Systematic Evaluation Program Status Summary Report.Data as of May 31,1983.(Buff Book)
ML20076J466
Person / Time
Issue date: 06/30/1983
From:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
To:
References
NUREG-0485, NUREG-0485-V05-N05, NUREG-485, NUREG-485-V5-N5, NUDOCS 8307050483
Download: ML20076J466 (67)


Text

.

NUREG-0485 Vol. 5, No. 5 May 31,1983 4

70 3 830630 PDR 0485 R I

SYSTEMATIC EVALUATION PROGRAM e

i STATUS

SUMMARY

REPORT F

F k

b UNITED STATES NUCLEAR REGULATORY COMMISSION p ccoq NhYh)

3 t

i i'

l 1

Available from NRC/GPO Sales Program Superintendent of Documents Government Printing Office Washington, D. C. 20402 A year's subscription consists of 12 issues for this publication.

I Single copies of this publication s

are available from National Technical information Service, Springfield, VA 22161 Microfiche of single copies are available from NRC/GPO Sales Program Washington, D. C 20555 i

NUREG4485 Vol. 5, No. 5 7

May 31,1983 SYSTEMATIC EVALUATION PROGRAM STATUS

SUMMARY

REPORT Prepared for: OFFICE OF NUCLEAR REACTOR REGULATION Prepared by: OFFICE OF RESOURCE MANAGEMENT I

UNITED STATES NUCLEAR REGULATORY COMMISSION

,f ~%,,,

7 0.T.

.x & be GlG(%S wpN G/l7lf3 l

William T. Russell, Chief Dennis Al. Crutchfield, Chi <f Systematic Evaluation Program Ilranch Operating Reactors tiranch 5 Division of Licensing Division of IJcensing i

Office of Nuclear Reactor Regulation Office of Nuclear Reactor Regulation

TABLE OFCONTENTS l

1 l

SECTION I SECTION ll SECTION lli OVERALL STATUS PLANT TOPIC REVIEWS IPSAR SUPPLEMENT SEP TOPIC LIST 1-2 to 13 BIG ROCK POINT 2-2 to 2-5 PALISADES 3 2 to 3-3 DRESDEN 1 2-6 GINNA 3-4 to 3-5 DEFINITIONS OF STATUS 1-4 DRESDEN 2 2-7 to 2-10 OYSTER CREEK 3-6 to 3-8 SEP TOPIC

SUMMARY

1-5 GINNA 2-11 to 2-14 DRESEDN 2 3-9 to 3-10 STATUS RF_ PORT HADDAM NECK 2-15 to 218 MILLSTONE 1 3-11 to 3-13 PROGRESS TOWARD 1-6 LACROSSE 2-19 to 2-22 i

COMPLETION (Graph)

MILLSTONE 1 2-23 to 2-26 INTEGRATED PLANT 17 SAFETY ASSESSMENT OYSTER CREEK 2-27 to 2-30 SCHEDULE PALISADES 2-31 to 2-34 SEP TOFIC STATUS BY 1-8 SAN ONOFRE 2-35 to 2-38 REVIEW DIVISION YANKEE 2-39 to 2-42 (Summary Table)

SUMMARY

TABLE 19 I

IPSAR SUPPLEMENT l

lSSUES I

SUMMARY

GRAPH 1-10 IPSAR SUPPLEMENT ISSUES h

ea.

m


a O

(J W

&)

l l

l l

SYSTEMATIC EVALUATION PROGRAM TOPIC LIST pip;c,

ggggg TOP lC p T i tL[

TW p HM 11-1 A. [uclusion Area Authority and C ont rol Ill-4 A. Tornado Miss tles IV.2 weactivity Control Systens Includtag Functional H. Populat son Distributton pesign and Protection Against $1ngle f attures

,1v-3 Bd Jet Pugs Operating Indications

. Potenttal Hazards or Changes se Potential B. Turbine Missiles Hazards Dae to f ranwort ation. Inst itut t onal M

%Na e Ms W umm 00 CTR I ndust r i a l, and M s ittery t ac t litles 111 4 C. Internally Genere'ed Missiles

11. ?

A. Severe weather Phenonena f-2 App 1tcable Code Cases

  • B. unsite Meteorological nessurearnts Program V-3 0 erpressurization Protectton t

(

C. Atmospheric f ransport and Dif f usion (harac-W-4' Piping and Safe End Integrity teristics for Accident Analysis D. 5tte Pronimity Missiles (Includin.; Aircraf t) r V-5 Reactor Coolant Pressuro Boi.ndary (RCPS) l

  • D.

Avatlability of Meteorological Data in the

!!! 5 A. Ef fects of Ptpe Brea on Structures. Systeas Leak age. Detection Control Room t

and Coatonents Inster Containment V-6 seactor v ssel Integrity e

!!-3

. Hydrologic Description B. Pipe Break outside Containment l

g lil.6 Setsaic Deste Constsrations B. I looding Potent tal and Protect son Require-V-8*

Steam Generator (5G) Integrity l

Ill-7 A. Inservice Inspection. Including Prestressed V9 Reactor Core Isolation Coottng System (SW) i tapabiltt= of Operat tng Plant to Cove with Design Basis f loodin9 Conditions Concrete tontainaents with t Ither 1. routed or Ungrouted Tendons L. 5Atet y-related Water SuppIf (Ultinate Heat 5 i nh (UH5))

B. Design Codes. Design Crtteria. L oad O* RHR Rellaht] tty ConDinat tons. and Reactor Cavity DestP V.))

A.

equirgaents f or Isoletton of Mtgh and Low

!!-4

.estoqr and setsaioloqr ssum Systems 9 Tect.edc Province

. Delaminat ton of Prest rrsted Concrete Con-taing et Structures

& RHR Welock R@ mets B. Prostet ty of Capable Tectonic struttures D. Contatorent 5tructural Integrity Tests V-12

,A. het er P tt of Botling Water Peactor tn Plant Va tnit y c

111-8 A. L : ose Pa-ts Monitoring and Core Barrel L. Hist or tul SetWic it y u tt t' e n iJls Miles of P lant VIbret ton Monttortng B. Control Rod Drive Mechanism Integrity VI-l Organtc Materials and Post Accident J. 5t ahllst y of Slwes C hemi st ry C. Irradiat ion DaatagP. tise of Sees ttired L. Dam I nt eyr t ty Stataless Steel ard I at t94e #eststance II*2

, A. Pressure-Suppression Type Best Contataarnts

. U. Core Sup. orts and F uel Integrity B. Subcovertment Analysts I. Settlearot of F oundat ions and Burted C. Ice Condenser Contatnment g o i g.,,,t Ill-9,

Support latege.tv y

111 10 A. Thernial-Overload Protett ton f or Mot ors of D. Mass and Energy Release for Possible Pipe treak inside Containment 111 1 t 14ss if ic at eun of st ria t ures. C oas o~nt s and Motor-operated Valvas h tt emb ('

isolc 4M Nalit y )

6. Puns ilyancel Int egrity VI-3 Containment Pressure and Heat Resiaval Illal ut ad aed f ornado t dedinyg Capability

!!!-3 A. l f f ects of H tt wat er tevel on $1ructureg 1 t er Ms and Unscher Je Valves V I-4 Cont. Inment Isolation System It!-l1*

o% onent i nt egrit y VI-5*

Costustible Gas Control B. St ructural and utner C ansequences (e.9 I luoete ng of Saf et y-helated l yuipmePat W

VI*6 Containment teak Testing P ouvat s ) of f ailure of ge*rdrain 5Weas

! tl fl Levironwnt al Qualificatinn of Saf ety Related t gavpmrat i, inservice inve(tion of Water Coctrol St ruc.

IV.I S. (geret ton with Le+ s Than All loops in-tervice t ures

_w 1.

SYSTEMATIC EVALUATION PROGRAM TOPIC LIST D IC 8 W

TOPIC a

_f i f ti V I-7. A

1. [CCS Re-evaluation t o Account f seased y g g.g Instruments f or Mo'*ltoring Radiation and Process IV-5 Loss of Normal Feeenater Flow Vessel Head Temerature Variables curing Accidents IV-6 Fecenater System Pope Sreaks InsIde and Outstde
2. Upper Plenum i nject io" Vll-b rrequency Decay Contatawat (PWR)
3. ECCS Actuet ton System V 11-7 Acceptabiltty of Swing Sus Design on BWR-4 gy.?

Peactor Coolant Puay Rotor Seizure and Plants Peettor Coolant Pusp shaf t Breat

4. Core Spray horrie E f f ectiveness V 111-1 A. Potenttal Equipment Fatlures Assoctated with IV-8 Control mod Mtsoperatton ($ystem Malfmtion V i-1. 8 (SF Switchover f rom lnytion to sec t rculat ion a Degraded Grid Voltage or operatcr Irror)

Mode (Autonut tc [CC% Realignent)

V!!! 2 Onsite Emergency Power Systems - triesel ny.g Startup or as Inacttve Loop or Rectrculatton V I-7.C I CCS Si ngle F a t ie ~ t erion and Require-L.enerator Loop at an Incorrect Temerature, and Flow meets f or Lod ing.,

mer to Valves Controller Malfunction Causing an increase in including indeb er w

  • I nt erlock s on Will-3 A. Station 8attery Capacity Test Requirewnts 84 Core Flow Rate XV-10 Chemical and volume Control System Malfunction
8. DC Power S.ystem Sus Volta
  • Monitortng and that Results in a Decrease in the Boron Concen-
1. Appendis IL - E lectrical Instrumentation Annunci at ion g y,. ton in the Reactor Coolant (Pift) and Control (LIC) Re-reviews Vill-4

[lectrical Penetrations of Reactor Contatnpent FV-11 Inadvertent Leading and Operatton of a Fuel

2. Failure Mode Analysis - [CC5 Assesely in an !sproper Position 11-1 f uel Storage
3. The E f f ect of PWR Loop Isolation Valve XV-12 5pectrum of Rod Ejection Accidents (PW)

Clowre During a LOC A on (CC5 Perf ornunce e

12-2 Overfiedd Handit ng Systemis - Crees V I-7.D Long Term Cooling - Passive f ailures (e.g..

IV-13 Spectrum of Rod Drop Accidents (Sist)

Flooding of Redundant Cogonents)

IX-3 Station Service and Cooling Water systens n-advment Opwada W f 2 and Mcal V I-1.E ICC5 Sum Destin and Test for Rectrculation II-4 Boron Addition System N5 '"

Mo4e if f ectiveness increases Reactor Coolant Inventory 11-5 Ventilation Systems V a - 7.f Accumulator Isolatton Valves Power and Control gy.15 Inadvertent Opening of a Pndt Pressurtser Safety-

System Design

11-6 f tre Protection Reitef valve or a BWR Safety /Itelief Valve V I-8 Control Room Habitabtlity A

Austitary f eessater System IV-16 Radioloatcal Consequences et Failure of Small Lines Carrytng Prtmary Coolant Outstde Contain-VI-9 Main 5 team Line Isolation Seal System - SWR X1-1 Appendta !

,,,g VI-10 A. Testtng of Reactor Trip System and Engineered a l-2 Radiological (if fluent and Process) Monitoring IV-17 Steam Generator Saf ety Features including Rev anse Itaie S y st ems Tube Failure (PwR) lesting 11!!-l Conduct of Operat ans IV-18 Radiological Consequences of Ma;n Steam B. Shared E ngineered Safety t esti.res. On-site Line Fatlure Outside Containment (Shst)

[mergency Pnwer, and service Systems f or a l t !.2 Saf eguards/ industrial kcurity Multiple Unit I acilities IV-19 Loss-of-Coolant Accidents Resulting f rom RV-l Decrease in Fee 4.at er f eaperature. Increase in Spectrum of Postulated Piping Breaks Within VII-I A Isolation of Reactor Protection System f ran f ece ater F Inw. Increase in Steam flaw and the Reactor Coolant Pressure Boundary Non-54f ety %ystess. Including Quellf ttatica's inadvertent Opening of a Steam Generator Nelief of Isolat ton Devices or af ety Wat v, IV-20 Radiological Consequences of Fuel Damaging Accidents (Instde and Outside Contatnment)

8. Trip uncertainty and 5etpoint Analysis Review g y.2 w t w of 5 team System Piping Failures Inside of Operating Data Base mt Outside of Cont ainnent (Puu)

H-Spent Fud Cask pop Acchets Vll-2 ingineered Safety Features (E5F) System Control XV-3

.uss of ( sternal Load. Turbine Trip. L oss of

~

N' Logic and Design Condenser vacuum, C lowre of Main Steam Isole-IV-23 Mutttple Tube Failures in steam Generators t ton valve (bur). and St eam Preswre Replator Vil-3 Systems Required f ar saf e Shutdown f as ture (Closed) g gy Vll.4 t f f ects of Failurs in ison-5af ety Related I

n-f aergency A-C Power to the St ation g

XVI Technical Specifications nstens on Selected Engineered Saf ety f eatures XVil Operattonal QA Program

  • Tcipic deleted from SEP program due to duplication by Three Mile Island (TMil NRC Action Plan. Unresolved Safety issue or other SEP Topic per May 7,1981 letter from G Lainas to all SEP Lecensees..

1-3

STATUS DEFINITIONS G - Generic 4a-Draf t SE Received From Review Eranch These topics are being evaluated as part of on-going NRC generic review effort. The ongoing This status is used for internal NRC tracking of generic review and the SEP topic review will be topic review progress-The status indicates that closely integrated to improve the effectiveness a draf t topic safety evalustion is under mange-and efficiency of these efforts and to minimize ment review.

any impact on licensees. The status and conclu-sions of generic SEP topics will be incorporated in the final safety assessment for each plant.

4b - SAR Received from Licensee Licensee has submitted a Safety Analysis Report X - Deleted (S AR) in accordance with SEP redirection. (See

^

Eisenhut letter to SEP owners of January 14,1981)

These topics have been verified as not applicable The S AR is under review and a Final NRC safety to the design of a specific plant or ar being evaluation (status 7) is being prepared. Draf t SE duplicated by the NRC YMI Action Plan, will not be issued for topics with licensee SAR submittal.

Unresolved Safety issue or another SEP Topic per the May 7,1931 letter from G. Lainas to all SEP licensees.

5 - Draft SE Sent to Utility 0 - Topic Not Started A draf t topic safety evaluation h as been formally transmitted to the licensee for their review and This status indicates that the review of the topic certification of the accuracy of the described has not started.

f acility. Licensees may comment upon NRC conclusions or propose alternatives to NRC posi-tions.

1 - Questions Received From ' Review Branch 6 - SE Response Received This status is used for internal NRC tracking by NRC of topic review progress. The status indicates that all information necessary to perform a The draft SE has been reviewed and licensee topic evaluation is not available and that ques-comments if any have been formally transmitted tions have been developed and sent to the SEP to the N RC.

branch.

7 - Topic Com plete 2 ~ Questions Sent to Utility The NRC topic evaluation has been completed and a final safety evaluation issued. A topic is completed The questions developed in the previous status in several ways. (1 ) The licenses has responded have been formally transmitted to the licensee that the NRC draft safety evaluation (i.e. status 5) as a request for additional information.

is correct, or (2) the licensees comments or the NRC draf t safety evaluation (i.e. status 6) have been re-3 - Question Response viewed and if appropriate incorporated into the Received by N RC final safety evaluation, or (3) the licensee has not responded ire the time requested, thus concurring The licensee has formally responded to the informa-that the draf t safety evaluation is correct.

tion request issued by NRC regarding the topic.

14

SEP TOPIC STATUS

SUMMARY

REPORT M

\\

\\

HUMBER OF QUESTIONS QUESTION DRAFT SE SAR SE N

TOPICS TOPIC RECEIVED QUESTIONS

RESPONSE

RECEIVED RECEIVED DRAFT SE

RESPONSE

TOPIC

\\

GENERIC DELETED NOT FROM SENT TO RECEIVED FROM FROM SENT TO RECEIVED COMPLETE

\\

(G)

(X)

STARTED REVIEW UTILITY BY MRC REVIEW LICENSEC UTILITY BY NRC (7)

PLANT NAME

\\

(0)

BRANCH (2)

(3)

BRANCN (4b)

(5)

(6)

N (1)

(4a)

N PALISADES 0

47 0

0 0

0 0

0 0

0 98 GINNA 0

45 0

0 0

0 0

0 0

0 92 OYSTER CREEK 0

54 0

0 0

0 0

0 0

0 83 DRESDEN 2 0

49 0

0 0

0 0

0 0

0 88 MILLSTONE 1 0

51 0

0 0

0 0

0 0

0 86 HADDAM NECK 0

47 0

0 0

0 0

0 0

0 9%

YANKEE O

48 0

0 0

0 0

0 0

0 89 1/

LACROSSE O

54 0

0 0

0 l'

O O

O 82 BIG ROCK POINT 0

52 0

0 0

0 0

0 0

2 83 SAN ONOFRE O

48 1

0 0

2 0

1 4

2 79 DRESDEN 1 TOTALS THIS MONTH 0

495 1

0 0

2 1

1 4

4 862 TOTALS LAST MONTH 0

495 1

0 0

2 1

1 4

9 857 i

w NOTE: Totals do not include Dresden 1 see page 2-6.

Also included is May 7, 1981 deletion letter to all SEP licensees, see footnote page 1-3.

1/ FIRE PROTECTION GENERIC ISSUE SER 1-5

con ACTUE SYSTEMATIC EVALUATION PROGRAM PHASE II PROGRESS TOWARD COMPLETION 100

. M.

g. n. M.

e..

.g g.g.g.g.

m g.

N*

/.

. M.

./.

Cn.

.,e

. g 80 _

,f.

p.

. ca.

A

./

Sf.

H 70 - -.

. g.

M_.

- 5; mote.

,,io, to mos.ne.or ao. i i t e j

.r f.

. g:7.,,

=i hted wooni sia nouneuse.

./

generic topice in tho proyees g.

toward completion.

g,,,,,

g g y x

./.

y

. moundusse -

s

/. *.

4 418.

80%

50 -

s-

..n. g.

7

..os

. ioog 48 _,.

~

~

The pasat topic oserell compistion status (percent complese) is colculated-nesse upon th. numn., of topic reais.: to he performes anot inausin. -

30 -

dessied iopic.) and e - htes eserese of cu reni topic r.ais-.tet The.-

calculation is performed using the follo-ing formula:

I Percent Complete =Suntof Tonics in Status x Weiehtine Feetor of Status $

I 2@ -

S.um et.Topu.s la __

APR JUN JUN SEP DEC MAR JUN SEP DEC ER JUN.

FY-81 FY-82 FY-83 1-6

INTEGRATED PLANT SAFETY ASSESSMENT REPORT (IPSAR) SCHEDULE l

TOPIC ALL TOPIC ISSUE DRAFT IPSAR ISSUE ISSUE PLANT HAME TECHNICAL IPSAR FOR TO EDO AND IPSAR IPSAR COMPLETE REVIEWS ACRS REVIEW COMMISSION FINAL SUPPLEMENT TO DL 1/

l PALISADES 100 02/26/82C 04/01/82C 09/15/82C 10/29/82C 07/31/83 GINHA 100 02/24/82C 05/27/82C 09/30/82C 01/03/83C 07/31/83 j

i OYSTER CREEK 100 06/28/82C 09/30/82 12/21/82C 02/09/83C 03/31/84 DRESDEN 2 100 07/02/82C 10/29/82C 01/12/83C 03/01/83C 09/30/83 MILLSTONE 1 100 06/27/82C 11/05/82C 01/27/83C 03/16/83C 01/30/84 YANKEE 100 11/24/82C 02/11/83C 05/27/83C LACROSSE 100 12/02/82C 04/15/83C 07/29/83 02/28/84 HADDAM HECK 100 09/30/82C 03/18/83C 06/30/83 BIG ROCK POINT 99 12/16/82C 08/05/83 09/30/83 SAH ONOFRE 97 02/07/83C TBD TBD 1/ Schedule for each topic for each plant is specified.

OVERALL COMPLETION : 99.6%

TBD-to be determined. Licensee reassing schedule, plant is shutdown.

