ML20076E594
| ML20076E594 | |
| Person / Time | |
|---|---|
| Issue date: | 05/12/1983 |
| From: | Office of Nuclear Reactor Regulation |
| To: | |
| References | |
| NUREG-0800, NUREG-0800-R04-ERR, NUREG-800, NUREG-800-R4-ERR, SRP-NUREG-0800, SRP-NUREG-800, NUDOCS 8306010158 | |
| Download: ML20076E594 (2) | |
Text
\\
'o,,
UNITED STATES l
NUCLEAR REGULATORY COMMISSION
{
.k WASHINGTON, D. C. 20555
\\...../
May 12, 1983 ERRATA SHEET for NUREG-0800 Proposed Revision to Standard Review Plan, PSRP-6.2.2, Rev. 4 Containment Heat Removal Systems The attached cover page was inadvertently omitted from the report.
DIVISION OF TECHNICAL INFORMATION AND DOCUMENT CONTROL
- 88'abn!88osia 0800 R PDR L
f-
\\
o-4 120555078877 1 1ANIAI1151 US NRC ADM DIV CF TIDC POLICY C Ps:B MGT BR-PDR NUREG W-501 WASHIhGTCN CC 20555 l
l 1
I l
{
~.
i NUREG-0800 (Formerly NUREG 75/087)
["m
- p ***e %
\\
Ie, U.S. NUCLEAR REGULATORY COMMISSION Igv,oi STANDARD REVIEW PLAN k
8 OFFICE OF NUCLEAR REACTOR REGULATION eeee*
Proposed Revision to Standard Review Plan PSRP-6.2.2, Rev. 4 This proposed revision of the Standard Review Plan and its supporting value/ impact statement and associated technical documentaticn have not received a complete staff review and approval and do not represent an official NRC staff position. The pro-posed revision to the Standard Review Plan incorporates the resolution of generic issue USI A-43, "Containmen+. Emergency Sump Performance." Public comments are being solicited on the proposed SRP section, proposed Regulatory Guide 1.82 and their associated value/ impact analysis and technical support document NUREG-0897 (including any implementation schedules) prior to a final review and decision by the Office of Nuclear Reactor Regulation as to whether this proposed revision
'y should be approved. Comments should be sent to the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555, Attention: Docketing and Service Branch. All comments received byJuly 11,1983 will be considered, and all of the associtted documents and comments considered will be made publicly available prior to a decision by the Director, Office of Nuclear Reactor Regula-tion, on whether to implement this revision. Copies of each of these documents are available upon written request to the Division of Technical Information and Dceument Control, U.S. Nuclear Regulatory Cornission, Washington, D.C. 20555.
FOR COMMENT USNRC STANDARD REVIEW PLAN star dard review plans are prepared for the guidance of the Office of Nuclear Reactor Regulation staff responsible for the review of applications to construct and operate nuclear power plants. These documents are made available to the public as part of the Commission's policy to inform the nuclear industry and the general public of regulatory procedures and policies. Standard review A
plans are not substitutes for regulatory guides or the Commission's regulations and compliance with them is not required. The
[
\\
standard review plan sections are keyed to the standard Format and Content of Safety Analysis Reports for Nuclear Power Plants.
p\\j/
Not all sections of the Standard Format have a correspondmg review plan.
Published standard review plans will be revised periodically, as appropriate. to accommodate comments and to reflect new informa-tion and experience.
Comments and suggestions for improvement will be considered and should be sent to the U.S. Nuclear Regulatory Commission.
Office of Nuclear Reactor Regulation. Washington. O C. 20555.