electrical Energy Generated (MWH) 0 0

25.1n7.441.n

18. Net Electrical Energy Generated (MWHi 0

0 55.6

19. Unit Service Factor 0

0 55.6

20. Unit Availability Factor 0

0 47.a

21. Unit Capacity Factor (Using MDC Net) 0 0

44.1

22. Unit Capacity Factor iUsing DER Net) 0 0

14,3

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date and Duration of Each):

t 8 June 1983 25 If Shut Down At End Of Report Period. Estimated Date of Startup:

26 Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 8307220251 830601

[L[

PDR ADDCK 05000286 PM R

_ _.. _. - - _, _. _ _ _ _ - ~

t AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-286 Indian Point UNIT No. 3 DATE June 1, 1983 COMPLETED BY L. Keliv TELEPHONE (914) 739-8200 MONTH May 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Ne:)

(MWe.Neti 1

0 g7 0

2 0

gg 0

3 0

19 0

4 0

20 0

5 0

21 0

6 0

22 0

7 0

0 23 g

0 0

34 9

0 25 0

10 0

26 0

11 0

27 0

12 0

0 28 13 0

0 29 14 0

0 30 15 0

0 31 16 0

l INSTRUCTIONS On this format. list the average daily unit power level in MWe. Net for each day in the reporting month. Compute io the nearest whole megawatt.

(0/77 )

l l

l t

UNITS!!UTCOWNS AND POWER REDUCTIONS DOCKET NO.

50-286 UNIT NAME NO-3 DATE June 1.

1983 COMPLETED BY L.

Kellv REPORT MONT11 May 1983 TELEPHONE 914-739-8200 e.

E E

.$ g 3

y Y3 Li:ensee

[v, je.

Cause & Corrective No.

Date Q

3g i

jj$

Event gy g3 Action to H

j=

j f3 g Repor a mU U

Prevent Recurrence g

t5 04 82/03/25 S

744 B&C N/A N/A N/A Unit completed a scheduled cycle 6 11 III-IV Refueling and Maintenance Outage on 21 May 1983. Unit remained in Cold Shutdown until receipt of NRC License Amendment on 27 May 1983.

I 2

3 4

F: Forced Reason:

Method:

Exhibit F-Instructions S: Scheduled A-Equipmert Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C Refueling 3-Automatic Scras.i.

Event ReporI (LERI File (NUREG-D-Regulatory Restriction 4-Other ( Explain) 0161)

E-Operator Train.ag & License Examination F-Administrative 5

G-Operational Error (Explain)

Exhibit 11-Same Source (9/77) 11-01her (Explain)

MONTHLY I & C CATEGORY I REPORT May 1983 MONTH W.R. #

DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION IC 3-22-83 PT-412A, Turbine First Stage Unable to zero transmitter Replaced transmitter amplifier 1977-2 Pressure Transmitter IC 4-25-83 OPS Analog Channel I Resis-Unable to calibrate Replaced operational amplifiers 2061-2 tance to Current Converter in converter IC 5-3-83 Waste Hold Up Tank Area No high range output Replaced defective high range 2104-2 Radiation Monitor 3 HBR 1013 Card O

wm

t paga 1 of 2 MONTHLY MAINTENANCE REPORT MAv l9na MONTH MWRf DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION 3371 05/0'6/83 32 Auxiliary Boiler Feed Pump None preventive maintenance Rebuilt throttle valve 6

3529 05/09/83 Pressure Relief Valves PCV-1190,1191,1192 Valve seats leak Adjusted valve seats 3570 05/09/83 31-34 Steam Generator None Performed sludge lancing 3531 05/10/83 33 Steam Generator Steam Generator drain line cup Rewelded cracked 3586 05/12/83 33 Charging Pump Packing leak Repacked 2823 05/14/83 32 Steam Generator Shell girth weld leak Removed boat sample 3617 05/16/83 Component Cooling t"o 33 Reactor Coolant Pump Piping leak Soldered joint 3459 05/17/83 Residual Heat Removal Suction valve 885A Container

[,0wer joint leak.