1-7

SEP TOPIC STATUS by REVIEW DIVISION

SUMMARY

TABLE PLANT PALISADES GINNA OYSTER DRESDEN MILLSTONE HADDAM YANKEE LACROSSE BIG SAN TOTAL CREEK 2

1 NECK ROCK ONOFRE POINT (IAPM) 1/

Michaels Persinko Cwalina Cwalina Persinko Brown Boyle Michaels Scholl McKenna NO. OF TOPICS 137 137 137 137 137 137 137 137 137 137 1370 DELETED 2/

47 45 54 49 51 47 48 54 52 48 495 APPLICABLE 90 92 83 88 86 90 89 83 85 89 875 57

/

39

/

35

/

36

/

37

/

38

/

38

/

35

/

38

/

37

/

390 /

DL

/

/

/

/

/

/

/

/

/

/

/

/ 57

/ 39

/ 35

/ 36

/ 37

/ 38

/ 38

/ 35

/ 38

/ 40

/ 393 TECHNICAL

/

/

/

/

/

/

/

/

/

/

/

17

/

20

/

19

/

22

/

20

/

20

/

20

/

20

/

17

/

16

/

198 /

REVIEW DOE

/

/

/

/

/

/

/

/

/

/

-/

/ 17

/ 20

/ 19

/ 22

/ 20

/ 20

/ 20

/ 20

/ 17

/ 17

/ 192 ASSIGNMENT 1/

/

/

/

/

/

/

/

/

/

/

/

16

/

33

/

29

/

30

/

29

/

32

/

31

/

28

/

30

/

32

/

290 /

DSI

/

/

/

/

/

/

/

/

/

/

/

/ 16

/ 33

/ 29

/ 30

/ 29

/ 32

/ 31

/ 28

/ 30

/ 32

/ 290

/

/

/

/

/

/

/

/

/

/

/

90

/

92

/

83

/

88

/

86

/

90

/

89

/

83

/

85

/

85

/

871 /

COMPLETE

/

/

/

/

/

/

/

/

/

/

/

/ 90

/ 92

/ 83

/ 88

/ 86

/ 90

/ 89

/ 83

/ 85

/ 89

/ 875

/

/

/

/

/

/

/

/

/

/

/

TARGET DATE -

ALL TOPICS JAN 82 JAN 82 MAY 82 JUN 82 JUN 82 AUG 82 AUG 82 SEP 82 SEP 82 DEC 82 TECHNICAL REVIEWS TO DL 1/ Division of Licensing Integrated Assessment Project Manager 2/ Deleted as not applicable, or duplicated by USI, TMI Action Plan, or another topic.

1/ These schedules and assignments are consistent with NRR FY 1982-1984 Operating Plan.

I/

__,/

No. Completed / No. Assigned 1-8 STATUS AS OF MAY 31, 1983

/

/

/

/

/

/

/

/

/

/

L 1

A 1

1 0

4 T

6 1

6 4

S 4

1 0

0 6

6 O

T

/

/

/

/

/

/

/

/

/

/

3 8

/

/

/

/

/

9 1

E a

/

/

/

/

/

R n

MF n

1 AO e

3 SN K O

c M

/

/

/

/

/

Y

/

/

/

/

/

A M

/

/

/

/

/

/

/

/

/

/

F O

Tl GKNl S

ICI o BOOh A

RPc S

/

/

/

/

/

S

/

/

/

/

/

U T

/

/

/

/

/

A E

s

/

/

/

/

/

T S

S l

S e

O a

R h

C c

/

/

/

/

/

A i

L M

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

E e

E l

K y

N o

A B

Y

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

M n

AK w

DC o

S DE r

E AN B

U H

/

/

/

/

/

S

/

/

/

/

/

S EI E

/

/

/

/

/

L N

o

/

/

/

/

/

BT O

k AN T

n 2

2 1

2 TE S1 i

1 2

1 0

1 0

1 0

0 0

1 9

M L

s YE L

r 1

RL I

e

/

/

/

/

/

AP M

P

/

/

/

/

/

MP MU

/

/

/

/

/

US N

a

/

/

/

/

/

S E

n i

o 9

0 R

D 1

2 0

0 1

1 2

0 8

A S2 l

t S

E a

P R

w I

D C

/

/

/

/

/

/

/

/

/

/

/

/

/

/

a

/

/

/

/

/

R n

i 3

3 2

3 EK TE l

2 2

2 1

2 1

1 0

0 2

2 SE a

YR w

OC C

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

o

/

/

/

/

/

A k

N n

8 d

1 1

0 1

0 0

1 N

i 8

S 8

I s

e G

r n

e

/

/

/,

/

/

g P

/

/

L

/

/

is S

/

/

/

/

/

s E

s

/

/

/

/

/

A D

l A

e S

a 8

6 8

2 6

2 2

0 0

2 8

o I

h H

L c

/

/

/

/

/

/

A i

P M

/

/

/

/

/

d e

E I

v L

O S

i D

D D

ec e

R S

o T

L D

N N

EA E

)

E ET U

T M

RMS ST S

N P

AEE NI S

A A

SLU EM F

T I

/_

L I

PPS CB F

U P

(

IPS IU A

R P

R S

S S I

S I

UI LS T

E N

E

/

ALL PLANTS TACS 79 LIC. RESP. REC'D 60 --

f' SER INPUT REC'D l

I SER ISSUED 58 --

GOAL 40 --

,/

l 3g --

l l

28 --

/

/

l f

f ig __

/

/

_.,f f, DEC JAN FEB MAR APR MAY JUN JUL AUG SEP GCT NOV DEC JAN FEB MAR APR LIC RESP REC'D 5

8 8

12 16 17 SER INPUT REC'D 1

1 1

1 5

8 SER ISSUED 1

1 1

1 3

6 GOAL B

B B

1 4

6 14 26 42 47 58 51 51 51 61 1

(1-18) 4 s

6 m

_._.__..,u._

'l I

C Cl>

LaJ C#3 l

l t

i i

e

BIG ROCK POINT FACILITY 8 BIG ROCK POINT 1 TOPIC HO.

REVIEW STATUS REMARKS DIV/BR LICENSEE CONSUMERS POWER 11-1 A.

DL/SEPB 7

CPCo to NRC 09/02/80 REGION /LOCATIOH: 4 MILES HORTH EAST OF CHARLEVOI, MICH.

II-l.B DL/SEPB 7

HRC TO CPC0 09/02/80 DOCKET NO.

05000155 II-1 C.

DL/SEPB 7

HRC to CPCo 05/13/81 POWER CAPACITY: 0240(THERMAL) 067(ELECTRICAL)

II-2 A.

DSI/AEB 7

HRC to CPCo 08/03/81 OL NUMBER: DPR-6 II-2 B.

X HRC to CPCo 05/07/81 H.S.S.S.-

GE.

II-2 C.

DSI/AEB 7

HRC TO CPCO 10/26/82 A/E FIRM: BECH.

II-2 D.

X HRC to CPCo 05/07/81 SYSTEMATIC EVALUATION PROGRAM BRANCH CHIEF: W. RUSSELL II-3 A.

DE/HGEB 7

HRC TO CPC0 10/26/82 OPERATING REACTORS BRANCH CHIEF: D. CRUTCHFIELD II-3 B.

DE/HGEB 7

HRC TO CPCO 10/26/82 OPERATING REACTORS PROJECT MAHAGER: R.

EMcH II-3 B.

1.

DE/HGEB 7

HRC TO CPCD 10/26/82 SCHOLL [ h INTEGRATED ASSESSMENT PROJECT MANAGERt R.

II-3 C.

DE/HGEB 7

HRC TO CPCO 10/26/82 II-4 DE/GSB 7

HRC to CPCo 06/08/81 KEY FOR STATUS CODES II-4 A.

EE/GSB 7

HRC TO CPC0 10/12/82 II-4 B.

DE/GSB 7

HRC TO CPCO 10/12/82 G - GENERIC 4a-DRAFT SE RECEIVED FROM REVIEW BRANCH II-4 C.

DE/GSB 7

HRC to CPCo 06/08/81 X - DELETED 4b-SAR RECEIVED FROM II-4 D.

DE/HGEB 7

HRC TO CPC0 07/c5/82 0 - TOPIC HOT LICENSEE STARTED 5 - DRAFT SE SENT II-4 F.

DE/HGEB 7

HRC TO CPCO 07/20/82 1 - QUESTIONS RECEIVED TO UTILITY FROM REVIEW BRANCH III-1 DL/SEPB 7(SYS)

HRC TO CPC0 04/16/82 6 - SE RESPONSE RECEIVED DL/SEPB 7(ELEC) Part of VII-3 C8/19/81 2 - QUESTIONS SENT BY HRC TO UTILITY III-2 DL/SEPB 7

NRC TO CPC0 12/09/82 7 - TOPIC COMPLETE 3 - QUESTION RESPONSE RECEIVED BY NRC (2-2)

BIG ROCK POINT TOPIC HO.

REVIEW STATUS REMARKS TOPIC HO.

REVIEW STATUS REMARKS DIV/BR DIV/BR III-3 A.

DE/SES 7

HRC TO CPCO 12/02/82 III-10 B.

X HRC to CPCo 11/16/79 III-5 B.

X HRC to CPCo 12/26/80 III-10 C.

X HRC to CPCo 11/16/79 III-3 C.

DE/AGEB 7

NRC TO CPCO 10/12/82 III-11 X

NRC to CPC0 05/07/81 III-4 A.

DSI/ASB 7

HRC TO CPC0 11/29/82 III-12 X

HRC to CPCo 05/07/81 III-4 B.

DE/MTEB 7

NRC TO CPCO 11/29/82 IV-1 A.

DL/SEPB 7

NRC to CPCo 10/08/81 III-4 C.

DSI/ASB 7

HRC TO CPCO 10/14/82 IV-2 DSI/ICSB 7

CPCo to NRC 12/22/81 III-4 D.

DE/SAB 7

NRC TO CPC0 08/12/82 IV-3 X

HRC to CPCo 05/04/81 III-5 A.

DL/SEPB 6

CPC0 TO HRC 02/15/83 V-1 X

HRC to CPCo 11/27/81 III-5 B.

DL/SEPB 7

NRC TO CPCO 09/16/82 V-2 X

HRC to CPCo 11/16/79 III-6 DL/SEPB 7

HRC TO CPCO 10/18/82 V-3 X

HRC to CPCo 05/07/81 III-7 A.

X HRC to CPCo 05/07/81 V-4 DE/MTEB 7

CPC0 TO HRC 02/18/83 III-7.B DL/SEPB 7

HRC TO CPCO 09/30/82 V-5 DL/SEPB 6

CPCO TO HRC 09/30/82 III-7 C.

X NRC to CPCo 11/16/79 V-6 DL/SEPB 7

HRC to CPCo 03/05/80 III-7 D.

DE/SEB 7

HRC TO CPCU 03/17/82 V-7 X

HRC to CPCo 11/16/79 III-8 A.

DSI 7

NRC TO CPCO 03/02/82 V-8 X

NRC to CPCo 05/07/81 III-8 B.

X NRC to CPCo 09/26/80 V-9 X

NRC to CPCo 11/16/79 III-8 C.

DL/SEPB 7

NRC TO CPC0 06/23/82 V-10 A.

DL/SEPB 7

HRC to CPCo 10/09/79 III-8 D.

X HRC to CPCo 05/07/81 V-10 B.

DL/SEPB 7

NRC TO CPC0 09/10/82 III-9 X

NRC to CPCo 05/07/81 V-11 A.

DL/SEPB 7(ELEC) NRC TO CPC0 12/15/82 III-10 A.

DL/SEPB 7

NRC TO CPCO 02/28/83 V-11 B.

DL/SEPB 7(SYS)

HRC TO CPC0 09/10/82 7(Elec) NRC to CPCo 12/15/82 (2-3)

lilIGiIll0kC;ttl'I0lll4fl' TOPIC NO.

REVIEW STATUS REMARKS TOPIC NO.

REVIEW STATUS REMARKS DIV/BR DIV/BR V-12 A.

DL/SEPB 7

NRC to CPCo 10/09/79 VI-7 D.

DL/SEPB 7

NRC to CPCo 08/17/78 V-13 X

NRC to CPCo 05/07/81 VI-7 E.

X NPC to CPCo 05/07/81 VI-1 DE/CEB 7

HRC TO CPCO 11/24/82 VI-7 F.

X NRC to CPCo 11/16/79 VI-2 A.

X NRC to CPCo 05/07/81 VI-8 X

NRC to CPCo 05/07/81 VI-2 B.

X NRC to CPCo 05/07/81 VI.-9 X

HRC to CPCo 11/16/7*

VI-2 C.

X NRC to CPCo 11/16/79 VI-10 A.

DL/SEPB 7

NRC TO CPC0 11/09/82 VI-2 D.

DSI/CSB 7

NRC TO CPCO 11/30/82 VI-10 B.

X NRC to CPCo 11/16/79 VI-3 DSI/CSB 7

NRC TO CPC0 11/30/82 VII-1 A.

DL/SEPB 7

HRC TO CPCO 09/02/82 VI-4 DSI/CSB 7(SYS)

HRC TO CPCO 12/09/82 VII-f B.

DL/SEPB 7

NRC to CPCo 08/17/78 DL/SEPB 7(Elec) HRC to CPCo 11/24/81 VII-2 DL/SEPB 7

HRC to CPCo 02/01/82 VI-5 X

NRC to CPCo 05/07/81 VII-3 DL/SEPB 7(SYS)

HRC TO CPC0 09/10/82 VI-6 DSI/CSB 7

HRC TO CPC0 11/23/82 DL/SEPB 7(Elec) HRC to CPCo 12/17/82 VI-7 A.

1.

X NRC to CPCo 11/16/79 VII-4 X

NRC to CPCo 05/07/8?

VI-7 A.

2.

X NRC to CPCo 05/07/81 VII-5 X

NRC to CPCo 05/07/81 VI-7 A.

3.

DL/SEPB 7

NRC TO CPCO 05/20/82 VII-6 DL/SEPB 7

HRC to CPCo 09/21/81 VI-7 A.

4.

DSI/RSB 7

HRC to CPCo 04/10/79 VII-7 X

HRC to CPCo 11/16/79 VI-7 B.

DSI/RSB 7(Elec) CPCo to NRC 05/20/A2 VIII-1 A.

DSI/PSB 7

NRC TO CPCO 07/08/82 7(SYS)) CPCo to NRC 05/20/82 VIII-2 DL/SEPB 7

NRC TO CPC0 08/02/82 VI-7 C.

DL/SEPB 7

NRC to CPCo 08/05/81 VIII-3 A.

DL/SEPB 7

CPCo to NRC 04/22/81 VI-7 C.

1.

DL/SEPB 7

NRC to CPCo 02/22/82 VIII-3 B.

DL/SEPB 7

NRC to CPCo 02/22/82 VI-7 C. 2.

DL/SEPB 7

HRC to CPCo 08/05/81 VIII-4 DL/SEPB 7

NRC TO CPC0 07/01/80 VI-7 C.

3.

X NRC to CPCo 11/16/79 (2-4)

BIG ROCK POINT TOPIC NO.

REVIEW STATUS REMARKS TOPIC NO.

REVIEW STATUS REMARKS DIV/BR DIV/BR IX-1 DSI/ASB 7

NRC TO CPCO 06/02/82 XV-10 X

NRC to CPCo 11/16/19 IX-2 X

HRC to CPCo 05/07/81 XV-11 DSI/CPB 7

NRC to CPCo 12/02/81 IX-3 DL/SEPB 7

NRC TO CPC0 09/29/82 XV-12 X

NRC to CPCo 11/16/79 IX-4 X

NRC to CPCo 11/16/79 XV-13 DSI/CPB 7(Sys)

HRC te CPCo 12/02/81 DSI/AEB 7(DOSES) HRC to CPCo 01/12/82 IX-5 DL/SEPB 7

NRC TO CPCO 10/12/82 XV-14 DSI/RSB 7

NRC to CPCo 08/18/81 IX-6 DSI/ASB 7

NRC TO CPC0 03/08/83 XV-ti DSI/RSB 7

NRC to CPCo 08/18/81 X

X NRC to CPCo 05/07/81 XV-16 DSI/AEB 7

NRC to CPCo 12/28/81 XI-1 X

NRC to CPCo 12/04/81 XV-17 X

NRC to CPCo 11/16/79 XI-2 X

NRC to CPCo 12/04/81 X"-18 DSI/AEB 7

NRC TO CPC0 09/15/82 XIII-1 X

NRC to CPCo 05/07/81 XV-19 DSI/RSB 7(Sys)

NRC to CPCo 08/18/81 XIII-2 DL/SSPB 7

NRC to CPCo 03/11/81 DSI/AEB 7(DOSES) NRC TO CPC0 10/20/82 XV-1 DSI/RSB 7

NRC TO CPC0 06/25/82 XY-20 DSI/AEB 7

NRC to CPCo 01/12/82 XV-2 X

NRC to CPCo 11/16/79 XV-21 X

NRC to CPCo 05/07/81 XV-3 DSI/RSB 7

NRC to CPCo 06/18/82 XV-22 X

NRC to CPCo 05/07/81 XV-4 DSI/RSB 7

NRC to CPCo 10/16/81 XV-23 X

NRC to CPCo 05/07/81 XV-5 DSI/RSB 7

NRC to CPCo 02/08/82 XV-24 X

NRC to CPCo 05/07/81 XV-6 X

NRC to CPCo 11/16/79 XVI X

NRC to CPCo 11/05/80 XV-7 DSI/RSB 7

HRC TO CPC0 03/11/82 XVII DL 7

NRC to CPco 08/17/78 XV-8 DSI/CPB 7

NRC to CPCo 12/31/81 XV-9 DSI/RSB 7

NRC TO CPC0 04/07/82 (2-5)

DRESDEN1 FACILITY: DRESDEN 1 LICENSEE: COMMONWEALTH EDISON

(

REGION /LOCATIDH: 9 MILES EAST OF MORRIS, ILL.

DOCKET NO.'

05000010 POWER CAPACITY: 700(THERFAL) 200(ELECTRICAL) l OL NUMBER: DPR-2 j

N.S.S.S.

GE.

A/E FIRM: BECH.

SYSTEMATIC EVALUATION PROGRAM BRANCH CHIEF: W.

RUSSELL 05'ERATING REACTORS BRANCH CHIEF: D. CRUTCHFIELD OPERATING REACTORS PROJECT MANAGER:

J. GILBERT By letter dated December 31, 1980 Commonwealth Edison indi-cated that Dresden 1 was undergoing an extensive modifica-tion and was not scheduled a or restart until June, 1986.

Also, by letter dated April 4, 1981, in response to the NRC's January 14, 1981 letter on SEP redirection the licen-see stated that the Dresden 1 SEP review is not being actively pursued, i.e.

defered.

(2-6)

DRESDEN 2

~

FACILITY: DRESDEN 2 TOPIC HO.

REVIEW STATUS R EMARKS DIV/BR LICENSEE: COMMONWEALTH EDISON II-t A.

DE/SAB 7

NkC to Ceco 10/06/81 REGION / LOCATION: 9 MILES EAST OF MORRIS, ILL.

II-t B.

DE/SAB 7

HRC 10/06/81 DOCKET NO.* 05000237 II-1 C.

DE/SAB 7

N T CE 08/20/82 POWER CAPACITY: 2527(THERMAL) 0794(ELECTRICAL)

Il-2 A.

DSI/AE 7

R to Ceco 04/24/81 OL NUMBER: DPR-19 II-2 B.

HRC to Ceco 05/07/81 II-5 A 7

HRC to CPCo 08/26/81 A/E FIRM: S&L.

4

(

II-X NRC to Ceco 05/07/81 DE/HGEB 7

NRC 10 CECO 09/16/82 SYSTEMATIC EVALUATION PROGRAM BRANCH CHIEF: W.

USSELL OPERATING REACTORS BRANCH CHIEF: D. CR ClihI D II-3 B.

E/HGEB 7

HRC TO CECO 09/16/82 OPERATING REACTORS PROJECT **AN GE :

T I Q.

1.

D /HGEB 7

HRC TO CECO 09/16/82 INTEGRATED ASSESSMENT OJ T 1 AGE G. CWALINA

. D I-DE/HG HRC TO CECO 09/16/82 KEY R ITA CODES II-4 G

7 HRC to Ceco 07/09/81 k

U" g

G-NER 4a-DRAFTI SEREb1 D

q A[

E/GSB 7

HRC.to CECO 06/08/81 FROM VI W BRANCH k

B.

DE/GSB 7

NRC to CECO 07/09/81 X

DELETED 4b-SAR RECEIVED FR0 0 - TOPIC NOT LICENSEE II-4 C.

DE/GSB 7

HRC to CECO 06/08/81 STARTED 5 - DRAFT S NT II-4 D.

DE/HGEB 7

HRC TO CECO 06/30/82 1 - QUESTIONS RECEIVED r

FROM REVIEW BRANCH II-4 E.

DE/HGEB 7

HRC TO CECO 09/03/82 j

ONSE RECEIVED 2 - QUESTIONS SENT NRC II-4 F.

DE/HGEB 7

NRC TO CECO 06/30/82 TO UTILITY 7 - TOPIC COMPLETE III-1 DL/SEPB 7(SYS)

HRC TO CECO 09/02/82 3 - QUESTION RESPONSE DL/SEPB 7(Elec) Part of VII-3 07/07/81 RECEIVED BY NRC III-2 DL/SEPB 7

NRC TO CECO 09/21/82 (2-7)

DRESDEN 2 TOPIC HO.

REVIEW STATUS REMARKS TOPIC NO.

REVIEW STATUS REMARKS DIV/BR DIV/BR III-3 A.

DE/SEB 7

NRC TO CECO 06/04/82 III-10 B.

X NRC to CECO 11/16/19 III-3 B.

X NRC to CECO 11/16/79 III-10 C.

DL/SEPB 7

NRC to CECO 05/22/79 III-3 C.

DE/HGEB 7

HRC i0 CECO 06/30/82 III-11 X

NRC to CECO 05/07/81 j

III-4 A.

DSI/ASB 7

NRC TO CECO 06/28/62 III-12 X

NRC to Ceco 05/07/81 III-4 B.

