DUKE POWER GOMPm I'.O. HOx 33180 CIIAHLOTTE, N.O. 28242 IIAL IL TIJCKEH TELEPHONE September 8, 1983 poy. mo a

m.

,3.

MtT'. LEA A PBout ttog

/ Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Attention:

Ms. E. G. Adensam, Chief Licensing Branch No. 4 i

Subject:

Duke Power Company McGuire Nuclear Station Docket Nos. 50-369 & 50-370 i

Dear Sir:

I Please find attached five copies of Revision 1 to the Duke Power Company Response to Supplement 1 to NUREG-0737 for McGuire Nuclear Station. This document was originally submitted as an enclosure to my letter of April 14, 1983.

Revision I consists of proposed changes to the scheduled implementation date for the Upgraded Emergency Procedures and the scheduled operational date for the Safety Parameter Display System (SPDS) on McGuire Units 1 and 2.

These schedule revisions are necessary due to a delay in the issuance of the Westinghouse Owners Group Emergency Response Guideline background documents.

These documents are required for activities associated with the EP development program and the EP and SPDS training programs.

j Instructions for inserting Revision 1 into the McGuire document are included as part of the attachment. Unless otherwise informed by the Staff, Duke Power Company will assume that the proposed schedule changes described above are acceptable without further action.

Very truly yours,

/k' Hal B. Tucker 3

JSW:scs Attachment 8309150125 830908 PDR ADOCK 05000369 F

PDR

.i 1

Mr. Harold R. Denton, Director i

September 8, 1983 Page two cc:

Mr. J. P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Mr. R. A. Birkel, Project Manager Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Mr. W. T. Orders NRC Resident Inspector McGuire Nuclear Station l

l

)

e l

1 l

i

t I

DUKE POWER COMPANY MCGUIRE NUCLEAR STATION Response to Supplement 1 to NUREG-0737 i

Document Revision Transmittal i

Revision Number 1 Instructions i

Remove Page 2-6 Insert Page 2-6, Rev. 1 I

Remove Page 2-7 Insert Page 2-7, Rev. 1 i

Remove Figure 2-2 Insert Figure 2-2

^

Sheet 1 of 3 Sheet 1 of 3, Rev. 1 i

Remove Figure 2-2 Insert Fibure 2-2 I

Sheet 2 of 3 Sheet 2 of 3, Rev. 1 i

I e

f E

i

)

a 1

4 i

-.m,_,_

PROPOSED SCHEDULE FOR SUPPLEMENT 1 TO NUREG-0737 PROVISIONS -

MCGUIRE NUCLEAR STATION Milestone Activity Completion Date CRR o Steering Committee Formed October, 1981 o Program Concept January, 1982 o Review Team Selected February, 1982 o Final Draft of Review Plan May, 1982 o Plan Presentation to NRC May, 1982 o Bio Technology Hired for Human June, 1982 Factors Assistance o Mockup Space Rented and Construction July, 1982 Began o Review Phase Activities, Unit 1 May, 1983 o Assessment of Unit 1 HED's July, 1983 o Review Phase Activities, Unit 2 September, 1983 o Assessment of Unit 2 HED's November, 1983 o

SUMMARY

REPORT, UNITS 1&2 MARCH, 1984*

SPDS o Initial Design Basis & SPDS Approved May, 1982 o Initial Design V&V and Dynamic Testing November, 1982 o Revised SPDS V&V January,1984 o SPDS Training October, 1984 o SPDS Safety Analysis March, 1984 o SPDS OPERATIONAL UNIT 1 NOVEMBER, 1984*

o SPDS OPERATIONAL UNIT 2 NOVEMBER, 1984*

  • Indicates proposed commitment date Rev. 1 2-6

PROPOSED SCHEDULE FOR SUPPLEMENT 1 TO NUREG-0737 PROVISIONS -

MCGUIRE NUCLEAR STATION (cont'd) 4 Milestone Activity Completion Date Regulatory Guide 1.97 o Review Plan Development Begins January,1981 o Response to NRC as part of the Unit 1 Fuel Loading Licensing April, 1981 o Formal Review Plan Established June, 1982 i

o Review Phase May, 1983 o Assessment Phase March, 1984 o

R.G. 1.97 REPORT MARCH, 1984*

Upgraded EP Program o Plant Specific Technical Guideline October, 1983 Development o Plant Specific EP Development April, 1984 o Verification May, 1984 o Validation October, 1984 o Training October, 1984 o IMPLEMENTATION, NOVEMBER, 1984*

Emergency Response Facilities o RELOCATED E0F OPERATIONAL JULY, 1983*

Indicates proposed commitment date s

s

-s, Rev. 1 2-7 i

,,y.

.,v.

,,_.,,._.,.,_.-.,,,,_.m.

p.

7.

,_c.,_ _ _ _. _, _,, _..m.

.,,,n.~_-__,

,,,m,__

?.

j FIGURE 2-2 INTEGRATED SCHEDULE FOR IMPLEMENTING SUPPLEMENT 1 TO NUREG-0737 MCGUIRE NUCLEAR STATION SHEET 20F 3 UNITS 1 & 2 1932 1933 1934 ACTIVITY J

F M

A M

J J

A S

O N

D J

F M

A M

J J

A S

O N

D J

F M

A M

J J

A L

O N

D REVIEW ERG s & RELATED MATERIAL DEVELOP eCE CONDENSER & UHI SCENARIO REVIEW McGUIRE EPG INITIAL DEVELOPMENT REVIEW INITIAL EPG k

REVIEW ERG REVISION 1 5

o E

McGUIRE FINAL EPG DEVELOPMENT E

I McGUlRE EPG TRAINING MATERIAL w

DEVELOP McGUIRE EPs 8

w 8

REVIEW McGUIRE EP's E

>y EP VE RIFICATION 8

EP V ALIDATION f

w TRAINING EP IMPLE MENTATION 4>

lMPLEMI NTATICNONIT:L 1& '

l l

REVISION 1

, ~.

l FIGURE 2-2 INTEGRATED SCHEDULE FOR IMPLEMENTING SUPPLEMENT 1 TO NUREG-0737 SHEET 1 OF 3 MCGUIRE NUCLEAR STATION

- UNITS 1 & 2 1982 1933 19M ACTIVITY J

F M

A M

J J

A S

O N

D J

F V' M

J J

A S O N

D J

F M

A M

J J

A S

O N

D PLANNING & DEVELOPMENT t

t j

{

UNIT 1 REVIEW PHASE 5

s UNIT 1 ASSESSMENT PHASE 8

E UNIT 2 REVIEW PHASE

_Jo UNIT 2 ASSESWENT PHASE 5o

SUMMARY

MuoRT StIMMAR RI POF T PLANNING & DEVELOPMENT REVIEW PHASE 4

%o I

?o" ASSESSMENT PHASE & R.G.1.97 REPORT Rii.1. 67 IIEP(IRT SPDS DESIGN BASIS & APPROVAL INITIAL SPDS DESIGN & SOFTWARE DEVELOPED V&V l

TESTING ON UNIT 1 OAC j

REVISED SPDS DESIGN REVISED SOFTWARE o

SAFETY ANALYSIS h

v&v SPDS TRAINING j

SPDS OPERATIONAL

{

UNIT 1 tb UNIT 2 (p

l R EVISION I I

E k