ML20076E849

From kanterella
Jump to navigation Jump to search
Forwards Rev 2 to Inservice Insp Program,First Interval, Rev 5 to General Test Procedure for Inservice Testing of Pumps & Rev 5 to General Test Procedure for Inservice Testing of Valves
ML20076E849
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 05/23/1983
From: Dixon O
SOUTH CAROLINA ELECTRIC & GAS CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20076E851 List:
References
NUDOCS 8306010325
Download: ML20076E849 (3)


Text

SOUTH CAROLINA ELECTRIC & GAS COMPANY Po67 OFFsCE 764 COLUMBIA. SOUTH C AROLINA 29218 O. W. DixON. JR.

ViCa P.estorNY soca.. o,...r,0~. May 23, 1983

.i Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Virgil C. Summer Nuclear Station Docket No. 50/395 Operating License No. NPF-12 First Interval Inservice Inspection Program

Dear Mr. Denton:

South Carolina Electric and Gas Company- (SCE&G) , acting for itself and as agent for South Carolina Public Service Author-ity, hereby submits ten (10) copies of Revision 2 of the First Interval Inservice Inspection Program along with appropriate relief requests as noted in my letter dated January 27, 1983.

The following explanations are of fered for the change submitted:

1. First Interval Inservice Inspection Program, Revision 2, has been revised to conduct testing for pumps in accor-I dance with the requirements of 10CFR50.55 a(b)(2) and 50.55 a(g) ef fective September 1, 1982, and utilizes the ASME Code,Section XI, 1980 Edition through and including the Winter 1980 Addenda.
2. GTP-001, Revision 5, has been revised to conduct testing in accordance with ASME Code,Section XI, 1980 Edition through Winter 1980 Addenda.
3. The attached pages (1 through 13) describe the valve test changes to GTP-002, Revision 5.

Should there be any questions, please let us know.

Very truly yours, ifL ,

O. W. ixon .

RBJ:OWD/fjc Attachments l cc: See Page #2 I g 0 7

8306010325 5 (

1 PDR ADOCK 0 0 PDR

\ l

Mr. Ha rold R. Denton First Interval Inservice Inspection Program May 23, 1983 Page #2 1

V. C. Summer

~

cc:

T. C. Nichols, Jr./O. W. Dixon, Jr.

E. H. Crews, Jr.

E. C. Roberts H. N. Cyrus J. P. O'Reilly (With Attachment)

Group / General Managers O. S. Bradham R. B. Clary (With Attachment)

C. A. Price A. R. Koon (With Attachment)

C. L. Ligon (NSRC) (With Attachment)

G. J. Braddick (With Attachment)

J. C. Miller J. L. Skolds (With Attachment)

J. B. Knotts, Jr. (With Attachment)

NPCF File (Lic./Eng.) (With Attachment)

I w_ )

INSTRUCTION SHEET FOR REVISION TO THE INSERVICE INSPECTION PROGRAM REMOVE INSERT Inservice Inspection Program Inservice Inspection Program First Interval Revision 1 First Interval Revision 2 GTP-001, Revision 4 GTP-001, Revision 5 GTP-002, Revision 4 GTP-002, Revision 5


*GTP-002, Relief Requests NOTE: A blank vertical bar in the right hand column of each page '

indicates a change to the procedure.

  • Insert relief requests behind GTP-002.

-