DE/MTEB 7

HRC TO CECO 09/16/82 IV-1 A.

DL/SEPB 7

NRC to Ceco 10/26/u1 III-4 C.

DSI/ASB 7

HRC TO CECO 06/28/82 IV-2 DSI/ICSB 7

CECO to NRC 12/04/81 III-4 D.

DE/SAB 7

HRC to Ceco 02/22/82 IV-3 DE/MTEB 7

NRC to Ceco 01/22/82 III-5 B.

DL/SEPB 7

NRC TO CECO 09/21/82 V-1 X

HRC to CECO 11/27/81 III-5 B.

DL/SEPB 7

HRC TO CECO 08/20/82 V-2 X

NRC to Ceco 11/16/79 III-6 DL/SEPB 7

HRC TO CECO 06/30/82 V-3 X

NRC to Ceco 11/16/79 III-7 A.

X NRC to CECO 11/16/79 V-4 DE/MTEB 7

NRC TO CECO 06/29/82 III-7 B.

DL/SEPB 7

NRC TO CECO 09/21/82 V-5 DL/SEPB 7

HRC TO CECO 06/23/82 III-7 C.

X NRC to Ceco 11/16/79 V-6 DL /SEPB 7

NRC TO CECO 09/03/82 III-7 D.

DE/SEB 7

NRC TO CECO 04/11/82 V-7 X

NRC to CECO 11/16/79 III-8 A.

DSI 7

NRC to CECO 02/26/82 V-8 X

NRC to Ceco 11/16/79 III-8 B.

X NRC to CECO 09/11/80 V-9 X

HRC to Ceco 11/16/79 III-8 C.

DL/SEPB 7

HRC TO CECO 06/29/82 V-10 A.

DL/SEPB 7

HRC to CECO 11/08/79 III-8 D.

X NRC to CECO 05/07/81 V-10 B.

DL/SEPB 7

HRC to Ceco 04/24/81 III-9 X

NRC to CECO 05/07/81 V-11 A.

DL/SEPB 7

NRC to CECO 07/10/81 III-10 A.

DL/SEPB 7

NRC to Ceco 06/26/81 V-11 B.

DL/SEPB 7(Sys)

HRC to CECO 04/24/81 DL/SEPB 7(Elec) NRC to Ceco 07/10/81 1

(2-8)

DRESDEN 2 TOPIC NO.

REVIEW STATUS REMARKS TOPIC NO.

R'EVIEW STATUS REMARKS DIV/BR DIV/BR V-12 A.

DL/SEPB 7

NRC to Ceco 04/16/81 VI-7 D.

DL/SEPB 7

NRC to Ceco 10/18/78 V-13 X

NRC to Ceco 05/07/81 VI-7 E.

X NRC to CECO 05/07/81 VI-1 DE/CEB 7

NRC TO CECO 06/30/B2 VI-7 F.

X HRC to Ceco 11/16/79 EI-2 A.

X HRC to Ceco 05/07/81 VI-8 X

NRC to Ceco 05/07/81 VI-2 B.

X NRC to Ceco 05/07/81 VI-9 X

NRC to CECO 11/16/79 VI-2 C.

X HRC to CECO 11/16/79 VI-10 A.

DL/SEPB 7

NRC to Ceco 09/02/82 08/.9/82 VI-10 B.

DL/SEPB 7(Sys)

CECO TO NRC 11/03/81 S

VI-2 D.

DSI/CSB 7

NRC TO CECO DL/SEPB 7(Elec) NRC TO CECO 09/24/82 VI-3 DSI/CSB 7

NRC TO CECO 08/19/82 VII-1 A.

DL/SEPB 7

NRC to CECO 08/05/81 VI-4 DSI/CSB 7(SYS)

NRC TO CECO 09/24/82 DL/SEPB 7(ELEC) NRC TO CECO 06/23/82 VII-1 B.

DL/SEPB 7

NRC to Ceco 10/18/78 VI-5 X

NRC to CECO 05/07/81 VII-2 DL/SEPB 7

CECO to NRC 11/03/81 VI-6 DSI/CSB 7

NRC TO CECO 06/25/82 VII-3 DL/SEPB 7(Sys)

NRC to Ceco 04/24/81 DL/SEPB 7(Elec) HRC to CECO 07/07/81 VI-7 A.

1 X

NRC to Ceco 11/16/79 VII-4 X

HRC to CECO 05/07/81 VI-7 A.

2.

X NRC to Ceco 11/16/79 VII-5 X

NRC to Ceco 05/07/81 VI-7 A. 3.

DL/SEPB 7

CECO to NRC 11/03/81 VII-6 DL/SEPB 7

NRC to CECO 08/26/81 VI-7 A. 4.

DSI/RSB 7

HRC to CECO 04/23/82 VII-7 X

HRC to CECO 11/16/79 VI-7 B.

X NRC to CECO 11/16/79 VIII-1 A.

DSI/PSB 7

HRC TO CECO 06/15/82 VI-7 C.

DL/SEPB 7

NRC to Ceco 03/13/81 VIII-2 DL/SEPB 7

HRC to Ceco 06/26/81 VI-7 C.

1 DSI/PSB 7

NRC TO CECO 02/05/82 VIII-3 A.

DL/SEPB 7

NRC to CECO 07/07/81 VI-7 C. 2.

DL/SEPB 7

NRC to Ceco 03/13/81 VIII-3 B.

DL/SEPB 7

NRC to CECO 06/26/81 VI-7 C. 3.

X NRC to CECO 11/16/79 VIII-4 DL/SEPB 7

NRC to Ceco 11/30/81 i

l (2-9)

DRESDEN 2 TOPIC NO.

REVIEW STATUS REMARKS TOPIC NO.

REVIEW STATUS REMARKS DIV/BR DIV/BR IX-1 DSI/ASB 7

NRC TO CECO 05/05/82 XV-10 X

NRC to Ceco 18/16/79 IX-2 X

NRC to CECO 05/07/81 XV-11 DSI/CPB 7

NRC to Ceco 02/08/82 IX-3 DL/SEPB 7

CECO to NRC 11/03/81 XV-12 X

NRC to Ceco 11/16/79 IX-4 X

NRC to Ceco 11/16/79 XV-13 DSI/CPB 7(Sys)

HRC to Ceco 02/08/82 DSI/AEB 7(Doses) HRC to Ceco 12/28/81 IX -5 DL/SEPB 7

NRC TO CECO 09/02/82 XV-14 DSI/RSB 7

NRC to Ceco 12/15/81 IX-6 DE/CEB 7

HRC TO CECO 06/23/82 XV-15 DSI/RSB 7

NRC to Ceco 01/04/82 X

X NRC to Ceco 11/16/79 XV-16 DSI/AEB 7

CECO to NRC 10/20/81 XI-1 X

NRC to Ceco 12/94/81 XV-17 X

NRC to Ceco 11/16/79 XI-2 X

NRC to CECO 12/04/81 XV-18 DSI/AEB 7

NRC TO CEC 3 09/02/82 l XIII-1 X

HRC to Ceco 05/07/81 XIII-2 DL/SSPB 7

NRC to Ceco 04/14/82 XV-19 DSI/RSB 7(Sys)

HRC to Ceco 12/07/81 DSI/AEB 7(U0SES) CECO to NRC 01/05/82 XV-1 DSI/R$B 7

NRC to Ceco 12/29/81 XV-20 DSI/AEB 7

NRC to CECO 11/20/81 XV-2 X

HRC to CECO 11/16/79 XV-21 X

HRC to CECO 05/07/81 XV-3 DSI/RSB 7

HRC to Ceco 12/07/81 XV-4 DSI/RSB 7

HRC to Ceco 12/07/81 XV-23 X

NRC to Ceco 11/16/79 XV-5 DSI/RSB 7

NRC to Ceco 12/15/81 XV-24 X

NRC to Ceco 05/07/81 XV-6 X

NRC to Ceco 11/16/79 XVI X

NRC to Ceco 11/05/80 XV-7 DSI/RSB 7

NRC to CECO 01/04/82 XVII DL 7

NRC to Ceco 11/20/79 XV-8 RSI/CPB 7

NRC to Ceco 02/08/82 XV-9 DSI/RSB 7

NRC to Ceco 12/15/81 (2-10)

GINNA FACILITY: CINHA TOPIC NO.

REVIEW STATUS REMARKS DIV/BR LICENSEE: ROCHESTER GAS 1 ELECTRIC 11-1 A.

DE/SAB 7

NRC to RGE 07/17/81 REGION / LOCATION: 15 MILES NORTH EAST OF ROCHESTER, NY.

II-1 B.

DE/SA5 7

NRC t 07/21/81 DOCKET NO.: 05000244 II-1 C.

DE/SAB 7

N C GE 09/29/81 POWER CAPACITY: 1520(THERMAL) 0490(ELECTRICAL)

II-2 A.

DSI/AE R

RE 11/03/81 OL NUMBER: DPR-18 II-2 B.

X NRC to RGE 05/07/81 N.S.S.S.: WEST.

I-D /

7 NRC to RGE 09/24/81 A/E FIRM: GIL.

-2 D.

X NRC to RGE 05/07/81 g

SYSTEMATIC EVALUATION PROGRAM BRANCH CHIEF: W. RU L

h A.

DE/HGEB 7

NRC TO RGE 05/27/82 3-OPERATING REACTORS BRANCH CHIEF: D. CRUT L

~

II-3 B.

HGEB 7

NRC TO RGE 05/27/82 OPERATING REACTORS PROJECT MANAGER:

G. D K I

1

/ GEB 7

NRC TO RGE 05/27/82 INTEGRATED ASSESSMEN E

NAC PERSINKO II C

DE/HGEB 7

NRC TO RGE 05/27/82 DE/

7 NRC to RGE 07/09/81

,)

l II-4 A.

3B 7

NRC to RGE 06/08/81 G

G.

E 4a-DRAFT SE CEI

%~

4

/GSB 7

NRC to RGE 07/09/81 FROM REVIE ANCH X-TED DE/GSB 7

NRC to RGE 06/08/81 4b-SAR RECEIVED FROM O - TOPIC NOT LICENSEE II-4 D.

DE/AGEB 7

NRC to RGE 02/19/82 STARTED 5 - DRA II-4 E.

X NRC to RGE 11/16/79 1 - QUESTIONS RECEIVED TO FROM REVIEW BRANCH II-4 F.

DE/HGEB 7

NRC t0 RGE 02/19/82 6-!

E RECEIVED 2 - QUESTIONS SENT B

C' III-t DL/SEPB 7(Sys)

NRC to RGE 12/17/81 TO UTILITY DL/SEPB 7(Elec) NRC to RGE 04/02/81 7 - TOPIC COMPLETE 3 - QUESTION RESPONSE III-2 DL/SEPB 7

NRC TO RGE 04/21/82 RECEIVED BY NRC M - DATA FOR NEXT MONTH (NOVEMBER)

(2-11)

GINNA TOPIC HO.

REVIEW STATUS R EMARKS TOPIC HO.

REVIEW STATUS REMARKS DIV/BR DIV/BR III-3 A.

DE/SEB 7

NRC TO RGE 03/03/82 III-10 8.

DL/SEPB 7

NRC to RGE 0l#22/81 III-3 B.

X NRC to RGE 12/31/80 III-10 C.

X HRC to RGE 11/16/79 III-3 C.

DE/HGEB 7

NRC TO RGE 05/27/82 III-11 X

NRC to RGE 05/07/81 III-4 A.

DSI/AEB 7

HRC TO RGE 04/16/82 III-12 X

HRC to RGE 05/07/81 III-4 B.

DE/MTEB 7

HRC to RGE 02/19/82 IV-1 A.

DL/SEPB 7

HRC to RGE 05/29/79 III-4 C.

DSI/ASB 7

NRC to RGE 02/17/82 IV-2 DSI/ICSB 7

HRC to RGE 05/26/81 III-4 D.

DE/SAB 7

HRC to RGE 07/21/81 IV-3 X

HRC to RGE 05/07/81 III-5 A.

DL/SEPB 7

HRC to RGE 02/22/82 V-1 X

NRC to RGE 11/27/81 III-5 B.

DL/SEPB 7

NRC to RGE 09/04/81 V-2 X

NRC to RGE 11/16/79 III-6 DL/SEPB 7

NRC to RGE 02/17/82 V-3 X

NRC to RGE 05/07/81 III-7 A.

DL/SEPB 7

NRC TO RGE 04/16/82 V-4 X

NRC to RGE 05/07/81 III-7 B.

DL/SEPB 7

HRC TO RGE 04/21/82 V-5 DL/SEPB 7

HRC to KGE 02/08/82 III-7 C.

DE/SEB 7

RGE to NRC 07/07/81 V-6 DL/SEPB 7

HRC to RGE 03/05/80 III-7 D.

DE/SEB 7

HRC to RGE 05/08/80 V-7 DSI/ASB 7

HRC to RGE 02/17/82 III-8 A.

DSI 7

NRC to RGE O2/17/82 V-8 X

HRC to RGE 05/07/81 III-8 B.

X NRC to RGE 02 12 51 V-9 X

HRC to RGE 11/16/79 III-8 C.

DL/SEPB 7

RGE to NRC 12/07/79 V-10 A.

DL/SEPB 7

NRC to RGE 02/02/79 III-8 D.

X HRC to RGE 05/07/81 V-10 B.

DL/SEPB 7

RGE to HRC 09/29/81 III-9 X

HRC to RGE 05/07/81 V-11 A.

DL/SEPB 7

HRC to RGE 11/07/81 III-10 A.

DL/SEPB 7

HRC to RGE 08/03/81 V-11 B.

DL/SEPB 7(Sys)

RGE to NRC 09/29/81 DL/SEPB 7(Elec) HRC to RGE 04/24/81 (2-12)

GINNA

~

TOPIC NO.

REVIEW STATUS REMARKS TOPIC HO.

REVIEW STATUS REMARKS DIV/BR DIV/BR V-12 A.

X NRC to RGE 11/16/79 VI-7 D.

DL/SEPB 7

NRC to RGE 08/17/78 V-13 X

NRC to RGE 05/07/81 VI-7 E.

X NRC to RGE 05/07/81 VI-1 DE/CEB 7

NRC to RGE 02/19/82 VI-7 F.

DL/SEPB 7

NRC to Dr.E 06/24/81 VI-2 A.

X NRC to RGE 05/07/81 VI-8 X

NRC to RGE 05/07/81 VI-2 B.

X HRC to RGE 05/07/81 VI-9 X

NRC to RGE 11/16/79 VI-2 C.

X NRC to RGE 11/16/79 VI-10 A.

DL/SEPB 7

NRC to RGE 11/27/81 VI-2 D.

DSI/CSB 7

HRC TO RGE 04/12/82 VI-10 B.

X NRC to RGE 11/16/79 VI-3 DSI/CSB 7

HRC TO RGE 04/12/82 VII-1 A.

DL/SEPB 7

NRC to RGE 07/30/81 VI-4 DSI/CSB 7(SYS)

HRC TO RGE 04/12/82 VII-1 B.

DL/SEPB 7

NRC to RGE 08/17/78 DL/SEPB 7(ELEC) HRC TO RGE 03/19/82 VII-2 DL/SEPB 7

NRC to RGE 12/28/81 VI-5 X

HRC to RGE 05/07/81 VII-3 DL/SEPB 7(Sys)

HRC to RGE 09/29/81 VI-6 DSI/CSB 7

NRC to RGE 05/06/81 DL/SEPB 7(Elec) HRC to RGE 03/25/82 VI-7 A.

1 DL/SEPB 7

HRC to RGE 02/20/81 VII-4 X

HRC to RGE 05/07/81 VI-7 A. 2.

DL/SEPB 7

NRC to RGE 08/17/78 VII-5 X

NRC to RGE 05/07/81 VI-7 A. 3.

DL/SEPB 7

NRC to RGE 11/27/81 VII-6 DL/SEPB 7

HRC to RGE 06/24/81 VI-7 A. 4.

X NRC to RGE C5/07/81 VII-7 X

NRC to RGE 11/16/79 VI-7 B.

DSI/RSB 7(SYS)

HRC TO RGE 03/09/82 VIII-1 A.

DSI/PSB 7

HRC to RGE 03/26/81 DL/SEB 7(Elec) HRC to RGE 09/18/81 VIII-2 DL/SEPB 7

NRC to RGE 06/24/81 VI-7 C.

DL/SEPB 7

NRC to RGE 02/20/81 VIII-3 A.

DL/SEPB 7

NRC to RGE 07/31/81 VI-7 C.

1.

DL/SEPB 7

HRC to RGE 11/27/81 VIII-3 B.

DL/SEPB 7

NRC to RGE 06/09/81 VI-7 C. 2.

DL/SEPB 7

NRC to RGE 02/20/81 VIII-4 DL/SEPB 7

RGE to NRC 10/08/81 VI-7 C. 3.

X HRC to RGE 11/16/79 (2-13)

GINNA TOPIC NO.

REVIEW STATUS REMARKS TOPIC HO.

REVIEW STATUS REMARKS DIV/BR DIV/BR IX-1 DSI/ASB 7

NRC to RGE 11/24/88 XV-10 DSI/RSB 7

NRC to RGE 09/04/81 IX-2 X

HRC to RGE 05/07/81 XV-11 X

NRC to RGE 10/01/80 IX-3 DL/SEPB 7

NRC to RGE 11/03/81 XV-12 DSI/CPB 7(Sys)

HRC to RGE 09/04/81 DSI/AEB 7(DOSES) HRC TO RGE 03/03/82 IX-i DSI/RSB 7

HRC to RGE 08/26/81 XV-13 X

HRC to RGE 11/16/79 IX-5 DL/SEPB 7

RGE to NRC 03/29/82 XV-14 DSI/RSB 7

HRC to RGE 09/04/81 IX-6 7

NRC TO RGE 05/07/82 XV-15 DSI/RSB 7

HRC to RGE 09/04/81 X

X HRC to RGE 05/07/81 XV-16 DSI/AEB 7

HRC TO RGE 03/03/82 XI-1 X

HRC to RGE 12/04/81 XV-17 DSI/RSB 7(Sys)

HRC to RGE 09/04/81 XI-2 X

NRC to RGE 12/04/81 DSI/AEB 7(DOSES) HRC TO RGE 03/03/82 XIII-1 X

NRC to RGE 05/07/81 XV-18 X

NRC to RGE 03/11/80 XIII-2 DL/SEPB 7

NRC to RGE 03/26/81 XV-19 DSI/RSB 7(Sys)

NRC to RGE 10/02/81 DSI/AEB 7(DOSES) RGE TO HRC 03/09/82 XV-1 DSI/RSB 7

HRC to RGE 09/04/81 XV-20 DSI/AEB 7

h'RC TO RGE 03/03/82 XV-2 DSI/RSB 7(Sys)

HRC to RGE 09/04/81 DSI/AEB 7(DOSES) NRC TO RGE 03/03/82 XV-21 X

NRC to RGE 05/07/81 XV-3 DSI/RSB 7

HRC to RGE 09/04/81 XV-22 X

HRC to RGE 05/07/81 XV-4 DSI/RSB 7

NRC to RGE 09/04/81 XV-23 X

HRC to RGE 05/07/81 XV-5 DSI/RSB 7

HRC to RGE 09/04/81 XV-24 X

HRC to RGE 05/07/81 XV-6 DSI/RSB 7

HRC to RGE 09/34/81 XVI X

HRC to RGE 11/05/80 XV-7 DSI/RSB 7

NRC to RGE 09/04/81 XVII DL 7

NRC to RGE 08/17/78 XV-8 DSI/CPB 7

NRC to RGE 09/04/81 XV-9 DSI/RSB 7

RGE to NRC 10/16/81 (2-14)

l HADDAM NECK FACILITY: HADDAM NECK TOPIC HO.

REVIEW STATUS REMARKS DIV/BR LICENSEE: COHHECTICUT YANKEE ATOMIC POWER Il-1 A.

DE/SAB 7

Nic TO CYAP 04/22/82 REGIDH/ LOCATION: 13 MILES EAST OF MERIDEN, CT.

II-1 B.

DE/SAB 7

NR TO P0 04/22/82 DOCKET HO 05000213 II-1 C.

DE/SAB 7

C 0 AP 06/28/82 POWER CAPACITY: 1825(THERMAL) 0575(ELECTRICAL)

\\

II-2 A.

DSI/AE CY N to HRC 01/22/81 OL HUMBER: DPR-61 II-2 B.

X NRC to CYAPCo 05/07/81 N.S.S.S.: WEST.

C.

/ B 7

HRC TO CYAPCO 04/26/82 A/E FIRM: S8W X

HRC to CYAPCo 05/07/81 A.

DE/HGEB 7

HRC TO CYAPCD 12/20/82 SYSTEMATIC EVALUATION PROGRAM BRANCH CHIEF: W. RU g,

OPERATING REACTORS BRANCH CHIEF:

D. CRU l

II-3 B.

D /HGEB 7

HRC TO CYAPCO 12/20/82 OPERATING REACTORS PROJECT MAN ER:

'R CKS I 3 B.

1.