Replaced gasket 3595 05/17/83 Polar Crane 35 Ton Hook lone preventive maintenance Replaced pawl and clutch discs Replaced union with flanges.

3621 05/18/83 Weld Channel to 95' Airlock Joint leak 2983/

05/20/83 Containment Purge Supply &

3010 Exhaust Valves FCV 1170-1173 Valve seats leak Adjusted valve seats 3605 05/19/83 31 Diesel Generator

{igh oil temperature Cleaned oil cooler O

=

Paga 2 of 2 MONTHLY MAINTENANCE REPORT MAY 1983 MONTH MWRf DATE EQUlPMENT MALFUNCTION CORRECTIVE ACTION 3043 05/20/83 32 Charging Pump Wetting tank leak Rewelded 3398 05/20/83 RHR Miniflow Valve 1870 Leak on outlet pipe weld Replaced and welded pipe 3597 05/20/83 Main Steam Safety Valve MS-45 Disc-seat leak Replaced disc 3607 05/20/83 32 Charging Pump Packing leak Repacked 3629 05/20/83 Pressurizer Manway gasket leak Replaced manway gasket 3574 05/21/83 Safety Injection Pump Recirculation Valve MOV-842 Slow stroke time Replaced operator 3211 05/23/83 Hanger SI-H-56-7V Improper spring Replaced spring can 3609 05/23/83 33 CVCS Holdup Tank Vent header damaged Repaired vent header piping 3630 05/23/83 Containment Pressure Relief Valve PCV-1192 Linkage needs adjustment Adjusted linkage 3631/

05/24/83 Component Cooling to #31 3610 Reactor Coolant Pump Piping leaks Soldered joints 3635 05/25/83 Nitrogen Control Valve PCV-1049 to Hold-up Tanks Valve doesn't fully close Adjusted stroke 3666 05/25/83 34 Fan Cooling Unit Mocor Cooler Service Water Inlet Valve SWN-71 Inlet valve Body / Bonnet leak Replaced gasket 3661 05/27/83 Letdown Isolation valve 200B Air Operator Diaphragm leak Replaced diaphragm

k

. m

)

t

-s

SUMMARY

OF OPERATING EXPERIENCE Indian Point Unit 3 remained shutdown for the entire reporting period.

On May 21, 1983 unit modifications, maintenance, and repairs were completed.

Start up was delayed and the unit remained in a cold shutdown condition until 3,

a the NRC License Amendment was received on May 27,1583. Plant heat up commenced on May 27,1983. On'May 31, 1983 the unit was in Hot Standby with the Reactor N

0 Coolant System average temperature at 547 F..The unit is scheduled to return to service on' June ' 8, 1983.

'4 s

e a

.L.-

s f

b 1 '

6 I

e e

O A

4 f

q r

)'

j,e

. 4-c 4 <..

--s--

Indian Point 3 Nuclear Power Plant ti<

P.O. Box 215 Buctunan, New b410511 Sh4 73102a)

- #> NewYorkPbwer 4#~ Authority June 10, 1983 IP-LK-1615 Docket No. 50-286 License No. DPR-64 Director, Nuclear Reactor Regulation Office of Management Information and Program Control U. S. Nucleae Regulatory Commission Washington, D. C. 20555

Dear Sir:

Enclosed you will find two copies of the monthly operating report relating to Indian Point 3 Nuclear Power Plant for the month of May, 1983.

Very truly yours, Jh Resident Manager LK/bam Enclosure cc: Director, Office of Inspection & Enforcement (40 Copies) c/o Distribution Services Branch, DDC, ADM U. S. Nuclear Regulatory Commission Washington, D. C. 20555 James M. Allen, Acting Regional Administrator Region 1 U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 Mr. Leroy W. Sinclair New York Power Authority 10 Columbus Circle New York, New York 10019

~

IP3 Resident Inspectors' Office George Wilverding (SRC), WPO J. P. Bayne, WPO i-INP0 Records Center gg a

Suite 1500 7

1100 Circle 75 Parkway Atlanta, Georgia 30339 g