Proposed Tech Specs Revising Surveillance Test Requirements to Include Flow Test to Verify Normal Path Availability of Auxiliary Feedwater to Steam Generator
ML20076J251
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/15/1983
From:
TOLEDO EDISON CO.
To:
Shared Package
ML20076J250 List:
References
TAC-51964, NUDOCS 8306200394
Download: ML20076J251 (2)


Text

-

4

, l PLANT SYSTEMS ~

^

AUXILIARY FEEDWATER SYSTEM LIMITING CONDITION FOR OPERATION 3.7.1.2 Two independent steam generator auxiliary feedwater pumps and associated flow paths shall be OPERABLE.

, APPLICABILITY: MODES 1, 2 and 3.

ACTION:

a. With one auxiliary feedwater system inoperable, restore the inoperable system to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

f SURVEILLANCE REQUIREMENTS

4.7.1.2 Each auxiliary feedwater systgm shall be demonstrated OPERABLE:

w

a. At least once per 31 days on a STAGGERED TEST BASIS by:
1. Verifying that each steam turbine driven pump develops a i

differential pressure of > 1070 psid on recirculation _

flow when the secondary steam supply pressure is greater than 800 psia, as measured on PI SP 128 for pump 1-1 and PI SP 12A for pump 1-2.

2. Verifying that each valve (manual, power operated or automatic) in the flow path that is not locked, sealed or otherwise secured in position, is in its correct position.
b. At least once per 18 months, during :hutdown, by:

l' j 1. Verifying that each automatic valve in the flow path i

actuates to its correct position on an auxiliary feed-water actuation test signal.

2. Verifying that each pump starts automatica11y upon ADD cei fa

, iliar edwat tuation test signal.

3' feed w d*7 Pump Veri %gsham and -each thut'9en<ratov there kbyapumpiny flew Pa%

waterfmnbekeen the owildoch auMim;f ing fee ,

\

he. sitam geneyarof.1fe flew rath 4e k st.emn genevedor skati b( wrifieel by withey sfe.m genevrder level change cr auxiliava Feed water R.w Mc ign. .

Vavification of the d4xiUdry feed wafeY Sjfffrn'S flow cdf4C$h (5 M8 *#e 45Y4

  • OAVIS-BESSE, UNIT 4 7-4 ~

8306200394 830615 PDR ADDCK 05000346 P PDR

__y. - .- --.., ,,-y- - - , , ,- -- .,y .- _ , _ . _ , - _ _ - - . - , . , _ , , , - --w.-m - . - , . , ~ - , , , _ . .- -. - . ~ , - . - -..m.,.,...w .

- ADDITIONAL CHANGES PREVIOUSLY PROPOSED BY LETTER PLANT SYSTEMS Serial No. 131 Date 7 la il SURVEILLANCE REQUIREMENTS (Continued)

c. The Auxiliary Feed Pump Turbine Steam Generator Level Control System shall be demonstrated OPERABLE by perfomance of a CHANNEL CHECK at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, a CHANNEL FUNCTIONAL TEST at least once per 31. days, and a CHANNEL CALIBRATION at least once per 18 months.
d. The Auxiliary Feed Pump Turbine Speed Switch, Auxiliary Feed Pump Suction Pressure Interlocks, and Auxiliary Feed Pump Turbine Inlet Steam Pressure Interlocks shall be demonstrated OPERABLE by performance of a CHANNEL FUNCTIONAL TEST at least once per 31
  • days, and a CHANNEL CALIBRATION at least once per 18 .

f j e, rotlewin3 nny meebations n verairs to *ie ovilia -fe.e4 waif 7 S'ide") ,

-k anected flew Path short 6e. clemenrFra tect available. P"r *

  • n t* Yi"3 meae 3 or follow :
1. TF *e mea;fication or vePoir k down strearn of the %st flow line g aquiliavj herL Pumf shall Purnf wafa To M skdWi 9*nEW8Y C"E g f.iew path availabilit:j will be wrif}ct6f s h e S tnevu fev ISvcl

,, ,, ,,, coulag Secr watev flew '"4 cation

  • p line
1. Tp w meclificatiori <r r P A'r i k P s[,rgy' h, gh bit. auxiliard

" , p ADD ' %e test FAow line arid h fl*

  • P a A

= fj;{y. t wkl msdied by F'c " in dE' n O 'n k M ilsT * "'

\ ~ e.

i g.,;fi c awen of me. a4dliary Sted water I'35M b"'" " '

[g not nquir4d.

(

l

  • Eighteen-month surveillance test for AF Pump Speed Switch due in March 1982 delayed until March 31,, 1982.

l l

l l DAVIS-BESSE, UNIT 1 3/4 7-5 Amendment No. 43 I