E/ EB 7

HRC TO CYAPCO 12/20/82 INTEGRATED ASSESSM P%C AG OWN g

II-DE/HGEB 7

HRC TO CYAPCO 12/20/82 yg

},,)

-U C ES S

l

[

II-G 7

HRC to CYAPCo 06/17/81 G-ENER 4a-DRAFT SE R ED DE/GSB 7

HRC TO CYAPCO 06/04/82 L

FROM REVIE HCH X-LTT ED 4 C.

DE/GSB 7

HRC to CYAPCo 06/17/81 0 - TOPIC HOT LICENSEE d

4b-SAR RECEIVED FROM II-4 D.

DE/HGEB 7

NRC TO CYAPCO 07/13/82 STARTED 5-D II-4 E.

X HRC to CYAPCo 04/16/79 1 - QUESTIONS RECEIVED T

FROM REVIEW BRANCH II-4 F.

DE/HGEB 7

HRC TO CYAPCO 07/06/82 6-S R

HSE RECEIVED 2 - QUESTIONS SENT BY RC III-1 DL/SEPB 7(SYS)

HRC TO CYAPCO 08/12/82 TO UTILITY DL/SEPB 7(Elec) Part of VII-3 7 - TOPIC COMPLETE 3 - QUESTION RESPONSE III-2 DL/SEPB 7

NRC TO CYAPCO 09/02/82 RECEIVED BY HRC (2-15)

HADDAM NECK TOPIC NO.

REVIEW STATtlS REMARKS TOPIC NO.

REVIEW STATUS REMARKS DIV/BR DIV/BR III'-3 A.

DE/SEB 7

HRC 10 CYAPCO 08/26/82 III-10 B.

DL/SEPB 7

CYAPCO TO NRC 05/25/82 III-3 B.

DE/HGEB 7

HRC TO CYAPCO 12/20/82 III-10 C.

X NRC to CYAPCo 04/96/79 III-3 C.

DE/HGEB 7

NRC TO CYAPCO 06/28/82 III-11 X

HRC to CYAPCo 05/07/81 III-4 A.

DSI/ASB 7

NRC TO CYAPCO 08/02/82 III-12 X

HRC to CYAPCo 05/07/81 III-4 B.

DE/MTEB 7

HRC TO CYAPCO 07/13/82 IV-1 A.

DL/SEPB 7

CYAPCo to NRC 06/25/79 III-4 C.

DSI/ASB 7

HRC TO CYAPCO 05/10/82 IV-2 DSI/ICSB 7

HRC to CYAPCo 02/22/82 III-4 D.

DE/SAB 7

HRC TO CYAPCO 04/22/82 IV-3 X

NRC to CYAPCo 05/07/81 III-5 A.

DL/SEPB 7

HRC TO CYAPCO 10/12/82 V-1 X

HRC to CYAPCo 11/27/81 III-5 B.

DL/SEPB 7

HRC TO CYAPC0 05/10/82 V-2 X

HRC to CYAPCo 04/16/79 III-6 DL/SEPB 7

HRC TO CYAPCO 02/25/82 V-3 X

NRC to CYAPCo 05/07/81 III-7 A.

X NRC TO CYAPCO 05/07/81 V-4 X

NRC to CYAPCo 05/07/81 III-7 B.

DL/SEPB 7

NRC TO CYAPCO 02/23/83 V-5 DL/SEPB 7

NRC to CYAPCo 02/22/82 i III-7 C.

X HRC to CYAPCo 04/16/79 V-6 DL/SEPB 7

NRC to CYAPCo 03/05/80 III-7 D.

DE/SEB 7

NRC to CYAPCo 10/16/81 V-7 DSI/ASB 7

NRC TO CYAPCO 06/21/82 III-8 A.

DSI 7

NRC TO CYAPCO 06/21/82 V-8 X

HRC to CYAPCo 05/07/81 III-8 B.

X NRC to CYAPCo 10/01/80 V-9 X

NRC to CYAPCo 11/16/79 III-8 C.

DL/SEPB 7

HRC to CYAPCo 01/29/82 V-10 A.

DL/SEPB 7

NRC to CYAPCo 01/13/81 III-8 D.

X HRC to CYAPCo 05/07/81 V-10 B.

DL/SEPB 7

NRC to CYAPCo 12/28/81 III-9 X

NRC to CYAPCo 05/07/81 V-11 A.

DL/SEPS 7

NRC to CYAPCo 11/03/81 I:I-10 A.

DL/SEPB 7

CYAPCo to NRC 09/21/81 V-11 B.

DL/SEPB 7(Sys)

HRC to CYAPCo 12/28/81 DL/SEPB 7(Elec) HRC TO CYAPCO 03/03/82 (2-16)

TOPIC HO.

RE*IEW STATUS REMARKS TOPIC HO.

REVIEW STATUS REMARKS DIV/BR DI//BR V-12 A.

X NRC to CYAPCo 11/16/79 VI-7 D.

DL/SEPB 7

NRC to CYAPCo 08/17/78 V-13 X

NRC to CYAPCo 05/07/81 VI-7 E.

X HRC to CYAPCo 05/07/81 VI-1 DE/CEB 7

HRC TO CYAPCO 07/15/82 VI-7 F.

X HRC to CYAPCo 04/16/79 VI-2 A.

X HRC to CYAPCo 05/07/81 VI-8 X

HRC to CYAPCo 05/07/81 VI-2 B.

X NRC to CYAPCo 05/07/81 VI-9 X

HRC to CYAPCo 11/16/79 VI-2 C.

X NRC to CYAPCo 04/16/79 VI-10 A.

DL/SEPB 7

HRC TO CYAPCO 12/03/82 VI-2 D.

DSI/CSB 7

HRC TO CYAPCO 09/16/82 VI-10 B.

X HRC to CYAPCo 04/16/79 VI-3 DSI/CSB 7

HRC TO CYAPCO 09/16/82 VII-1 A.

DL/SEPB 7

HRC TO CYAPCO 10/20/82 VI-4 DSI/CSB 7(SYS)

HR0 TO CYAPCO 12/18/82 VII-1 B.

DL/SEPB 7

HRC to CYAPCo 08/17/78 DL/SEPB 7(Elec) HRC to CYAPCo 09/21/81 VII-2 DL/SEPB 7

NRC TO CYAPC0 03/05/82 VI-5 X

HRC to CYAPCo 05/07/81 VII-3 DL/SEPB 7(Sys)

NRC to CYAPCo 12/28/81 VI-6 DSI/CSB 7

HRC TO CYAPCO 05/07/82 DL/SEPB 7(Elec) HRC to CYAPCo 08/28/81 l

VI-7 A.

1.

DL/SEPB 7

HRC to CYAPCo 02/20/81 VII-4 X

HRC to CYAPCo 05/07/81 l

VI-7 A. 2.

X NRC to CYAPCo 05/07/81 VII-5 X

HRC to CYAPCo 05/07/81 VI-7 A.

3.

DL/SEPB 7

HRC TO CYAPCO 10/27/82 VII-6 DL/SEPB 7.

t:RC to CYAPCo 08/28/81 VI-7 A.

4.

X HRC to CYAPCo 05/07/81 VII-7 X

NRC to CYAPCo 04/16/79 VI-7 B.

DSI/RSB 7(SYS)

NRC TO CYAPCO 08/12/82 VIII-1 A.

PSI /PSB 7

NRC TO CYAPCO 07/22/82 DL/SEPB 7(Elec) HRC to CYAPCo 05/21/81 VIII-2 DL/SEPB 7

HRC to CYAPCo 08/28/81 VI-7 C.

DL/SEPB 7

HRC to CYAPCo 03/13/81 VIII-3 A.

DL/SEPB 7

CYAPCo to HRC 01/16/79 VI-7 C.

1 DL/SEPB 7

CYPACO to NRC 01/11/82 VIII-3 B.

DL/SEPB 7

NRC to CYAPCo 08/28/81 VI-7 C.

2.

DL/SEPB 7

HRC to CYAPCo 03/13/81 VIII-4 DL/SEPB 7

HRC TO CYAtC0 05/17/82 VI-7 C.

3.

DL/SEPB 7

CYAPCo to HRC 02/12/82 (2-17)

HADDAM NECK TOPIC NO.

REVIEW STATUS REMARKS TOPIC NO.

REVIEW STATUS REMARKS DIV/BR DIV/BR IX-1 DSI/ASB 7

HRC TO CYAPC0 03/01/82 XV-10 DSI/RSB 7

NRC TO CYAPC0 04/12/82 IX-2 X

HRC to CYAPCo 05/07/81 XV-11 X

HRC to CYAPCo 10/01/80 IX-3 DL/SEPB 7

HRC TO CYAPCO 06/07/82 XV-12 DSI/CPB 7(SYS)

HRC TO CYAPCO 03/23/82 DSI/RSB 7(DOSES) HRC TO CYAPCO 06/29/82 IX-4 DSI/RSB 7

NRC TO CYAPCO 04/26/82 XV-13 X

HRC to CYAPCo 11/16/79 IX-5 DL/SEPB 7

NRC TO CYAPCO 08/27/82 XV-14 DSI/RSB 7

HRC TO CYAPCO 04/26/82 IX-6 DE 7

HRC TO CYAPCO 06/22/82 XV-15 DSI/RSB 7

NRC TO CYAPCO 04/16/82 l

X X

HRC to CYAPCo 05/07/81 l

XV-16 DSI/AEB 7

CYAPCo to NRC 09/28/81 1

XI-1 X

NRC to CYAPCo 12/04/81 XV-17 DSI/RSB 7(SYS)

HRC TO CYAPCO 08/19/82 XI-2 X

HRC to CYAPCo 12/04/81 DSI/AEB 7(DOSES) HRC TO CYAPCO 08/19/82 XIII-1 X

NRC to CYAPCo 05/07/81 XV-18 X

HRC to CYAPCo 10/01/80 XIII-2 DL/SSPB 7

HRC TO CYAPCO 06/10/82 XV-19 DSI/RSB 7(Sys)

HRC to CYAPCo 12/02/81 DSI/AEB 7(DOSES) HRC TO CYAPCO 08/27/82 XV-1 DSI/RSB 7

NRC TO CYAPCO 06/18/82 XV-20 DL/SEPB 7

NRC to CYAPCo 06/09/81 XV-2 DSI/RSB 7 (SYS) HRC TO CYAPCO 11/09/82 DSI/AEB 7(DOSES) HRC TO CYAPCO 11/09/82 XV-21 X

H ".. to CYAPCo 05/07/81 XV-3 DSI/RSB 7

HRC TO CYAPCO 03/17/82 6

XV-22 X

HRC to CYAPCo 05/07/81 XV-4 DSI/RSB 7

HRC to CYAPCo 12/17/81 XV-23 X

NRC to CYAPCo 05/07/81 XV-5 DSI/RSB 7

HRC TO CYAPCO 04/16/82 XV-24 X

HRC to CYAPCo 05/07/81

~

XV-6 DSI/RSB 7

HRC TO CYAPCO 05/20/82 XVI X

HRC to CYAPCo 11/05/80 XV-7 DSI/RSB 7

HRC TO CYAPCO 05/25/82 XVII DL 7

HRC to CYAPCo 08/17/78 XV-8 DSI/CPB 7

NRC TO CYAPCO 03/25/f?

XV-9 DSI/RSB 7

HRC TO CYAPCO 04/26/82 (2-18)

LACROSSE FACILITY: LACROSSE TOPIC MO.

REVIEW STATUS REMARKS DIV/BR LICENSEE: DAIRYLAND "CWER 11-1 A.

DE/SAB 7

NRO TO DPC 01/31/83 REGION / LOCATION: 19 MIL ES SOUTH OF L ACROSSE, WISC.

II-1 B.

DE/SAB 7

HC P

09/13/82 DOCKET HO.

05000409 II-1 C.

DE/SAB 7

R DPC 08/30/82 POWER CAPACITY: 0165(THERMAL) 0050(ELECTRICAL)

II-2 A.

DL1/

o DPC 12/15/80 OL HUMBER: DPR-45 II-2 B.

NRC to DPC 05/07/81 N.S.S.S.'

AC.

Io SI A 7

NRC TO DPC 10/ M/82 A/E FIRM: SSL i

I-2 D.

X NRC to DPC 05/07/81

\\

A.

DE/HGEB 7

NRC TO DPC 11/12/82 SYSTEMATIC EVALUATION PROGRAM BRANCH CHIEF: W. R LL E"

II-3 B.

/HGEB 7

NRC TO DPC 11/12/82 OPERATING REACTORS BRANCH CHIEF:

D.

CRU j

OPERATING REACTORS PROJECT MANAGER D

UDL

-3 HGEB 7

NRC TO DPC 11/12/82 fHTEGRATED ASSESSMENT J

ANA T M CHAELS I

DE/HGEB NRC TO DPC 11/12/82 h

L

-4 7

NRC to DPC 07/20/82

\\ l TJ "

E BDR LTATkS DES l

r-4( j II-4 A.

7 HRC to DPC 06/08/81 h

/

G C

4a-DRAFT SE E

'*U

- 4 DE/GSB 7

HRC TO DPC 07/20/82 FROM REVI ANCH X

ETED C.

DE/GSB 7

HRC to DPC 06/08/81 4b-SAR RECEIVED FROM W

0 - TOPIC HOT LICENSEE II-4 D.

DE/HGEB 7

NRC TO DPC 08/27/82 STARTED 5 - DRA SE SE II-4 E.

DE/HGEB 7

HRC TO DPC 08/16/82 1 - QUESTIONS RECEIVED TO L

FROM REVIEW BRANCH

{

II-4 F.

DE/HGEB 7

NRC TO DPC 07/29/82 2 - QUESTIONS SEHT III-1 DL/SEPB 7(Sys)

DPC TO NRC 07/02/82 TO UTILITY DL/SEPB 7(Elec) NRC TO DPC 01/04/83 7 - TOPIC COMPLETE 3 - QUESTION RESP 0 HSE III-2 DL/SEPB 7

HRC TO DPC 01/27/83 RECEIVED BY HRC (2-19)

LACROSSE TOPIC NO.

REVIEW STATUS REMARKS TOPIC HO.

REVIEW STATUS REMARKS DIV/BR DIV/BR III-3 A.

DE/SEB 7

NRC TO OPC 12.< 13/82 III-10 B.

X NRC to DPC 10/29/79 III-3 8.

X NRC to DPC 03/10/81 III-10 C.

X HRC to DPC 10/29/79 III-3 C.

DE/HGEB 7

NRC TO DPC 10/15/82 III-11 X

NRC to DPC 05/07/81 III-* A.

DSI/ASB 7

NRC TO DSC 11/29/82 III-12 X

HRC to DPC 05/07/81 III-4 B.

DE/MTEB 7

NRC TO DPC 31/27/83 IV-1 A.

DL/SEPB 7

NRC to DPC 04/19/79 III-4 C.

DSI/ASB 7

HRC TO QPC 07/19/82 IV-2 DSI/ICSB 7

NRC TO DPC 09/10/82 III-4 D.

DE/SAB 7

NRC TO DPC 08/23/82 IV-3 X

NRC to DPC 05/07/81 III-5 A.

DL/SEPB 7

NRC TO DPC 11/08/82 V-1 X

HRC to DPC 11/27/81 III-5 B.

DL/SF*B 7

HRC TO DPC 08/12/82 V-2 X

HRC to DPC 10/29/79 III-6 DL/SEPB 7

HRC TO DPC 04/05/83 V-3 X

NRC to DPC 05/07/81 III-7 A.

X NRC to DPC 05/07/81 V-4 X

HRC to DPC 05/07/81 III-7 B.

DL/SEPB 7

DPC TO HRC 01/20/83 V-5 DL/SEPB 7

NRC TO DPC 07/19/82 III-7 C.

X HRC to DPC 10/29/79 V-6 DL/SEPB 7

HRC to DPC 03/05/80 III-7 D.

DE/SEB 7

NRC TO DPC 04/13/82 V-7 X

NRC to DPC 05/07/81 III-8 A.

DSI 7

HRC TO DPC 02/22/82 V-8 X

HRC to DPC 05/07/81 III-8 B.

X NRC to DPC 09/26/80 V-9 X

HRC to DPC 10/29/79 III-8 C.

DL/SEPB 7

DPC to NRC 03/03/81 V-10 A.

DL/SEPB 7

HRC to DPC 01/07/80 III-8 D.

X NRC to DPC 05/07/81 V-10 B.

DL/SEPB 7

NRC TO DPC 10/07/82 III-9 X

HRC to DPC 05/07/81 V-11 A.

DL/SEPB 7

NRC to DPC 02/22/82 III-10 A.

DL/SEPB 7

NRC to DPC 09/22/81 V-11 B.

DL/SEPB 7(SYS)

HRC TO DPC 10/07/82 DL/SEPB 7(ELEC) NRC TO DPC 03/04/82 (2-20)

LACROSSE TOPIC NO.

REVIEW STATUS R EI1 ARKS TOPIC NO.

REVIEW STATUS REMARKS DIV/BR DIV/BR V-12 A.

DL/SEPB 7

NRC to DPC 04/30/79 VI-7 D.

DL/SEPE 7

HRC to DPC 08/17/78 V-13 X

NRC to DPC 05/07/81 VI-7 E.

X HRC to DPC 05/07/81 VI-1 DE/CEB 7

HRC TO DPC 10/14/82 VI-7 F.

X HRC to DPC 10/29/79 VI-2 A.

X NRC to DPC 05/07/81 VI-8 X

HRC to DPC 05/07/81 VI-2 B.

X NRC to DPC 05/07/81 VI-9 X

HRC to DPC 10/29/79 VI-2 C.

X HRC to DPC 10/29/79 VI-10 A.

DL/SEPB 7

NRC TO DPC 09/20/82 VI-2 D.

DSI/CSB 7

HRC TO DPC 08/27/82 VI-10 B.

X HRC to DPC 10/29/79 VI-3 DSI/CSB 7

NRC TO DPC 08/27/82 VII-1 A.

DL/SEPB 7

HRC TO DPC 03/b9/82 VI-4 DSI/CSB 7(SYS)

HRC TO DPC 12/09/82 VII-1 B.

DL/SEPB 7

NRC to DPC 08/17/78 DL/SEPB 7(Elec) HRC to DPC 01/05/82 VII-2 DL/SEPB 7

HRC TO DPC 03/11/82 VI-5 X

NRC to DPC 05/07/81 VII-3 DL/SEPB 7(SYS)

NRC TO DPC 10/07/82 VI-6 DSI/CSB 7

HRC TO DPC 08/24/82 DL/SEPB 7(ELEC) HRC TO DPC 01/04/83 VI-7 A.

1.

X HRC to CPC 10/29/79 VII-4 X

NRC to DPC 05/07/81 VI-7 A.

2.

X HRC to DPC 05/07/81 VII-5 X

NRC to DFC 05/07/81 VI-7 A.

3.

DL/SEPB 7

NRC to DPC 01/05/83 VII-6 DL/SEPB 7

NRC to DPC 09/21/81 VI-7 A.

4.

X NRC to DPC 05/07/81 VII-7 X

HRC to DPC 10/29/79 VI-7 B.

X HRC to DPC 10/29/79 VIII-1 A.

DSI/PSB 7

HRC TO DPC 10/14/82 VI-7 C.

DL/SEPB 7

NRC to DPC 03/13/81 VIII-2 DL/SEPB 7

NRC to DPC 12/18/81 VI-7 C.

1.

DL/SEPB 7

HRC to DPC 09/21/81 VIII-3 A.

DL/SEPB 7

HRC to DPC 06/05/79 VI-7 C.

2.

DL/SEPB 7

NRC to DPC 03/13/81 VIII-3 B.

DL/SEPB 7

HRC to DPC 05/28/81 VI-7 C.

3.

X HRC to DPC 10/29/79 VIII-4 DL/SEPB 7

NRC to DPC 09/09/81 (2-21)

LACROSSE TOPIC NO.

REVIEW STATUS REMARKS TOPIC HO.

