Amend 98 to License NPF-12,revising Tech Spec Deleting Surveillance Requirements 4.8.1.1.1.b,demonstrating Operability of Offsite Preferred Power Sources
ML20077A084
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 05/01/1991
From: Anthony Mendiola
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20077A087 List:
References
NUDOCS 9105080259
Download: ML20077A084 (7)


Text

__ - - - _ _ _ _ _ _ _ - _ _ _ _ - _ - - - - - - - - - - - - - - - - -

"6

..'e' gyn A$

.. 1 "

UNITED STATES -

'T'

,/-

1, NUCLEAR REGULATORY COMMISSION

-,o-WASHINoToN, D.C. 20666 SOUTHCAROLINAELECTR18 GAS,CORANY SOUTHCAROLINAPUB(!C..SERylCEAUTHORITY DOCKETNO.50-39j VIRGIL C. SUMMER NUCLEAR STATION; UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amen! ment No.

98 License No. NPF-12 1.

The Nuclear Regulatory Commissinn (the Commission) has found that:

A.

The application for amendment by -South' Carolina Electric & Gas Company (the licensee), dated November, 26, 1990, complies with the

-standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and.the Comission's rules and regulations set torth in-10 CFR Chapter I;

-B.

The facility will operate in unformity with the application, the provisions:of the Act, and-the rules and regulations of-L the Comission;.

l

'C.

There is reasonable assurance (i) that the activities authorized L

_by'this amendment'can be conducted without enday;ering the health and safety of the public, and (ii) that such activities will be n

' conducted in-compliance with the Commission's regulations; L

D.

~The issuance of this -amendment will not be inimical to the comon defense and security or to the health and safety of the public;--

andi E.

'The issuance of this amendment is-in accordance with 10 CFR Part 51-of the Comission's regulations and all applicable requirements e

=have been satisfied.

'2.

-Accordingly, the licenselis amended by changes to the Technical

-Specifications, as indicated ~in-the attachment-to this: license amendment; and paragraph 2.C.(2) of Fac_ility Operating License No. NPF-12 is hereby amended to read as follows:

i l

9105080259 910501 l

FDR ADOCK 05000395 p

rDR 4

-.m.

2 (2) TechnicalSpecificationsandEnvironmentalProtection(}g The Technical Specifications contained in Appendix A, 4:.

through Amendment No. 98

, and the Environmental Protte+ <

a.

contained in Appendix B, are hereby incorporated in the li,e. -

South Carolina Electric & Gas Company shall operate the f acility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This amendment is effective as of its date of issuance and shall be implemented within 30 days of issuance, FOR THE NUCLEAR REGULATORY COMMISSION Orignal signed by:

Anthony Mendiola, Acting Director Project Directorate 11 1 Division of Reactor Projects I/11 Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance: April 29, 1991

~

0FC

LA:fD2 : R R:PM:PD21:DRPR:AD:PD32:DRPR 4

,... :....,(dr : d t

,'(bkt NAME : pan'dja Gyuh DATE:/r--l)91

o Y/// /91

////91 f/ /

OFFICIAL RECORD COPY Summer Amdt 79231

ATTACHMENT TO LICENSE AMENDMENT NO. 98 TO FAClllTY OPERATING LICENSE NO. NPT-12 i

DOCKET NO. 50-395 Replace the following pages of the Appendix A Technical Specifications with the enclosed pages. The revised pages are indicated by marginal lines.

Remove Pages insert Pages 3/4 8-1 3/4 8-1 3/4 8-2 3/4 8-2 3/4 8-2a 3/4 8-2a 3/4 8-3.

3/4 8 3 i

~.

.r

3/4'8 ELECTRICAL POWER SYSTEMS 3/4.8.1 A.C. SOURCES 0_PERATING LIMITING CONDITION FOR OPERATION

3. 8.1.1 As a minimum, the following A.C. electrical power sources shall be OPERABLE:

a.

Two physically in9 pendent circuits between the offsite transmission network and the onsite Class IE distribution system, and b.

Two separate and ir. dependent Emergency Diesel Generators (EDG), each with:

1.

A separate day fuel tank containing a minimum volume of 300 gallons of fuel, 2.

A separate fuel storage system containing a minimum volume of 47,100 gallons of fuel, and 3.

A separate fuel transfer pump.

APPLICABILITY:

MODES 1, 2, 3 and 4.

ACTION:

a.

With one offsite circuit of 3.8.1.1.a inoperable:

1.

Demonstrate the OPERABILITY of the remaining offsite A.C.

sources.by performing Surveillance Require'nent 4.8.1.1.1 l

within I hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter, and 2.

If either EDG has not been successfully tested within the past 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, demonstrate its OPERABILITY by performing Surveillance Requirement 4.8.1,1,2.a.3 separately for each such EDG within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> unless the diesel is already operating, and 1

Restore the offsite circuit to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and COLD SHVTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />, b.

With one EDG of 3.8.1.1.b inoperable:

1.

Demonstrate the OPERABILITY of the A.C. offsite sources by performing Surveillance Requirement 4.8.1.1.1 within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> l

and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter, and 2.

If the EDG became inoperable due to any cause other than preplanned preventive maintenance or testing, demonstrate the OPERABILITY of the remaining EDG by performing Surveillance Requirements 4.8.1.1.2.a.3 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> *, and

SUMMER - UNIT 1 3/4 8-1 AMEN 0 MENT NO.

77,PA 98

ELECTRICAL POWER SYSTEMS LIMITING CONDITION FOR OPERATION ACTION: (Continued) 3.

Within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, verify that required systems, subsystems, i

trains components and devices that depend on the remaining EDG as a source of emergency power are also OPERABLE and in MODE 1, 2, or 3, that the Turbine Driven Emergency Feed Pump is OPERABLE.