REVIEW STATUS REMARKS DIV/BR DIV/BR IX-1 DSI/ASB 7

NRC TO DPC 10/26/82 XV-10 X

NRC to DPC 10/29/79 IX-2 X

NRC to DPC 05/07/81 XV-11 DSI/CPB 7

NRC TO DPC 04/05/82 IX-3 DL/SEPB 7

NRC TO DPC 07/20/82 XV-12 X

NRC to DPC 10/29/79 IX-4 X

NRC to DPC 10/29/79 XV-13 DSI/CPB 7(DOSES) HRC TO DPC 07/20/82 DSI/AEB 7(SYS)

HRC TO DPC 04/05/82 IX-5 DL/SEPB 7

NRC TO DPC 10/28/82 XV-14 DSI/RSB 7

NRC TO DPC 08/06/82 IX-6 DSI/ASB 4A 10/14/82 XV-15 DSI/RSB 7

NRC to DPC 09/21/81 X

X NRC to DPC 05/07/81 XV-16 OSI/AEB 7

NRC TO DPC 10/14/82 XI-1 X

NRC to DPC 12/04/81 XV-17 X

NRC to DPC 10/29/79 XI-2 X

NRC to DPC 12/04/81 XV-18 DSI/AEB 7

NRC TO DPC 08/06/82 XIII-1 X

NRC to DPC 05/07/81 XV-19 DSI/AEB 7(DOSLS) HRC TO DPC 10/14/82 XIII-2 DL/SSPB 7

HRC to DPC 12/14/82 DSI/RSB 7(SYS)

HRC TO DPC 10/29/82 XV-1 DSI/RSB 7

NRC TO DPC 09/29/82 XV-20 DSI/AEB 7

NRC TO DPC 10/14/82 XV-2 X

NRC to DPC 10/29/79 XV-21 X

NRC to DPC 05/07/81 XV-3 DSI/RSB 7

NRC to DPC 11/13/81 XV-22 X

NRC to DPC 05/07/81 XV-4 DSI/RSB 7

NRC to DPC 11/03/81 XV-23 X

NRC to DPC 05/07/81 XV-5 DSI/RSB 7

NRC TO DPC 08/24/82 XV-24 X

HRC to DPC 05/07/81 XV-6 X

HRC to DPC 10/29/79 XVI X

HRC to DPC 11/05/80 XV-7 DSI/RSB 7

NRC TO DPC 08/06/82 XVII DL 7

NRC to DPC 08/17/78 XV-8 DSI/CPB 7

NRC TO DPC 09/10/82 XV-9 DSI/RSB 7

NRC TO DPC 10/12/82 (2-22)

MILLSTONE 1 FACILITY: MILLSTONE 1 TOPIC HD.

REVIEW STATUS REMARKS DIV/BR LICENSEE NORTHEAST NUCLEAR ENERGY 11-1 A.

DE/SAB 7

HRC to HU 07/31/81 REGION / LOCATION: 5 MILES SOUTH WEST OF HEW LONDOH, CONH.

II-1 B.

DE/SAB 7

HRC to 11/27/81 DOCKET NO.: 05000245 II-1 C.

DE/SAB 7

08/04/82 POWER CAPACITY: 2011(THERMAL) 0660(ELECTRICAL)

II-2 A.

DSI/AEB Ct N 03/30/81 OL NUMBER: DPR-21 II-2 B.

to HU 05/07/81 H.S.S.S.: GE.

II-2 SI/A HRC to NU 12/23/81 A/E FIRM: EBASCO I-X NRC to HU 05/07/81 SYSTEMATIC EVALUATION PROGRAM BRANCH CHIEF: W. RUSSE i

-3 A I

DE/HGEB 7

HRC TO NU 06/30/82 OPERATING REACTORS BRANCH CHIEF: D. CRUTCHF I

II-3 B.

/ GEB 7

HRC TO NU 06/30/82 II-21(.

H EB 7

HRC TO MU 06/30/82 OPERATING REACTORS PROJECT MANAGER:

. H pq INTEGRATEDASSESSMENTPRJgCf}

kGER: D.

S KO II-

/HGEB 7

h HRC TO NU 06/30/82

\\ l

\\ TJ I

DE/G INRC to NU 06/08/81 Ri S T < LIU51bOMS j

g--g l II-4 A.

NRC to NU 06/08/81 G-EH 4a-DRAFTSERh EI B.

C SB 7

NRC TO HU 05/11/82 FROM REVIEW

-m

,[

DE/GSB 7

NRC to H'J 06/08/81 X-D 4b-SAR RECEIVED FROM y

0 - TOPIC HOT LICENSEE

,L II-4 D.

DErHGEB 7

HRC TO HU 06/30/82 STARTED 5 - DRAFT SE SENT II-4 E.

X HRC to NU 11/16/79 1 - QUESTIONS RECEIVED T0rU T

FROM REVIEW BRANCH II-4 F.

DE/HGEB 7

NRC TO HU 06/15/82 2 - QUESTIONS SENT BY R III-1 DL/SEP8 7(Elec) NRC TO HU 09/16/82 TO UTILITY DL/SEPB 7(SYS)

HRC TO HU 09/01/82 7 - TOPIC COMPLETE 3 - QUESTION RESPONSE III-2 DL/SEPB 7

HRC TO HU 09/30/82 RECCI%ED BY NRC (2-23)

MILLSTONE 1 TOPIC HO.

REVIEW STATUS REMARKS TOPIC HO.

REVIEW STATUS REMARKS DIV/BR DIV/BR III-5 A.

DE/SEB 7

HRC TO NU 09/15/82 III-10 B.

X NRC to HU 11/16/79 III-3 B.

X HRC to NU 12/26/80 III-10 C.

DL/SEPB 7

NU to HRC 08/29/79 III-3 C.

DE/HGEB 7

HRC TO NU 06/23/82 III-11 X

NRC to NU 05/07/81 III-4 A.

DSI/ASB 7

HRC TO HU 05/25/82 III-12 X

NRC to HU 05/07/81 III-4 B.

DE/MTEB 7

NRC TO HU 06/29/82 IV-1 A.

DL/SEPB 7

HU to NRC 02/12/79 III-4 C.

DSI/ASB 7

NRC TO NU 06/09/82 IV-2 DSI/ICSB 7

HRC TO HU 06/03/82 III-4 D.

DE/SAB 7

NRC to NU 11/27/81 IV-3 DL 7

NRC to NU 02/22/82 III-5 A.

DL/SEPB 7

NRC TO NU 06/24/82 V-1 X

NRC to NU 11/27/81 III-5 B.

DL/SEPB 7

NRC TO NU 09/09/82 V-2 X

HRC to NU 11/16/79 III-6 DL/SEPB 7

NRC TO HU 06/30/82 V-3 X

NRC to NU 05/07/81 III-7 A.

X HRC to NU 05/07/81 V-4 X

HRC to NU 05/07/81 III-7 B.

DL/SEPB 7

NRC TO HU 08/11/82 V-5 DL/SEPB 7

NRC to NU 08/28/81 III-7 C.

X HRC to NU 11/16/79 V-6 DL/SEPB 7

NRC to NU 09/29/82 1

III-7 D.

DE/SEB 7

NU to NRC 02/17/81 V-7 X

HRC to NU 05/07/81 III-8 A.

DSI 7

HRC TO HU 03/03/82 V-8 X

HRC to NU 05/07/31 III-8 B.

X HRC to NU 09/26/80 V-9 X

NRC to NU 11/16/79 III-8 C.

DL/SEPB 7

NRC TO HU 06/24/82 V-10 A.

DL/SEPB 7

HU to HRC 03/05/79 III-8 D.

X NRC to NU 05/07/81 V-10 B.

DL/SEPB 7

HU to HRC 07/22/81 III-9 X

HRC to NU 05/07/81 V-11 A.

DL/SEPB 7

NRC to NU 07/08/81 III-10 A.

DL/SEPB 7

NRC to NU 04/07/82 V-11 B.

DL/SEPB 7(Sys)

NU to HRC 07/22/81 DL/SEPB 7(ELEC) HRC TO HU 09/16/82 l

(2-24) l l

MILLSTONE 1 TOPIC HO.

REVIEW STATUS REMARKS TOPIC HO.

REVIEW STATUS REMARKS DIV/BR DIV/BR V-12 A.

DL/SEPB 7

NRC to NU 12/17/79 VI-7 D.

DL/SEPB 7

NRC to NU 08/17/78 V-13 X

HRC to NU 05/07/81 VI-7 E.

X HRC to NU 05/07/81 VI-l DE/CEB 7

HRC to NU 02/26/82 VI-7 F.

X NRC to NU 11/16/79 VI-2 A.

X NRC to NU 05/07/81 VI-8 X

NRC to NU 05/07/81 VI-2 B.

X HRC to NU 05/07/81 VI-9 X

HRC to NU 11/16/79 VI-2 C.

X HRC to NU 11/16/79 VI-10 A.

DL/SEPB 7

NRC to NU 10/08/81 VI-2 D.

DSI/CSB 7

NRC TO NU 09/15/82 VI-10 B.

DL/SEPB 7

HU to NRC 08/05/81 VI-3 DSI/CSB 7

NRC TO NU 09/15/82 VII-1 A.

DL/SEPB 7

NRC to NU 07/23/81 VI-4 DSI/CSB 7(SYS)

HRC TO HU 10/08/82 DL/SEPS 7(ELEC) NRC TO NU 06/24/82 VII-1 B.

DL/SEPB 7

HRC to NU 08/17/78 VI-5 X

HRC to NU 05/07/81 VII-2 DL/SEPB 7

NU TO HRC 06/25/82 VI-6 DSI/CSB 7

NRC TO HU 10/22/82 VII-3 DL/SEPB 7(Sys)

NU to NRC 07/22/81 DL/SEPB 7(ELEC) HRC TO HU 09/16/82 VI-7 A.

1 X

NRC to NU 11/16/79 VII-4 X

HRC to NU 05/07/81 VI-7 A. 2.

X HRC to NU 05/07/81 VII-5 X

NRC to NU 05/07/81 VI-7 A.

3.

DL/SEPB 7

HRC to NU 10/27/81 VII-6 DL/SEPB 7

HRC to NU 08/26/81 VI-7 A. 4.

DSI/CPB 7

NRC TO NU 03/11/82 VII-7 X

NRC to NU 11/16/79 VI-7 B.

X NRC to NU 11/16/79 VIII-1 A.

DSI/PSB 7

NRC TO NU 06/30/82 VI-7 C.

DL/SEPB 7

HRC to NU 03/29/81 VIII-2 DL/SEPB 7

NRC to NU 09/30/81 VI-7 C.

1.

DL/SEPB 7

NU to NRC 11/02/81 VIII-3 A.

DL/SEPB 7

NRC to NU 08/26/81 VI-7 C. 2.

DL/SEPB 7

HRC to NU 03/29/81 VIII-3 B.

DL/SEPB 7

NRC to NU 07/23/81 VI-7 C.

3.

X NRC to NU 11/16/79 VIII-4 DL/SEPB 7

HRC to NU 07/07/81 (2-25)

MILLSTONE 1 TOPIC HO.

REVIEW STATUS REMARKS TOPIC HO.

REVIEW STATUS REMARKS DIV/BR DIV/BR IX-1 DSI/ASB 7

NRC TO HU 03/09/82 XV-10 X

NRC to NU 11/16/79 IX-2 X

HRC to NU 05/07/81 XV-11 DSI/CPB 7

NRC to NU 10/14/81 IX-3 DL/SEPB 7

NRC TO NU 07/16/82 XV-12 X

HRC to NU 11/16/79 IX-4 X

NRC to NU 11/16/79 XV-13 DSI/CPB 7(Sys)

HU to NRC 09/09/81 DSI/AEB 7(Doses) HRC to NU 11/03/81 IX-5 DL/SEPB 7

HRC TO HU 09/14/82 XV-14 DSI/RSB 7

NRC to NU 09/18/81 IX-6 DE 7

HRC TO NU 06/15/82 XV-15 DSI/RSB 7

NRC to NU 10/28/81 X

X HRC to NU 05/07/81 XV-16 DSI/AEB 7

NU to NRC 01/13/82 XI-1 X

HRC to NU 12/04/81 XV-17 X

NRC to HU 11/16/79 XI-2 X

NRC to NU 12/04/81 XV-18 DSI/AEB 7

HU to HRC 01/13/82 XIII-1 X

NRC to HU 05/07/81 XV-19 DSI/RSB 7(Sys)

HRC to NU 08/26/81 XIII-2 DL/SSPB 7

NRC TO HU 06/09/82 DSI/AEB 7(DOSES) HRC TO NU 01/13/82 XV-1 DSI/RSB 7

HRC to NU 12/31/81 XV-20 DSI/AEB 7

NRC to NU 11/03/81 XV-2 X

NRC to NU' 11/16/79 XV-21 X

NRC to HU 05/07/81 XV-3 DSI/RSB 7

NRC to NU 09/18/81 XV-22 X

NRC to NU 05/07/81 XV-4 DSI/RSB 7

HRC to NU 09/18/81 XV-23 X

NRC to NU 05/07/81 XV-5 DSI/RSB 7

HRC to NU 01/07/82 XV-24 X

NRC to HU 05/07/81 XV-6 X

HRC to HU 11/16/79 XVI X

NRC to NU 11/15/80 XV-7 DSI/RSB 7

NRC to HU 12/04/81 XVII DL 7

NRC to HU 08/17/78 XV-8 DSI/CPB 7

NRC to HU 08/26/81 XV-9 DSI/RSB 7

NRC to NU 01/12/82 (2-26)

OYSTER CREEK FACILITY: OYSTER CREEK 1 TOPIC NO.

REVIEW STATUS REMARKS DIV/BR LICENSEE: JERSEY CENTRAL POWER 8 LIGHT II-1 A.

DE/SAB 7

NRC to JCPL 02/04/82 REGION / LOCATION: 9 MILES SOUTH OF TOMS RIVER, NJ.

II-1 B.

DE/SAB 7

NRC to 02/04/82 DOCKET NO.

05000219 II-1 C.

DE/SAB 7

PL 02/04/82 POWER CAPACITY: 1930(THERMAL) 0650(ELECTRICAL)

II-2 A.

DSI/AEB t J L 11/16/81 OL NUMBER: DPR-16

(S II-2 B.

X RC to JCPL 05/07/81 H.S.S.S.: GE.

II-2 DSI/A B 7

NRC TO JCPL 03/16/82 A/E FIRM: B8R II-2 X

HRC to JCPL 05/07/81 SY$scMATIC EVALUATIDH PROGRAM BRANCH CHIEF: W. RUSS I jI-).

DE/HGEB 7

NRC TO JCPL 08/27/82 II-3 B.

bHGEB 7

NRC TO JCPL 08/27/82 OPERATING REACTORS BRANCH CHIEF: D. CRUTC I D l

OPERATING REACTORS PROJECT MANAGER:

. O BAR I

1.

/ Eb 7

HRC TO JCPL 08/27/82 ZHTEGRATED ASSESSMENT P C

AGll G.

A INA II-E/HGEB 7

HRC TO JCPL 08/27/82 l

\\ id '

DE/

I T,\\m STATUS (C M S

)

HRC to JCPL 08/03/81 E

g-W( lh% /

- B D GSB 7

HRC to JCPL 08/03/81 II-4 A.

HRC to JCPL 06/08/81 CEIV G-EE 4a-DRAFT SE R FROM REVIEk CH X-L ED I 4 DE/GSB 7

NRC to JCPL 06/08/81 4b-SAR RECEIVED FROM 0 - TOPIC NOT LICENSEE g

II-4 D.

DE/HGEB 7

HRC TO JCPL 06/28/82 STARTED 5 - DRAF E SENT II-4 E.

X HRC to JCPL 11/16/79 1 - QUESTIONS RECEIVED TU I

FRON REVIEW BRANCH II-4 F.

DE/HGEB 7

NRC TO JCPL 06/15/82 6 - SI R

RECEIVED 2 - QUESTIONS SENT B1 N III-1 DL/SEPB 7(SYS)

HRC TO JCPL 08/30/82 TO UTILITY DL/SEPB 7(Elec) HRC to JCPL 07/09/81 7 - TOPIC COMPLETE 3 - QUESTION RESPONSE III-2 DL/SEPB 7

HRC TO JCPL 06/15/82 RECEIVED BY HRC (2-27)

0YSTER CREEK TOPIC HO.

REVIEW STAldS REMARKS TOPIC HO.

REVIEW STATUS REMARKS DIV/BR DIV/BR III-3 A.

DE/SEB 7

NRC TO JCPL 05/14/82 III-10 B.

X NRC to JCPL 11/16/79 III-3 B.

X NRC to JCPL 12/26/80 III-10 C.

X NRC to JCPL 11/16/79 III-3 C.

DE/HGEB 7

NRC TO JCPL 08/27/82 III-11 X

HRC to JCPL 05/07/81 III-4 A.

DSI/ASB 7

NRC TO JCPL 08/27/82 III-12 X

HRC to JCPL 05/07/81 III-4 B.

DE/MTEB 7

NRC TO JCPL 06/28/82 IV-1 A.

DL/SEPB 7

HRC to JCPL 05/30/79 III-4 C.

DSI/ASB 7

HRC TO JCPL 06/15/82 IV-2 DSI/ICSB 7

HRC 10 JCPL 06/18/82 III-4 D.

DE/SAB 7

HRC TO JCPL 06/21/82 IV-3 X

HRC to JCPL 05/07/81 III-5 A.

DL/SEPB 7

HRC TO JCPL 06/29/82 V-1 X

NRC to JCPL 11/27/81 III-5 B.

DL/SEPB 7

NRC TO JCPL 06/22/82 V-2 X

NRC to JCPL 11/16/79 III-6 DL/SEPB 7

HRC TO JCPL 05/12/82 V-3 X

HRC to JCPL 05/07/81 III-7 A.

X NRC to JCPL 05/07/81 V-4 X

HRC to JCPL 05/07/81 III-7 B.

DL/SEPB 7

NRC TO JCPL 08/27/82 V-5 DL/SEPB 7

HRC to JCPL 02/22/82 III-7 C.

X NRC to JCPL 11/16/79 V-6 DL/SEPB 7

HRC to JCPL 03/05/80 III-7 D.

DE/SEB 7

NRC TO JCPL 03/08/82 V-7 X

HRC to JCPL 05/07/81 III-8 A.

DSI/CPB 7

HRC TO JCPL 02/29/82 V-8 X

HRC to JCPL 05/07/81 III-8 B.

X HRC to JCPL 09/26/80 V-9 X

HRC to JCPL 11/16/79 III-8 C.

DL/SEPB 7

NRC to JCPL 10/30/80 V-10 A.

DL/SEPB 7

JCPL to NRC 05/15/79 III-8 D.

X HRC to JCPL 05/07/81 V-10 B.

DL/SEPB 7

HRC to JCPL 09/25/80 III-9 X

NRC to JCPL 0$/07/81 V-11 A.

DL/SEPB 7

HRC to JCPL 07/08/81 III-10 A.

DL/SEP8 7

HRC to JCPL 06/29/81 V-11 B.

DL/SEPB 7(Sys)

HRC to JCPL 09/25/80 DL/SEPB 7(Elec) HRC to JCPL 07/09/81 (2-28)

OYSTER CREEK TOPIC NO.

REVIEW STATUS REMARKS TOPIC NO.

REVIEW STATUS REMARKS DIV/BR DIV/BR V-12 A.

DL/SEPB 7

NRC TO JCPL 03/16/81 VI-7 D.

DL/SEPB 7

HRC to JCPL 08/17/78 V-13 X

HRC to JCPL 05/07/81 VI-7 E.

X HRC to JCPL 05/07/81 VI-1 DE/CEB 7

HRC TO JCPL 06/29/82 VI-7 F.

X NRC to JCPL 11/16/79 VI-2 A.

X NRC to JCPL 05/07/81 VI-8 X

HRC to JCPL 05/07/81 VI-2 B.

X HRC to JCPL 05/07/81 VI-9 X

HRC to JCPL 11/16/79 VI-2 C.

X NRC to JCPL 11/16/79 VI-10 A.

DL/SEPB 7

HRC to JCPL 08/18/81 VI-2 D.

DSI/CSB 7

NRC TO JCPL 04/30/32 VI-10 B.

X NRC to JCPL 11/16/79 VI-3 DSI/CSB 7

NRC TO JCPL 04/30/82 VII-1 A.

DL/SEPB 7

HRC to JCPL 07/30/81 VI-4 DSI/CSB 7(SYS)

HRC TO JCPL 06/15/82 VII-1 B.

DL/SEPB 7

NRC to JCPL 12/28/81 DL/SEPB 7(Elec) HRC to JCPL 08/05/81 VII-2 DL/SEPB 7

NRC TO JCPL 06/29/81 VI-5 X

HRC to JCPL 05/07/81 VII-3 DL/SEPB 7(Sys)

HRC to JCPL 09/25/80 VI-6 DSI/CSB 7

HRC TO JCPL 03/04/82 DL/SEPB 7(Cloc) HRC to JCFL 07/09/81 VI-7 A.

1.

X NRC to JCPL 11/16/79 VII-4 X

HRC to JCPL 05/07/81 VI-7 A. 2.

X NRC to JCPL 05/07/81 VII-5 X

HRC to JCPL 05/07/81 VI-7 A.

3.

DL/SEPB 7

NRC to JCPL 07/30/81 VII-6 DL/SEPB 7

NRC to JCPL 08/29/81 VI-7 A. 4.

DSI/RSB 7'

HRC TO JCPL 08/27/82 VII-7 X

NRC to JCPL 11/16/79 VI-7 3.

X HRC to JCPL 11/16/79 VIII-1 A.

DSI/PSB 7

NRC to JCPL 03/03/82 VI-7 C.

DL/SEPB 7

NRC to JCPL 03/13/81 VIII-2 DL/SEPB 7

tiRC to JCPL 06/29/81 VI-7 C.

1 DL/SEPB 7

NRC to JCPL 06/29/81 VIII-3 A.

DL/SEPB 7

NRC to JCPL 06/29/81 VI-7 C. 2.

DL/SEPB 7

NRC to JCPL 03/13/81 VIII-3 B.

DL/SEPB 7

HRC to JCPL 06/29/81 VI-7 C.

3.

X HRC to JCPL 11/16/79 VIII-4 DL/SEPB 7

NRC TO JCPL 08/26/81 (2-29)

OYSTER CREEK TOPIC NO.

REVIEW STATUS REMARKS TOPIC NO.

REVIEW STATUS REMARKS DIV/BR DIV/BR IX-1 DSI/ASB 7

HRC TO JCPL 06/01/82 XV-10 X

NRC to JCPL 11/16/79 IX-2 X

NRC to JCPL 05/07/81 XV-11 DSI/CPB 7

HRC TO JCPL 05/17/82 IX-3 DSI/ASB 7

HRC to JCPL 11/13/81 XV-12 X

HRC to JCPL 11/16/79 IX-4 X

NRC to JCPL 05/07/81 XV-13 DSI/AEB 7(DOSES) HRC TO JCPL 09/02/82 DSI/CPB 7(SYS)

NRC to JCPL 05/17/82 IX-5 DL/SEPB 7

NRC TO JCPL 06/28/82 XV-14 DSI/R$8 7

HRC to JCPL 07/16/81 IX-6 DE 7

NRC TO JCPL 06/15/82 XV-15 DSI/RSB 7

NRC to JCPL 12/04/81 X

X NRC to JCPL 05/07/81 XV-16 DSI/AEB 7

HRC TO JCPL 09/02/82 XI-1 X

HRC to JCPL 12/04/81 XV-17 X

HRC to JCPL 11/16/79 XI-2 X

HRC to JCPL 12/04/81 XV-18 DSI/AEB 7

HRC TO JCPL 09/02/82 XIII-1 X

HRC to JCPL 05/07/81 XV-19 DSI/AEB 7(DOSES) NRC TO JCPL 09/02/82 XIII-2 DL/SSPB 7

HRC to JCPL 09/25/80 DSI/RSB 7 t. sy s )

NRC to JCPL 09/04/81 XV-1 DSI/RSB 7

NRC to JCPL 12/07/81 XV-20 DSI/AEB 7

NRC TO JCPL 09/02/82 XV-2 X

NRC to JCPL 11/16/79 XV-21 X

NRC to JCPL 05/07/81 XV-3 DSI/RSB 7

NRC to JCPL 07/16/81 XV-22 X

NRC to JCPL 05/07/81 XV-4 DSI/RSB 7

NRC to JCPL 07/16/81 XV-23 X

NRC to JCPL 05/07/81 XV-5 DSI/RSB 7

NRC to JCPL 12/07/81 XV-24 X

NRC to JCPL 05/07/81 XV-6 X

NRC to JCPL 11/16/79 XVI X

NRC to JCPL 11/05/80 XV-7 DSI/RSB 7

HRC to JCPL 12/04/81 XVII DL 7

NRC to JCPL 08/17/78 XV-8 DSI/CPB 7

HRC TO JCPL 05/17/82 XV-9 DSI/RSB 7

HRC to JCPL 01/07/82 l

l (2-30)

PALISADES FACILITY: PALISADES TOPIC NO.

REVIEW STATUS REMARKS DIV/BR LICENSEE CONSUMERS POWER II-1 A.

DL/SEPB 7

CPCo to NRC 12/28/79 REGION / LOCATION: 5 MILES SOUTH OF SOUTH HAVEN, MI.

II-1 B.

DL/SEPB 7

CPCo t C

12/28/79 DOCKET NO: 05000255 POWER CAPACITY: 2530(THERMAL) 0805(ELECTRICAL)

II-2 A.

DSI/AEB t C Co 06/30/81 OL NUMBER: DPR-20

{S II-2 B.

X RC to CPCo 05/07/81 N.S.S.S.: C-E II-2 DSI/ B 7

NRC to CPCo 04/23/81 A/E FIRM BECH.

II-2 X

HRC to CPCo 05/07/81 ys.I-DE/HGEB 7

HRC to CPCo 02/19/82 SYSTEMATIC EVALUATION PROGRAM BRANCH CHIEF: W. RUSS OPERATING REACTORS BRANCH CHIEF: D. CRUTCH I II-3 B.

GEB 7

NRC to CPCo 02/19/82 l

OPERATING REACTORS PROJECT MANAGER:

A BAC I

1.

/ EB 7

HRC to CPCo 02/19/82 C AELS[l-INTEGRATED ASSESSMENT P AGl.

T.

II-E/HGEB 7

HRC to CPCo 02/19/82 T

TJ I

DE/

CPCo to NRC 07/22/81 as usfC ES

/

g--(lbg_)

B.

II-4 A.

HRC to CPCo 06/08/81 G-EE-4a-DRAFT SE R EI GSB 7

CPCo to NRC 07/22/81 FROM REVIEh CH X-L ED I 4.

DE/GSB 7

HRC to CPCo 06/08/81 4b-SAR RECEIVED FROM g

0 - TOPIC NOT LICENSEE II-4 D.

DE/HGEB 7

CPCo to NRC 06/01/81 STARTED 5 - DRAFT SE SEN II-4 E.

X HRC to CPCo 11/16/79 1 - QUESTIONS RECEIVED T(r FROM REVIEW BRANCH II-4 F.

DE/HGEB 7

CPCo to NRC 06/01/81 2 - QUESTIONS SENT B1 N III-1 DL/SEPB 7(Elec) HRC to CPCo 11/12/80 TO UTILITY DL/SEPB 7(Sys)

NRC to CPCo 02/08/82 7 - TOPIC COMPLETE 3 - QUESTION RESPONSE RECEIVED BY HRC (2-31)

PALISADES TOPIC NO.

REVIEW STATUS REMARKS TOPIC NO.

REVIEW STATUS REMARKS DIV/BR DIV/BR III-2 DL/SEPB 7

NRC to CPCo 02/08/82 III-10 B.

DL/SEPB 7

HRC to CPCo 02/02/82 III-3 A.

DE/SEB 7

NRC to CPCo 08/26/81 III-10 C.

X NRC to CPCo 11/16/79 III-5 B.

X NRC to CPCo 12/26/80

.III-11 X

NRC to CPCo 05/07/81 III-3 C.

DE/HGEB 7

NRC to CPCo 02/22/82 III-12 X

NRC to CPCo 05/07/81 III-4 A.

DSI/AEB 7

NRC to CPCo 02/02/82 IV-1 A.

DL/SEPB 7

CPCo to NRC 02/08/79 III-4 B.

DE/MTEB 7

NRC to CPCo G2/03/82 IV-2 DSI/ICSB 7

NRC to CPCo 02/08/82 III-4 C.

DSI/ASB 7

NRC to CPCo 09/21/81 IV-3 X

NRC to CPCo 05/07/81 III-4 D.

DE/SAB 7

CPCo to NRC 08/03/81 V-1 X

NRC to CPCo 11/27/81 all-5 A.

DL/SEPB 7

NRC to CPCo 02/08/82 V-2 X

HRC to CPCo 11/16/79 III-5 B.

DL/SEPB 7

HRC to CPCo 02/19/82 V-3 X

NRC to CPCo 05/07/81 III-6 DL/SEPB 7

CPCo to NRC 12/16/81 V-4 X

NRC to CPCo 05/07/81 III-7 A.

DL/SEPB 7

NRC to CPCo 02/10/82 V-5 DL/SEPB 7

NRC to CPCo 02/04/82 III-7 B.

DL/SEPB 7

NRC to CPCo 02/12/82 V-5 DL/SEPB 7

NRC to CPCo 03/05/80 III-7 C.

DE/SEB 7

NRC to CPCo 10/19/81 V-7 DSI/ASB 7

NRC to CPCo 11/16/81 III-7 D.

DE/SEB 7

CPCo to NRC 08/17/81 V-8 X

HRC to CPCo 05/07/81 III-8 A.

DSI 7

HRC to CPCo 11/18/81 V-9 X

NRC to CPCo 11/16/79 III-8 B.

X NRC to CPCo 10/01/80 V-10 A.

DL/SEPB 7

NRC to CPCo 09/26/81 III-8 C.

DL/MTEB 7

CPCo to NRC 12/28/79 V-10 B.

DL/SEPB 7

CPCo to NRC 12/23/81 III-8 D.

X NRC to CPCo 05/07/81 V-11 A.

DL/SEPB 7

NRC to CPCo 11/09/81 III-9 X

NRC to CPCo 05/07/81 V-11 B.

DL/SEPB 7(Sys)

HRC to CPCo 12/23/81 DL/SEPB 7(Elec) HRC to CPCo 12/24/81 III-10 A.

DL/SEPB 7

NRC to CPCo 05/19/81 (2-32)

PALISADES TOPIC NO.

REVIEW STATUS REMARKS TOPIC NO.

REVIEW STATUS REMARKS DIV/BR DIV/DR V-12 A.

X NRC to CPCo 11/16/79 VI-7 D.

DL/SEPB 7

NRC to CPCo 08/17/78 V-13 X

HRC to CPCo 05/07/81 VI-7 E.

X HRC to CPCo 05/07/81 VI-1 DE/CEB 7

NRC to CPCo 08/03/81 VI-7 F.

DL/SEPB 7

HRC to CPCo 10/29/81 VI-2 A.

X HRC to CPCo 05/07/81 VI-8 X

NRC to CPCo 05/07/81 VI-2 B.

X NRC to CPCo 05/07/81 VI-9 X

NRC to CPCo 11/16/79 VI-2 C.

X NRC to CPCo 11/16/79 VI-10 A.

DL/SEPB 7

NRC to CPCo 10/16/81 VI-2 D.

DSI/CSB 7

NRC to CPCo 11/16/81 VI-10 B.

X NRC to CPCo 11/16/79 VI-3 DSI/CSB 7

NRC to CPCo 11/16/81 VII-1 A.

DL/SEPS 7

NRC to CPCo 08/28/81 VI-4 DL/SEFB 7(Elec) CPCo to NRC 08/18/81 VII-1 B.

DL/SEPB 7

HRC to CPCo 08/17/78 DCI/CSB 7(Sys)

HRC to CPCo 02/08/82 VII-2 DL/SEPB 7

HRC to CPCo 05/19/81 VI-5 X

NRC to CPCo 05/07/81 VII-3 DL/SEPB 7(Sys)

CPCo to NRC 12/23/81 VI-6 DSI/CSB 7

NRC to CPCo 12/11/81 DL/SEPB 7(Elec) CPCo to NRC 12/31/81 VI-7 A.

1.

X NRC to CPCo 11/16/79 VII-4 X

NRC to CPCo 05/07/81 VI-7 A. 2.

X NRC to CPCo 05/07/81 VII-5 X

HRC to CPCo 05/07/81 VI-7 A.

3.

DL/SEPB 7

NRC to CPCo 12/18/81 VII-6 DL/SEPB 7

HRC to CPCo 05/19/81 VI-7 A.

4.

X NRC to CPCo 05/07/81 VII-7 X

HRC to CPCo 11/16/79 VI-7 B.

DL/SEPB 7(Elec) HRC to CPCo 05/19/81 VIII-1 A.

DSI/PSB 7

NRC to CPCo 12/22/81 DSI/RSB 7(Sys)

HRC to CPCo 06/30/81 VIII-2 DL/SEPB 7

NRC to CPCo 10/29/81 VI-7 C.

DL/SEPB 7

HRC to CPCo 02/20/81 VIII-3 A.

DL/SEPB 7

HRC to CPCo 05/22/81 VI-7 C.

1.

DL/SEPB 7

NRC to CPCo 10/14/81 VIII-3 B.

LL/SEPB 7

NRC to CPCo 08/05/81 VI-7 C. 2.

DL/SEPB 7

NRC to CPCo 02/20/81 VIII-4 DL/SEPB 7

NRC to CPCo 07/31/81 VI-7 C.

3.

X CPCo to NRC 12/12/79 (2-33)

PALISADES TOPIC NO, REVIEW STATUS REMARKS TOPIC HO.

REVIEW STATUS REMARKS DIV/BR DIV/BR IX-1 DSI/ASB 7

NRC to CPCo 02/08/82 XV-10 DL/SEPB 7

NRC to CPCo 11/03/81 IX-2 X

NRC to CPCo 05/07/81 XV-11 X

NRC to CPCo 10/01/80 IX-3 DL/SEPB 7

NRC to CPCo 02/22/82 XV-12 DL/SEPB 7(Doses) NRC to CPCo 12/04/81 DL/SEPB 7(Sys)

PD.C to CPCo 11/03/81 IX-4 DSI/RS3 7

NRC to CPCo 02/08/82 XV-13 X

HRC to CPCo 11/16/79 IX-5 DL/SEPB 7

HRC to CPCo 02/11/82 XV-14 DL/SEPB 7

HRC to CPCo 11/03/81 IX-6 DE 7

NRC TO CPCO 04/07/82 XV-15 DL/SEPB 7

NRC to CPCo 11/03/81 X

X NRC to CPCo 05/07/81 XV-16 DL/SEPB 7

NRC to CPCo 11/03/81 XI-1 X

NRC to CPCo 12/04/81 XV-17 DL/SEPB 7(Doses) HRC to CPCo 11/03/81 XI-2 X

NRC to CPCo 12/04/81 DL/SEPB 7(Sys)

NRC to CPCo 11/03/81 XIII-1 X

NRC to CPCo 05/07/81 XV-18 X

NRC to CPCo 10/01/80 XIII-2 DL/SSPB 7

HRC to CPCo 10/01/80 XV-19 DL/SEPB 7(Doses) HRC to CPCo 11/03/81 DL/SEPB 7(Sys)

HRC to CPCo 11/03/81 XV-1 DL/SEPB 7

NRC to CPCo 11/03/81 XV-20 DL/SEPB 7

NRC to CPCo 11/03/81 XV-2 DL/SEPB 7(Doses) HRC to CPCo 11/03/81 DL/SEPB 7(Sys)

NRC to CPCo 11/03/81 XV-21 X

NRC to CPCo 05/07/s1 XV-3 DL/SEPB 7

NRC to CPCo 11/03/81 XV-22 X

NRC to CPCo 05/07/81 XV-4 DL/SEPB 7

NRC to CPCo 11/03/81 XV-23 X

NRC to CPCo 05/07/81 XV-5 DL/SEPB 7

HRC to CPCo 11/03/81 XV-24 X

NRC to CPCo 05/07/81 XV-6 DL/SEPB 7

HRC to CPCo 11/03/81 XVI X

HRC to CPCo 11/05/80 XV-7 DL/SEPB 7

NRC to CPCo 11/03/81 XVII DL 7

HRC to CPCo 08/17/78 XV-8 DL/SEPB 7

NRC to CPCo 11/C3/81 XV-9 DL/SEPB 7

NRC to CPCo 11/03/81 (2-34)

SAN ONOFRE FACILITY: SAN ONOFRE 1 TOPIO NO.

REVIEW STATUS REMARKS DIV/BR LICENSEE: SOUTHERN CALIFORNIA EDISON II-t A.

DL/SEPB 7

NRC to SCE 11/07/79 REGION / LOCATION: 5 MILES SOUTH OF SAN CLEMENTE. CA.

II-1 B.

DL/SEPB 7

HRC to SCE 11/07/79 COCKET NO.

05000206 II-t C.

DE/SAB 7

HRC TO SCE 05/03/83 POWER CAPACITY: 1347(THERMAL) 0430(ELECTRICAL)

II-2 A.

DSI/AEB 7

HRC to SCE 04/27/81 OL HUMBER: DPR-13 II-2 B.

X NRC to SCE 05/07/81 N.S.S.S.*

WEST.

II-2 C.

DSI/AEB 7

HRC to SCE 11/18/81 A/E FIRM: BECH.

II-2 D.

X HRC to SCE 05/07/81 SYSTEMATIC EVALUATION PROGRAM BRANCH CHIEF: W.

RUSSELL II-3 A.

DE/HGEB 5

NRC TO SCE 01/31/83 OPERATING REACTORS BRANCH CHIEF: D. CRUTCHFIELD II-3 B.

DE/HGEB 5

NRC TO SCE 01/31/83 OPERATING REACTORS PROJECT MANAGER: W.

PAULSON II-3 B.

?.

DE/HGEB 5

NRC TO SCE 01/31/83 INTEGRATED ASSESSMENT PROJECT MANAGER: E.MCKENNA{p[);(

II-3 C.

DE/HGEB 5

NRC TO SCE 01/31/83 IT-4 DE/GSB 7

HRC TO SCE 11/18/82 KEY FOR STATUS CODES II-4 A.

DE/GSB 7

HRC TO SCE 11/19/82 G - GENERIC 4a-DRAFT SE RECEIVED II-4 B.

DE/GSB 7

NRC TO SCE 11/18/82 FROM REVIEW BRANCH X - DELETED II-4 C.

DE/GSB 7

HRC TO SCE 09/16/82 4b-SAR RECEIVED FROM 0 - TOPIC NOT LICENSEE II-4 D.

DE/HGEB 7

NRC TO SCE 11/12/82 STARTED 5 - DRAFT SE SENT II-4 E.

X NRC to SCE 11/16/79 1 - QUESTIONS RECEIVED TO UTILITY FROM REVIEW BRANCH II-4 F.

DE/HGEB 7

HRC TO SCE 12/01/82 6 - SE RESPONSE RECEIVED 2 - QUESTIONS SENT BY HRC III-1 DL/SEPB 6(SYS)

SCE TO NRC 01/26/83 TO UTILITY DL/SEPB 7(Elac) Part of VII-3 11/18/81 7 - TOPIC COMPLETE 3 - QUESTION RESPONSE III-2 DL/SEPB 7

NRC TO SCE 02/01/83 RECEIVED BY NRC (2-35)

SAN ON0FRE TOPIC NO.

REVIEW STATUS REMARKS TOPIC NO.

REVIEW STATUS REMARKS DIV/BR DIV/BR III-3 A.

DE/SEB 3

SCE to NRC 09/08/80 III-10 B.

DL/SEPB 7

NRC to SCE 11/08/79 III-3 B.

X NRC to SCE 11/16/79 III-10 C.

X NRC to SCE 11/16/79 III-3 C.

DE/HGEB 7

HRC to SCE 11/27/81 III-11 X

NRC to SCE 05/07/81 III-4 A.

DSI/ASB 7

NRC TO SCE 11/19/82 III-12 X

HRC to SCE 05/07/81 III-4 B.

DE/MTEB 7

NRC TO SCE 02/01/83 IV-1 A.

DL/SEPB 7

NRC to SCE 11/13/79 III-4 C.

DSI/ASB 7

NRC TO SCE 10/12/82 IV-2 DSI/ICSB 7

NRC TO SCE 01/03/83 III-4 D.

DE/SAB 7

NRC TO SCE 11/16/82 IV-3 X

HRC to SCE 05/07/81 III-5 A.

DL/SEPB D

V-1 X

HRC to SCE 11/2.'/81 III-5 B.

DL/SEPB 4B SCE TO NRC 03/31/83 v-2 X

HRC to SCE 11/16/79 III-6 DL/SEPB 3

SCE to NRC 12/08/81 V-3 X

NRC to SCE 05/07/81 III-7 A.

X HRC to SCE 05/07/81 V-4 X

HRC to SCE 05/07/81 III-7 B.

DL/SEPB 6

SCE TO HRC 01/26/83 V-5 DL/SEPB 7

NRC TO SCE 03/07/83 III-7 C.

X NRC to SCE 11/16/79 V-6 DL/SEPB 7

PRC to SCE 03/05/80 III-7 D.

DE/SEB 7

HRC TO SCE 03/01/83 V-7 DSI/ASB 7

NRC to SCE 12/04/81 III-8 A.

DSI 7

NRC to SCE 12/21/81 V-8 X

HRC to SCE 05/07/81 III-8 B.

X NRC to SCE 10/01/80 V-9 X

NRC to SCE 11/16/79 III-8 C.

DL/SEPB 7

NRC to SCE 01/29/80 V-10 A.

DL/SEPB 7

NRC to SCE 01/07/81 III-8 D.

X NRC to SCE 05/07/81 V-10 B.

DL/SEPB 7

NRC TO SCE 11/12/82 III-9 X

NRC to SCE 05/07/81 V-11 A.

DL/SEPB 7

HRC to SCE 08/03/81 III-10 A.

DL/SEPB 7

SCE to NRC 07/24/81 V-11 B.

DL/SEPB 7(SYS)

NRC TO SCE 11/12/8?

DL/SEPB 7(Elec) HRC to SCE 02/04/E2 (2-36)

SAN ON0FRE TCPIC HD.

REVIEW STATUS REMARKS TOPIC NO.

REVIEW STATUS REMARKS DIV/BR DIV/BR V-12 A.

X NRC to SCE 11/16/79 VI-7 D.

DL/SEPB 7

NRC to SCE 08/17/78 V-13 X

HRC to SCE 05/07/81 VI-7 E.

X HRC to SCE 05/07/81 VI-1 7

NRC TO SCE 07/13/82 VI-7 F.

X NRC to SCE 11/16/79 VI-2 A.

X HRC to SCE 05/07/81 VI-8 X

NRC to SCE 05/07/81 VI-2 B.

X NRC to SCE 05/07/81 VI-9 X

NRC to SCE 11/16/79 VI-2 C.

X NRC to SCE 11/16/79 VI-10 A.