If these conditions are not satisfied within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 5e in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUT 00WN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

4.

Restore the EDG to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STAN0BY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUT 00VN y

within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

l c.

With one offsite circuit and one EDG inoperable:

1.

Demonstrate the OPERABILITY of the remaining offsite A.C.

i source by performing Surveillance Requirement 4.8.1.1.1 I

within one hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter, and 2.

If the EDG became inoperable due to any cause other than preplanned preventive maintenance or testing, demonstrate the 4

OPERABILITY of the remaining EDG by performing Surveillance Requirement 4.8.1.1.2.a.3 within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> *, and 3.

Within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, verify that required systems, subsystems trains,componentsanddevicesthatdependonthe-remainIngEDG as source of emergency power are also OPERABLE and in MODE 1, 2, or 3, that the Turbine Driven Emergency Feed Pump is OPERABLE.

If these conditions are not satisfied within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLO SHUT 00WN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

4_

Restore one of the inoperable sources to OPERABLE status within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or be in at least HOT STANOBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />

-and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />, and 5.

Restore the other A.C. power source (offsite circuit or diesel generator) to OPERABLE status in accordance with the provisions-of Section 3.8.1.1 Action Statement a. or b., as ap)ropriate.-

with the time requirement of that Action Siatement 3ased on the time of initial loss of the remaining inoperable A. C power source.-

SUWER - UNIT 1 3/4 8-2 AMENDMENT NO. 77, 98 2...

~... -.

i j

e

~

ELECTRICAL POWER SYSTEMS i

LIMITING CONDITION FOR OPERATION (Continued) 4 l

l

. ACTION: (Continued) d.

With two of the required offsite A. C. circuits inoperable:

1 l

1.

Demonstrate the OPERABILITY of the two EDG's by sequentially performing Surveillance Requirement 4.8.1.1.2.a.3 on both within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, unless the EDG's are already oparating, and i

2.

Restore one of the inoperable offsite sources to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

3.

Following restoration or one offsite source, follow Action Statement a. with the time requirement of that Action Statement L

based on the time of initial loss of the remaining inoperable offsite A.C. circuit.

4 L

With two of the above required EDG's inoperable:

e.

1.

Demonstrate tha OPERABILITY of twc offsite A.C. circuits by.

i perfoming Surveillance Requirement 4.8.1.1.1 within one hour l

and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter, and 2.

Restore one of the inoperable EDG's to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT-STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

3.

Following restoration of.one EDG, follow Action Statement b.

with the time requirement of that Action Statement based on the time of initial loss of the remaining inoperable diesel generator.

SURVEILLANCE REQUIREMENTS

. 4.8.1.1.1 Each of the above required physically independent circuits between the offsite transmission network and the onsite Class IE distribution system

. shall be determined OPERABLE at least once per 7 days by verifying correct breaker alignment and-indication of power availability for each Class IE bus and its preferred offsite power source.

3 i

4 SUMMER - UNIT 1 3/4 6-2a AMENDMENT NO. 77i 98 w',

r.

.-~~

c.4

-,e m.

m.w.w r.-+

% n

..-,r-mm.,v.wmmm.

_w.w.w..,,

..nw

_,-,wr,,.,vr.,w,,,--,e%.2,ww..---e

e ELECTRICAL POWER SYSTEMS

$URVEILLANCE REQUIREMENTS (Continued) l P

4.8.1.1.2 Each EDG shall be demonstrated OPERABLE:

a.

In accordance with the frequency specified in Table 4.8-1 on a STAGGERED TEST BASIS by:

1.

Verifying the fuel level in the day tank and fuel storage tank.

2.

Verifying the fuel transfer pump can be started and transfers fuel from the storage system to the day tank.

3.

Verifying the diesel generator can start

  • and accelerate to i

synchronous speed (504 rpm) with generator voltage and frequent:y at 7200 2 720 volts and 60 t 1.2 Hz.

i -

4.

Verifying the generator is synchronized, gradually loaded

  • to an indicated 4150-4250 kW** and operates for at least 60 minutes.

b.-

At least once per 31 days and after each operation of the diesel where the period of operation was greater than or equal to I hour 4

by removing accumulated water from the day tank.

.c.

At least once per 31 days by checking for and removing accumulated water from the fuel oil storage tanks; d.-

By sampling new fuel oil in accordance with ASTM-04057 prior to addition to storage tanks and:

1)

By verifying in accordance with the tests specified in 1

ASTM-0975-81 prior to addition to the storage tanks that the sample has:

a.

An API Gravity of within 0.3 degrees at 60*F, or a specific gravity of within 0.0016 at 60/60'F, when compared to the supplier's certificate, or an absolute specific gravity at 60/60'F of greater than or equal to-0.83 but.less than or equal to 0.89, or an API gravity of greater than or equal to 27 degrees but less than or equal to 39 degrees; b.

A kinematic viscosity at 40'C of greater than or equal to I

1.9 centistokes, but less than or equal to 4.1 centistokes

-(alternatively, Saybolt viscosity,' SUS at 100'F of greater than or equal to 32.6, but not less than or.cqual-to 40.1), if gravity was not determined by comparison with p

the supplier's certification;

  • This. test shall be-conducted in accordance with the manufacturer's:recommenda-tions regarding engine prelube and warmup procedures, and as applicable-regard-ing loading recommendations.
    • This. band is meant as' guidance to avoid routine overloading of the engine.

Loads.in excess of this band shall not invalidate the test.

- SUP9IER - UNIT 1-3/4 8-3 AMEN 0MENTNO.{g,E

--