DL/SEPB 7

HRC TO SCE 04/28/83 VI-2 D.

DSI/CSB 7

NRC TO SCE 02/24/83 VI-10 B.

DL/SEPB 7

HRC to SCE 11/15/79 VI-3 DSI/CSB 7

HRC TO SCE 02/24/83 VII-1 A.

D /SEPB 7

HRC TO SCE 02/10/83 VI-4 DSI/CSB 7(SYS)

HRC TO SCE 09/16/82 DL/SEPB 7(Elec) HRC to SCE 12/06/82 VII-1 B.

DL/SEPB 7

NRC to SCE 08/17/78 VI-5 X

HRC to SCE 05/07/81 VII-2 DL/SEPB 7

NRC TO SCE 03/29/83 VI-6 DSI/CSB 7

HRC TO SCE 08/12/82 VII-3 DL/SEPB 7(SYS)

NRC TO SCE 11/12/82 DL/SEPB 7(Elec) HRC to SCE 06/04/82 VI-7 A.

1 DL/SEPB 7

NRC to SCE 02/20/81 VII-4 X

NRC to SCE 05/07/81 VI-7 A.

2.

X NRC to SCE 05/07/81 VII-5 X

HRC to SCE 05/07/81 VI-7 A.

3.

DL/SEPB 7

HRC TO SCE 02/01/83 VII-6 DL/SEPB 7

HRC to SCE 08/28/81 VI-7 A.

4.

X HRC to SCE 05/07/81 VII-7 X

HRC to 3CE 11/16/79 VI-7 B.

DSI/RSB 7(SYS)

HRC TO SCE 11/24/82 DL/SEFB 7(Elec) SCE TO NRC 09/15/82 VIII-1 A.

DSI/RSB 7

NRC TO SCE 11/23/82 VI-7 C.

DL/SEPB 7

HRC to SCE 06/01/81 VIII-2 DL/SEPB 7

NRC to SCE 07/31/81 VI-7 C.

1 DL/SEPB 7

NRC to SCE 08/03/31 VIII-3 A.

DL/SEPB 7

HRC to SCE 11/07/79 VI-7 C.

2.

DL/SEPB 7

HRC to SCE 06/01/81 VIII-3 B.

DL/SEPB 7

HRC TO SCE 02/24/83 VI-7 C.

3.

X HRC to SCE 11/16/79 VIII-4 DL/SEPB 7

NRC TO SCE 12/06/82 (2-37)

SAN ONOFRE TOPIC HC.

REVIEW STATUS REMARKS TOPIC HO.

REVIEW STATUS REMARKS DIV/BR DIV/BR IX-1 DSI/ASB 7

NRC TO SCE 12/07/82 XV-10 DSI/RSB 7

HRC TO SCE 03/29/83 IX-2 X

HRC to SCE 05/07/81 XV-11 X

HRC to SCE 10/01/83 IX-3 DL/SEPB 7

HRC TO SCE 12/27/82 XV-12 DSI/RSB 7(Sys)

HRC to SCE 04/05/82 DL/SEPB 7(Doses) HRC to SCE 01/29/80 IX-4 DSI/RSB 7

NRC to SCE 07/16/81 XV-13 X

HRC to SCE 11/16/79 IX-5 DL/SEPB 7

HRC TO SCE 11/02/82 XV-14 DSI/RSB 7

HRC to SCE 02/22/82 IX-6 DE 7

HRC TO SCE 12/02/82 XV-15 DSI/RSB 7

NRC TO SCE 04/20/82 X

X NRC to SCE 05/07/81 XV-16 DSI/AEB 7

NRC to SCE 04/05/82 XI-1 X

HRC to SCE 12/04/81 XV-17 DSI/RSB 7(Sys)

SCE TO NRC 03/12/82 XI-2 X

NRC to SCE 12/04/81 DSI/AEB 7(Doses) HRC to SCE 01/29/80 XIII-1 X

NRC to SCE 05/07/81 XV-18 X

HRC to SCE 10/01/80 XIII-2 DL/SSPB 7

NRC to SCE 01/22/81 XV-19 DSI/RSB 7(Sys)

SCE TO HRC 03/12/82 DL/SEPB 7(Doses) HRC to SCE 01/29/80 XV-1 DSI/RSE 7

NRC TO SCE 07/72/82 XV-20 DL/SEPB 7

HRC to SCE 03/28/80 XV-2 DSI/RSB 7(SYS)

NRC TO SCEP 12/17/82 DL/SEPB 7(Doses) HRC to SCE 01/29/80 XV-21 X

NRC to SCE 05/07/81 XV-3 DSI/RSB 7

SCE TO NRC 03/12/82 XV-22 X

NRC to SCE 05/07/81 XV-4 DSI/RSB 7

NRC to SCE 04/05/82 XV-23 X

HRC to SCE 05/07/81 XV-5 DSI/RSB 7

NRC TO SCE 03/14/83 XV-24 X

NRC to SCE 05/07/81 XV-6 DSI/RSB 7

HRC TO SCE 03/03/82 XVI X

HRC to SCE 11/05/80 XV-7 DSI/RSB 7

NRC TO SCE 11/03/82 XVII DL 7

HRC to SCE 11/20/79 XV-8 DSI/CPB 7

SCE TO HRC 03/12/82 XV-9 DSI/RSB 7

NRC to SCE 02/24/82 (2-38)

l l

YANKEE FACILITY: YANKEE NUCLEAR POWER STATION TOPIC HO.

REVIEW STATUS REMARKS DIV/BR LICENSEE: YANKEE ATOMIC ELECTRIC II-1 A.

DE/SAB 7

HRC TO YAEC 07/13/82 REGION / LOCATION: 25 MILES HORTH EAST OF PITTSFIELD, MASS.

II-1 B.

DE/SAB 7

NRC T (E

07/13/82 DOCKET NO.

05000029 II-1 C.

DE/SAB 7

C AEC 07/13/82 POWER CAPACITY: 600(THERMAL) 165(ELECTRICAL)

II-2 A.

DSI/AE R

Y EC 08/03/81 OL NUMBER: DPR-3 II-2 B.

X HRC to YAEC 05/07/81 H.S.S.S.'

WEST.

II-D I/A 7

NRC~to YAEC 09/04/81 A/E FIRM: 58W M

L II-2 X

HRC to YAEC 05/07/81 hg gII)$A.

DE/HGEB 7

NRC TO YAEC 09/30/82 SYSTEMATIC EVALUATION PROGRAM BRANCH CHIEF: W.

RUS L

l II-3 B.

HGEB 7

NRC TO YAEC 09/30/82 OPERATING REACTORS BRANCH CHIEF: D. CRUTC D

OPERATING REACTORS PROJECT MANAGER:

J. L NS I

. 1 D /yGEB 7

NRC TO YAEC 09/30/82 INTEGRATED ASSESSMENT E

ACE-M.

O E fi II DE/HGEB 7

NRC TO YAEC 09/30/82

\\

TJ #'

DE/

7 NRC to YAEC 07/15/82 MY GR S TUI ES J

l II-4 A.

D 7

NRC to YAEC 06/08/81 l

N'~

G G

'b 4a-DRAFT SE CEI 4B GSB 7

NRC TO YAEC 07/15/82 FROM REVIE B NCH X-TED DE/GSB 7

HRC to YAEC 06/08/81 4b-SAR RECEIVED FROM r

0 - TOPIC HOT LICENSEE II-4 D.

DE/HGEB 7

HRC TO YAEC 09/02/82 STARTED S - DRAFT E SENV 4 II-4 E.

DE/HGEB 7

NRC TO YAEC 01/27/83 1 - QUESTIONS RECEIVED TD I

y FROM REVIEW BRANCH l

II-4 F.

DE/HGEB 7

HRC TO YAEC 09/16/82 6-S R

RECEIVED 2 - QUESTIONS SENT B N III-1 DL'/SEPB 7(Elec) HRC to YAEC 09/14/82 TO UTILITY DL/SEPB 7(SYS)

HRC TO YAEC Gi/18/82 7 - TOPIC COMPLETE 3 - QUESTION RESPONSE III-2 DL/SEPB 7

NRC TO YAEC 08/31/82 RECEIVED BY HRC (2-39)

YANKEE TOPIC HO.

RLtf1EW STAIUS REMARKS TOPIC HO.

REVIEW STATUS REMARKS DIV/BR DIV/BR III-5 A.

DE/S EB 7

NRC 10 YAEC 10/13/82 111-10 B.

X NRC to YAEC 31/16/79 III-3 B.

X NRC to YAEC 12/26/80 III-te C.

X HRC to YAEC 11/16/79 III-3 C.

DE/NGEB 7

NRC TO YAEC 10/04/82 III-11 X

HRC to YAEC 05/07/88 III-4 A.

DSI/ASB 7

NRC TO YAEC 08/31/82 III-12 X

NRC to YAEC 55/07/81 III-4 B.

DE/MTER 7

HRC to YAEC 02/08/82 IV-1 A.

DL/SEPB 7

NRC to YAEC 04/18/79 III-4 C.

DSI/ASB 7

HRC TO YAEC 09/29/82 IV-2 DSI/ICSB 7

MRC to YAEC 12/23'88 III-4 D.

DE/SAB 7

NRC TO YAEC 07/13/82 IV-3 X

HRC to YAEC 05/07/81 III-5 A.

DL/SEPB 7

NRC TO YAEC 08/20/82 V-1 X

NRC to YAEC 11/27/81 III-5 B.

DL/SEPB 7

HRC TO YAEC 06/29/82 V-2 X

NRC to YAEC 11/16/81 III-6 DL/SEPB 7

NRC TO YAEC 02/01/83 V-3 X

HRC to YAEC 05/07/88 l

III-7 A.

X HRC to YAEC 05/07/81 V-4 X

HRC to YAEC 05/07/81 III-7 8.

DL/SEPB 7

HRC TO YAEC 01/27/83 V-5 DL/SEPB 7

NRC TO YAEC 07/13/82 III-7 C.

X NRC to YAEC 11/16/79 V-6 DL/SEPB 7

hRC to YAEC 03/05/80 l

l III-7 D.

DE/SEB 7

NRC TO YAEC 03/18/82 V-7 X

HRC to YAEC 12/14/81 III-8 A.

DSI 7

NRC to YAEC 12/29/81 V-8 X

NRC to YAEC 05/07/81 III-8 8.

X NRC to YAEC 10/01/80 V-9 X

MRC to YAEC 11/16/79 III-8 C.

DL/SEPB 7

MRC to YAEC 11/15/79 V-10 A.

DL/SEPB 7

NRC to YAEC 11/05/79 III-8 D.

X NRC to YAEC 05/07/81 V-10 B.

DL/SEPB 7

NRC to YAEC 02/01/82 III-9 X

HRC to YAEC 05/07/81 V-11 A.

DL/SEPB 7

NRC to YAEC 07/27/82 III-10 A.

DL/SEPB 7

HRC to YAEC 09/22/81 V-11 B.

UL/SEPB 7(Sys)

NRC to YAEC 02/01/82 DL/SEPB 7(Elec) HRC to YAEC 07/27/82 (2-40)

YANKEE TOPIC HO.

REVIEW STATUS REMARKS TOPIC NO.

REVIEW STATUS REMARKS DIV/BR DIV/BR V-12 A.

X NRC to YAEC 11/16/79 VI-7 D.

DL/SEPB 7

NRC to YAEC 08/17/78 V-13 X

HRC to YAEC 05/07/81 VI-7 E.

X HRC to YAEC 05/07/81 1

VI-1 DE/CEB 7

NRC TO 'lAEC 01/27/83 VI-7 F.

DL/SEPB 7

HRC tc YAEC 08/28/81 VI-2 A.

X HRC to YAEC 05/07/81 VI-8 X

NRC to YAEC 05/07/81 VI-2 B.

X NRC to YAEC 05/07/81 VI-9 X

HRC to YAEC 11/16/79 VI-2 C.

X NRC to YAEC 11/16/79 VI-10 A.

DL/SEPB 7

HRC to YAEC 06/10/82 VI-2 D.

DSI/CSB 7

NRC TO YAEC 08/20/82 VI-10 B.

X HRC to YAEC 11/16/79 VI-3 DSI/CSB 7

HRC TO YAEC 08/20/82 VII-1 A.

DL/SEPB 7

NRC to YAEC 02/22/82 VI-4 DSI/CSB 7(SYS)

HRC TO YAEC 11/24/82 VII-1 B.

DL/SEPB 7

NRC to YAEC 08/17/78 DL/SEPB 7(Elec) HRC to YAEC 03/05/82 VII-2 DL/SEPB 7

HRC to YAEC 02/01/82 VI-5 X

NRC to YAEC 05/07/81 VII-3 DL/SEPB 7(Sys)

HRC to YAEC 02/01/82 VI-6 DSI/CSB 7

HRC TO YAEC 09/02/82 DL/SEPB 7(Elec) HRC to YAEC 09/14/82 VI-7 A.

1.

DL/SEPB 7

HRC to YAEC 02/20/81 VII-4 X

NRC to YAEC 05/07/81 l

l VI-7 A, 2.

X NRC to YAEC 05/07/81 VII-5 X

NRC to YAEC 05/07/81 l

VI-7 A.

3.

DL/SEPB 7

HRC to YAEC 02/08/82 VII-6 DL/SEPB 7

HRC to YAEC 08/28/81 VI-7 A.

4.

X HRC to YAEC 05/07/81 VII-7 X

NRC to YAEC 11/16/79 VI-7 B.

DSI/RSE 7(Elec) NRC to YAEC 06/04/81 VIII-1 A.

DSI/PSB 7

NRC TO YAEC 11/02/82 7(SYS)

HRC TO YAEC 07/13/82 VI-7 C.

DL/SEPB 7

NRC to YAEC 03/13/81 VIII-2 DL/SEPB 7

NRC to YAEC 09/03/81 l

VI-7 C.

1.

DL/SEPB 7

4RC to YAEC 09/04/82 VIII-3 A.

DL/SEPB 7

NRC to YAEC 11/07/79 VI-7 C. 2.

DL/SEPB 7

HRC to YAEC 03/13/81 VIII-3 B.

DL/SEPB 7

NRC to YAEC 08/28/81 VI-7 C.

3.

DL/SEPB 7

NRC to YAEC 07/24/80 VIII-4 DL/SEPS 7

NRC TO YAEC 08/13/82 l

(2-41)

YANKEE TOPIC NO.

REVIEW STATUS REMARKS TOPIC HO.

REVIEW STATUS R EMARKS DIV/BR DIV/BR IX-1 DSI/ASB

)

HRC TO YAEC 09/16/82 XV-10 DSI/RSB 7

NRC TO YAEC 04/26/82 IX-2 X

HRC to YAEC 05/07/81 XY-11 X

NRC to YAEC 10/01/80 IX-3 DL/SEPB 7

NRC TO YAEC 06/11/82 XV-12 DSI/CPB 7(SYS)

NRC TO YAEC 04/16/82 DSI/AEB 7(Doses) HRC to YAEC 12/29/81 IX-4 DSI/RSB 7

NRC TO YAEC 06/15/82 XV-13 X

NRC to YAEC 11/16/79 IX-5 DL/SEPB 7

NRC TO YAEC 06/14/82 XV-14 DSI/RSB 7

NRC TO YAEC 07/14/82 IX-6 DE 7

NRC TO YAEC 01/27/83 XV-15 DSI/RSB 7

HRC TO YAEC 05/10/82 X

X NRC to YAEC 05/07/81 XV-16 DSI/AEB 7

NRC TO YAEC 08/31/82 XI-1 X

HRC to YAEC 12/04/81 XV-17 DSI/RSB 7(SYS)

HRC TO YAEC 08/31/82 XI-2 X

NRC to YAEC 12/04/81 DSI/AEB 7(DOSES) NRC TO YAEC 03/30/82 XIII-1 X

NRC to YAEC 05/07/81 XV-18 X

NRC to YAEC 10/01/80 XIII-2 DL/SSPB 7

NRC to YAEC 08/31/82 XV-19 DSI/RSB 7(SYS)

HRC TO YAEC 07/t3/82 DSI/AEB 7(DOSES) NRC TO YAEC 09/01/82 XV-1 DSI/RSB 7

NRC TO YAEC 07/19/82 XV-23 DL/SEPB 7

HRC to YAEC 09/06/81 XV-2 DSI/RSB 7(SYS)

NRC TO YAEC 07/13/82 DSI/AEB 7(DOSES) HRC TO YAEC 01/27/83 XV-21 X

HRC to YAEC 05/07/81 XV-3 DSI/RSB 7

HRC to YAEC 01/25/82 XV-22 X

NRC to YAEC 05/07/81 XV-4 DSI/RSB 7

NRC TO YAEC 07/21/82 XV-23 X

NRC to YAEC 05/07/81 XV-5 DSI/RSB 7

NRC to YAEC 02/10/82 XV-24 X

NRC to YAEC 05/07/81 XV-6 DSI/RSB 7

NRC TO YAEC 07/13/82 XVI X

NRC to YAEC 11/05/80 XV-7 DSI/RSB 7

NRC TO YAEC 06/29/82 XVII DL 7

NRC to YAEC 11/20/79 XV-8 DSI/CPB 7

HRC TO YAEC 03/05/82 XV-9 DSI/RSB 7

NRC TO YAEC 06/25/82 e

l l

l l

(2-42)

A F4 l

f a

m M

C m

(lJ LaJ M

PALISADES ISSUES REQUIRING REFINED EN3IPdERING ANALYSIS OR CONTINUATION OF ONGOIN3 EVALUATIO3 F;0M NURE2-0820 (FINAL) INTEG;ATED PLANT SAFETY ASSESSMENT DATE: OCTOBER 1982 IPSAR SEP LICENSEE SER SECTION TOPIC TAC REVIEW SUBMITTAL SER ISSUE NUMBER l/

TITLE REFERENCE NO.

BRANCH SCHEDULE Z/

IMPUT J/

DATE 1/

4.2 II-3.B 4.3 II-3.B.1 4.4 FLOODING ISSUES II-3.C 48722 HGEB 03/23/82C 13/04/82C 10/07/82C 4.5 CLASSIFICATION OF STRUCTURES, COMPONENTS AND III-1 48723 SEPB 08/16/82C 06/30/83 SYSTEMS (SEISMIC AND QUALITY) 4.9 EFFECTS OF PIPE BREAKS ON STRUCTURES, SYSTEMS, AND III-5.A 48724 NEB 12/09/82C 04/22/83C 06/30/83 COMPONENTS INSIDE CONTAINMENT.

4.10(t)

SEISMIC COMPONENT EVALUATIONS III-6 48725 SEPB 10/13/82C 06/30/83 4.10(2)

Ot/18/83C 4.12 DESIGN CODES, DESIGN CRITERIA, LOAD CCNFIGURATIONS III-7.B 48726 SEPB 02/28/83P 06/30/83 07/30/83 AND REACTOR CAVITY DESIGN CRITERIA.

4.26 ELECTRICAL PENETRATIONS OF REACTOR CONTAINMENT.

VIII-4 48727 SEPB 02/tt/83P 06/30/83 4.27.1 COOLING OF CCW HEAT EXCHANGER IX-3 48728 SEPB 01/06/83C 05/20/83C 05/31/83C 4.28.1 VENTILATION SYSTFMS IX-5 48729 SEPB 11/01/82C 05/31/83C 06/30/83 4.28.2 1/ REFERS TO INTEGRATED PLANT SAFETY ASSESSMENT REPORT (NUREG-0820). TABLE 4-1 Z/ LICENSEE ANALYSIS OR EVALUATION SUBMITTAL COMMITMENT DATE - WHEN FOLLOWED BY P INDICATES PARTIAL SUBMITTAL, WHEN FOLLOWED BY A C INDICATES COMPLETE SUBMITTAL, AND WHEN FOLLOWED BY A T INDICATES TARGET DATE FOR SUBMITTAL.

J/ STAFF SAFETY EVALUATION REPORT - SCHEDULED OR COMPLETE - COMPLETE WHEN FOLLOWED BY A C 4/ ISSUANCE TO LICENSEE OF STAFF SAFETY EVALUATION REPORT - SCHEDJLED OR COMPLETE - COMPLETE WHEN FOLLOWED BY A C I

1 I

l 3-2

IPSAR SUPPLEMENT STATUS PALISADES TACS 10 LIC. RESP. REC'D g__

SER INPUT REC'D 8--

SER ISSUED 7__

l

=

s l

GDAL 6--

r-l 5--

l -

/

l 4~~

l

/,I 3

-l ll s' /

2~~

j,

,/

y, /

1

)

l 1

t' t

I I

I I

I I

i 1

I I

I I

g DEC JAN FEB HAR APR HAY JUN JUL AUG SEP CCI NOV DEC JAN FEB HAR APR i

LIC RESP PEC'D 3

3 5

5 6

6 SER INP'JT REC'D 1

1 1

1 2

4 SER ISSUED 1

1 1

1 1

2 WE O

8 0

1 3

3 7

8 i

s x

f l

G-3)

GINNA ISSUES REQUIRING REFINED ENGINEERING ANALYSIS OR CONTINUATION OF ONGOING EVALUATION FROM MU2EG-0221 (FINAL) INTEGRATED PLANT SAFETY ASSESSMENT DATE: DECEMBER 1982 IPSAR SEP LICENSEE SER SECTION TOPIC TAC REVIEW SUBMITTAL SER ISSUE NUMBER l/

TITLE REFERENCE NO.

BRANCH SCHEDULE 2/

INPUT-J/

DATE 4/

4.3 II-3.B 4.4 II-3.B.1 4.5 FLOODING OF DEER CREEK II-3.C 48882 HEGB 05/20/83C 06/30/83 07/30/83 4.9.2 III-3.A 4.7 CLASSIFICATION OF STRUCTURES, COMPONENTS, AND III-1 48883 SEPB 01/24/83C 05/30/83 06/30/83 SYSTEMS (SEISMIC AND QUALITY) 4.8 STRUCTURAL UPGRADE PROGRAM III-2 48881 SEPB 04/22/83P 06/15/83T 06/30/83 07/15/83 l

4.11.2 III-4.A 04/22/83P 4.17 III-7.B 04/22/83P 4.13.2 PIPE BREAK INSIDE CONTAINMENT III-5.A 48887 SEPB 04/22/83C 06/30/83 07/15/83 4.13.3 4.14 PIPE BREAK OUTSIDE CONTAINMENT III-5.B 48888 SEPB 03/22/83C 04/21/83C 04/21/83C 4.15.4 SEISMIC COMPONENT EVALUATION III-6 48889 SEPB 04/11/83P 06/15/83T 06/30/83 06/30/83 4.15.5 4.15.6 4.15.7 4.17.1 CONTAINMENT LINER INSULATION III-7.8 48890 SEPB 04/28/83C 06/30/83 07/15/83 4.25.3 FLOODING DUE TO FAILURE OF TANKS IX-3 48896 SEPB 04/11/83P 06/15/83T 06/30/83 07/15/83 J/ REFERS TO INTEGRATED PLANT SAFETY ASSESSMENI REPORT (NUREG-0821), TABLE 4-1 LICENSEE ANALYSIS OR EVALUATION SUBMITTAL COMMITMENT DATE - WHEN FOLLOWED BY P INDICATES PARTIAL SUBMITTAL, WHEN Z/

FOLLOWED BY A C INDICATES COMPLETE SUBMITTAL, AND WHEN FOLLOWED BY A T INDICATES TARGET DATE FOR SUBMITTAL.

J/ STAFF SAFETY EVALUATION REPORT - ?CHEDULED OR COMPLETE - COMPLETE WHEN FOLLOWED BY A C i/ ISSUANCE TO LICENSEE OF STAFF SAFETY EVALUATION REPORT - SCHEDULED OR COMPLETE - COMPLETE WHEN FOLLOWED BY A C 3-4

IPSAR SUPPLEMENT STATUS GINNA TACS la

. _ __. _' D LIC. RESP. REC g__

SER INPUT REC'D 8--

SER ISSUED 7__

8 l

l 1

1 GOAL 6--

/

(

5--

/

l

/

l 4--

l

/

l 3 ---

j l

2--

/

l

/

l I

/

/

~I/

i i

V v

i i

i i

i i

i i

i i

i g

DEC JAN FEB HAR APR HAY JUN JUL AUG SEP OCT NOV DEC JAN FEB MAR APR LIC RESP REC'D 0

1 1

2 4

5 SER INPUT REC'D 0

0 0

0 1

1 SER ISSUED 0

0 0

0 1

1 GOAL 0

0 0,0 0

1 3

8 l

(3-5) l l

OYSTER CREEK ISSUES REQUIRING REFINED ENGINEERING ANALYSIS OR CONTINUATION OF OMIDING EVALUATION FROM NUPEG-0822 (FINAL) INTEGIATED PLANT SAFETY ASSESSMENT DATE: JANUARY 1983 IPSAR SEP LICENSEE SER SECTION TOPIC TAC REVIEW SUBMITTAL SER ISSUE HUMBER 1/

TITLE REFERENCE HO.

BRANCH SCHEDULE 2/

INPUT 1/

DATE 1/

4.1(7)

FLOODING EVALUATION II-3.C 49591 SEPB 04/30/83 06/30/837 07/30/83 08/30/83 4.3.1 WIND AND TORNADO LOADINGS III-2 49392 SEPB 02/02/83P 06/30/83T 07/30/83 08/30/83 02/02/83P 06/30/83T 07/30/53 08/30/83 4.3.2 06/30/83P 06/30/837 07/30/83 08/30/83 4.3.3 02/02/83P 06/30/83T 07/30/83 08/30/83 4.3.6 02/02/83P 06/30/83T 07/30/83 08/30/83 4.3.7 4.4(2)

HYDROSTATIC LOADS (SHORT-DURATIDH)

III-3.A 49393 SEPB 04/30/83 06/30/83T 07/30/83 08/30/83 4.6.1 TORHADO MISSILE PROTECTION III-4.A 49394 SEPB 06/30/83T 07/30/83 08/30/83 06/30/83T 07/30/83 08/30/83 4.6.2 06/30/83T 07/30/83 08/30/83 4.6.4 4.7 TURBINE MISSILES III-4.B 49395 SEPB 07/30/83T 08/30/83 09/30/83 4.8.2 AIRCRAFT HAZARDS III-4.D 49396 SAB 03/04/83C 04/26/83C 05/03/83C 4.10(2)

EMERGENCY CONDENSER ISOLATION III-5.B 49397 SEPB 06/30/83T 07/30/83 08/30/83 4.11(1)

SEISMIC DESIGN III-6 49398 SEPB 12/31/83T 01/31/84 02/28/84 12/31/83T 01/31/84 02/28/84 4.ft(2) 12/31/83T 01/31/84 02/28/84 4.11(3) 12/31/83T 01/31/84 02/28/84 4.1 t ( 5) 4.12 DESIGN CODES, DESIGH CRI1ERIA, LDAD COMBINATION III-7.B 49399 SEPB 06/30/83 11/30/83T 12/30/63 01/30/84 4.14(1)

THERMAL OVERLOAD BYPASS III-10.A 49400 SEPB 12/31/83T 01/31/84 02/28/84 4.16.1 LEAKAGE DETECTION V-5 49401 SEPB 06/30/83T 07/30/83 08/30/83 4.16.2 12/31/83T 01/31/84 02/28/84

4. 17 REACTOR VESSEL INTEGRITY V-6 49402 SEPB 03/10/83C 04/28/83C 04/28/83C 1

1 4.19 ISOLATION OF HIGH AHD LOW PRESURE SYSTEMS V-11.A 49403 SEPB 06/30/83T 07/30/83 08/30/83 4.20 WATER PURITY OF PWR PRIMARY COOLANT V-12.A 49404 SEPB 12/31/83T 01/31/84 02/28/84 4.23 EMERGENCY CORE COOLING SYSTEM ACTIVATION VI-7.A.3 49405 SEPB 12/31/83T 01/31/84 02/28/84 4.25(1)

AUTOMATIC BUS TRANSFERS VI-7.C.t 49406 SEPB 06/30/83T 07/30/83 08/30/83 4.26.2 REACTOR TRIP SYSTEM (RTS) TESTING VI-12.A 49407 SEPB 12/31/83T 01/31/84 02/28/84 4.27(1)

REACTOR PROTECTION SYSTEM IS0tATION VII-1.A 49408 SEPB 07/31/83T 08/31/83 09/30/83 4.31 ONSITE EMERGENCY POWER SYSTEMS (DIESEL GENERATOR)

VIII-2 49409 SEPB 07/15/83T 08/15/83 09/15/83

{

3-6

OYSTER CREEK (CONT.)

IPSAR SEP LICENSEE SER SECTION TOPIC TAC REVIEW SUBMITTAL SER ISSUE NUMBER 1/

TITLE REFERENCE NO.

BRANCH SCHEDULE 2/

INPUT 1/

DATE 1/

l 4.32 DC POWER SYSTEM BUS VOLTAGE MONITORING AND VIII-3.B 494TO SEPB 11/16/82P 08/SO/83T 09/30/83 10/30/83 1

ANNUNCIATION 4.34(3) VENTILATION SYSTEMS IX-5 49411 SEPB 06/30/837 07/30/83 08/30/83 4.34(4) 12/31/83T 01/31/84 02/28/84 4.36 PRIMARY COOLANT ACTIVITY T.S.

XV-16 49412 SEPB 12/31/83 01/31/84 02/28/84 4.38 MSIV LEAKAGE XV-19 49413 SEPB 12/31/83 01/31/84 02/28/84 l

1/ REFERS TO I'4TEG'tATED PL ANT SAFETY ASSESSMENT REPORT (NUREG-0822), TABLE 4-1 R/ LICENSEE ANALYSIS OR EVALUATION SUBMITTAL COMMITMENT DATE - WHEN FOLLOWED BY P INDICATES PARTIAL SUBMITTAL, WHEN FOLLOWED BY A C INDICATES COMPLETE SUBMITTAL, AND WHEN FOLLOWED BY A T INDICATES TARGET DATE FOR SUBMITTAL.

1/ STAFF SAFETY EVALUATIDH REPORT - SCHEDULED OR COMPLETE - COMPLETE WHEN FOLLOWED BY A C i/ ISSUANCE TO LICENSEE OF STAFF SAFETY EVALUATION REPORT - SCHEDULED OR COMPLETE - COMPLEIE WHEN FOLLOWED BY A C 3-7

IPSAR SUPPLEMENT STATUS OYSTER CREEK TACS 25 LIC. RESP. REC'D SER INPUT REC'D l

20 --

ll SER ISSUCD

/

GDAL 15 --

j

/ -----.-------

.e f

/

la --

j l

ll 5--

ll i

v i

i i

i i

i i

i i

i g

DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC' JAN FEB MAR APR i

LIC RESP REC'D 0

0 0

2 2

2 SER INPUT REC'D 0

0 0

0 2

2 SER ISSUED 8

0 0

0 1

2 G0AL 0

0 0

0 1

2 2

2 10 13 14 14 14 14 23 G-8)

DRELDEN 2 ISSUES REQUIRING REFINED ENGINEERING ANALYSIS OR CONTINUATION OF ONGOING EVALUATION FROM HUREG-0823 (FINAL) INTEGRATED PLANT SAFETY ASSESSMENT DATE: FEBRUARY 1983 IPSAR SEP LICENSEE SER SECTION TOPIC TAC REVIEW SUBMITTAL SER ISSUE NUMBER 1/

TITLE REFERENCE NO.

BRANCH SCHEDULE Z/

INPUT J/

DATE 1/

4.3.2 WIND AND TORNADO LOADING III-2 49363 SEPB 02/09/83P 07/30/83 4.3.3 ft/22/82P 07/30/83 4.3.4 11/22/82P 07/30/83 4.5.3 III-4.A 02/03/83P 07/30/83 4.5.4 02/03/83P 07/30/83 4.6 TURBINE MISSILES III-4.5 49362 MTEB 10/08/82C 05/23/83C 4.7.1 PIPE BREAK INSIDE COHTAINMENT III-5.A 49364 MEB 11/17/82P Ot/10/83C 02/09/83C 4.7.2 11/17/82C 02/09/83C 6.7.3 11/17/82C 06/30/83 4.7.4 11/17/82P 06/01/83T 06/30/83 4.9.2 SEISMIC DESIGN III-6 49365 SEPB 06/01/83T 07/01/83 1

4.9.3 4.10 DESIGH CODES, DESIGH CRITERIA, LOAD COMBINATIONS III-7.B 49361 SEPB 08/02/82C 08/15/83 4.12.1 THERMAL OVERLOADS III-10.A 49366 SEPB 04/29/83 06/30/83T 07/3C/83 4.13.1 LEAKAGE DETECTION V-5 49367 SEPB 07/30/83 4.13.2 4.21.1 EISC REREVIEWS VI-7.C.1 49368 SEPB 04/29/83 06/30/83T 07/30/83 4.21.4 05/30/83 06/30/83T 07/30/83 4.21.5 04/29/83 06/30/83T 07/30/83 4.23.1 VI-10.8 05/30/83 06/30/83T 07/30/83 6.24.1 REACTOR PROTECTION SYSTEM ISOLATION

%II-1.A 49369 SEPB 04/22/83 06/30/83T 07/30/83 4.24.2 05/30/83 06/30/83T 07/30/83 4.31 PRIMARY COOLANT ACTIVITY T.S.

)V-16 49370 SEPB 06/01/83 07/01/83 4.32 DV-18 06/01/83 07/01/83 1/ REFERS TO INTEGRATED PLANT SAFETY ASSESSMENT REPORT (HUREG-0823), TABLE 4-1 Z/ LICENSEE ANALYSIS OR EVALUATION SUBMITTAL COMMITMENT DATE - WHEN FOLLOWED BY P INDICATES PARTIAL SUBMITTAL, WHEN FOLLOWED BY A C INDICATES COMPLETE SUBMITTAL, AND WHEH FOLLOWED BY A T INDICATES TARGET DATE FOR SUBMITTAL.

2/ STAFF SAFETY EVALUATIDH REPORT - SCHEDULED OR COMPLETE - COMPLETE WHEN FOLLOWED BY A C i/ ISSUANCE TO LICENSEE OF STAFF SAFETY EVALUATION REPORT - SCHEDULED CR COMPLETE - COMPLETE WHEN FOLLOWED BY A C 3-9

IPSAR SUPPLEMENT STATUS DRESDEf1 2 12 Lic. RESP. REC'D 11 -

SER IW UT REC'D 10 --

g__

SER ISSUED l

8--

l WL 7--

l l

6-l S--

l 4--

l 3--

l l

2-1--

<[1.- ',

DEC JAN FEB MAR APR MAY JUN Jll AUG SEP OCT NDV DEC JAN FEB MAR APR LIC RESP REC'D 2

2 2

2 2

2 SER INPUT REC'D 0

0 0

0 0

1 SER ISSUED ' 0 0

0 0

0 1

a GDAL 0

0 0

0 0

0 1

3 9

10 G-10)

MILLSTONE 1 ISSUES REQUIRING REFINED ENGINEERING ANALYSIS OR CONTINUATION OF OHGOING EVALUATION FROM HUREG-0824 (DRAFT) INTEGRATED PLANT SAFETY ASSESSMENT DATE: NOVEMBER 1982 IPSAR SEP LICENSEE SER SECTION TOPIC TAC REVIEW SUBMITTAL SER ISSUE NUMBER l/

TITLE REFERENCE HO.

BRANCH SCHEDULE 2/

IHPUT J/

DATE 1/

4.1.1 INTEGRATED STRUCTURAL ANALYSIS II-3.A B 49376 SEPB 10/31/83 12/31/83 01/31/84 l

4.1.7 1

4.2.1 II-4.F 10/31/83 1

4.2.2 10/31/83 l

4.2.3 10/31/83 4.4.1 III-2 10/31/83 4.4.2 12/03/82P 4.4.3 10/31/83 4.4.4 10/31/83 4.4.5 10/31/83 4.4.6 10/31/83 4.5.1 III-3.A 10/31/83 4.5.2 10/31/83 4.6.1 III-3.C 10/31/83 4.11.1 III-6 10/31/83 4.12 III-7.B 10/31/83 4.7 MISSILES III-4.A 49377 SEPB 04/30/83 08/30/83T 09/30/83 10/15/83 4.8 III-4.8 04/30/83 06/30/83T 4.9.1 PIPE BREAKS III-5'.A 49378 MEB 04/15/83C 06/30/83 07/15/83 4.9.2 04/15/83C 4.9.3 04/tS/83C 4.10.2 III-5.B 03/24/83C 4.16.1 V-5 04/15/83C 4.11.2 SEISMIC III-6 49379 SEPB 0 7/ 31/8 3C 08/30/83 09/30/83 4.11.6 04/01/83 08/30/83T 4.11.8 06/30/83 4.14 MOV INTERLOCKS III-10.A 49380 SEPB 01/31/83 08/30/83T 09/30/83 10/15/83 4.19.1 WATER CHEMISTRY V-12.A 49382 SEPB 06/16/83 07/15/83 07/30/83 4.20.3 CONTAIHMENT ISOLATION VI-4 49383 SEPB 02/23/83C 07/30/83 08/30/83 4.20.7 03/31/83 06/30/83T 4.23.1 FAULT TRANSFERS VI-7.C.1 49384 SEPB 04/12/83P 07/30/83 08/30/83 4.23.2 04/12/83P 4.25.1 VII-1.A 01/31/83 06/30/83T 4.28.3 EMERGENCY POWER VIII-2 49387 SEPB 05/10/83P 07/15/83 07/30/83 4.29 VIII-3.A 06/16/83 4.30.1 VIII-3.B 12/27/82P 4.30.2 VIII-3.B 06/16/83 8

3-11

<V

MILLSTONE 1 (CONT.)

IPSAR SEP LICENSEE SER SECTION TOPIC TAC REVIEW SUBMITTAL SER ISSUE HUMBER 1/

TITLE REFERENCE NO.

BRANCH SCHEDULE 2/

INPUT 1/

DATE $/

4.32.1 VENTILATION SYSTEMS IX-S 49389 6EPB 04/18/83C 06/30/83 06/30/83 04/18/83C 4.32.2 04/18/83C 4.32.3 4.32.4 VI-7.A.3 04/18/83C l

4.21.1 4.35 ACTIVITY LIMITS XV-16 49390 SEPB 06/16/83 07/1S/83 07/30/85 4.36 XV-18 06/16/83 4.1.1 FLOODING (NON-STRUCTURAL)

II-3.A.B 49780 SEPB 01/31/83 09/30/83T 10/30/83 11/30/83 1/ REFERS TO INTEGRATED PLANT SAFETY ASSESSMENT REPORT (HUREG-0824). TABLE 4-1 g/ LICENSEE ANALYSIS OR EVALUATION SUBMITTAL COMMITMENT DATE - WHEN FOLLOWED BY P INDICATES PARTIAL SUBMITTAL, WHEN FOLLOWED BY A C INDICATES COMPLETE SUBNITTAL, AND WHEN FOLLOWED BY A T INDICATES TARGET DATE FOR SUBMITTAL.

J/ STAFF SAFETY EVALUATION REPORT - SCHEDULED OR COMPLETE - COMPLETE WHEN FOLLOWED BY A C i/ ISSUANCE TO LICENSEE OF STAFF SAFETY EVALUATION REPORT - SCHEDULED OR COMPL ETE - COMPLETE WHEN FOLLOWED BY A C 3-12

IPSAR SUPPLEMENT STATUS MILLSTONE 1 TACS 14 LIC. RESP. REC'D 13 --

12 (_-

SER INPUT REC'D _ SER ISSUED 10 -- 9-- G0AL 8_ 7-- 6-- l l 5-- l l 4-- 3-- / 2-- r-l 1-- / ~~ i i o i i'i i i i i i i i i i g DEC JAN FEB HAR APR 'MAY JUN JUL AUG SEP GCT NOV DEC JAN FEB HAR APR LIC RESP REC'D 0 0 0 0 2 2 1 SER INPUT REC'D 0 0 ~0 0 0 0 l l SER ISSUED 0 0 0 0 0 0 j 3 GOAL 0 0 0 0 0 0 1 l5 7 8 10 11 11 11 12 l (3-13)

m e aM 335 U.S NUCLEAR REGULATOAV COMMISSION 17 771 BIBLIOGRAPHIC DATA SHEEJ NUREG-0485 Vol. 5, No. 5 l

4. TITLE AND SUBTITLE (Aad Vokme No. desprea ml
2. (teere 6/ mas 1

3 RECtPIENT'S ACCESSION NO. Systematic Evaluation Program Status Summary Report

7. AUTHOR (Si
6. DATE REPORT COMPLE TED M om T H l YEAR aung 19Al
9. PERFORMING ORGANIZATION NAME AND M AILING ADDRESS (tactuar 1,0 Coors DATE REPORT ISSUED Office of Resource Management wo~T*

lvana Office of Nuclear Reactor Regulation June 1983 U.S. Nuclear Regulatory Commission s (tee e unans Washington, D.C. 20555 e (ten,e manno

12. SPONSORING ORGANIZ ATION NAME AND MAILING ADDRESS (factuar I,a coors o PROJE CTIT ASK/ WORK UNIT NO Office of Resource !!anagement
u. CONTR ACT NO Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Comission Washington, D.C.

20555

13. TYPE OF REPORT PE mico Cove mED (inesus,re anest May 1-31, 1983
15. SUPPLEMENTARY NOTES 14 (L '8"'

8* #

16. ABSTR ACT 200 woras'or sessJ The Systematic Evaluation Program is intended to examine many safety-related aspectc of 11 of the older light water reactors. This document provides the existing status of the review process including individual topic and overall Completion status.
17. KE Y WORDS AND DOCUMENT AN ALYSIS 17a DESCRIPTORS 170. IDE NTIFIE RS/OPEN ENDE D TE RMS
18. AV AILABILITY STATEMENT
19. SECURITY CLASS (TA,s reporrt 21 NO OF PAGES Unlimited Unclas si fied 20 C TV S Tos papri 22 PRICE 9eRC PORM339 17.77)