ML20076D828

From kanterella
Jump to navigation Jump to search
Regulatory Licensing Status Summary Report.Data as of July 31,1983 (Blue Book)
ML20076D828
Person / Time
Issue date: 08/31/1983
From:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
To:
References
NUREG-0580, NUREG-0580-V12-N07, NUREG-580, NUREG-580-V12-N7, NUDOCS 8308230735
Download: ML20076D828 (64)


Text

,

NUREG-0580 Vol.12, No. 7 l

gc_

.-1 wn von l

REGULATORY LICENSING l

STATUS

SUMMARY

REPORT NUCLEAR POWER PLANTS l

DATA FOR DECISIONS

[ BLUE BOOK?

JULY 1 - JULY 31,1983 UNITED STATES NUCLEAR REGULATORY COMMISSION p* "%,

l

(

I

.::../

~

7 -j m:

y

, - ~

t e

f

~

P-y AVAILABLE FROM-NRC/GPO-SALES' PROGRAM-

-SUPERINTENDENT:0F DOCUMENTS

-GOVERNMENT PRIHTING OFFICE'

-NASHINGTON, D.'C.

20402 Y

A YEARS SUBSCRIPTION COISISTS'0F:12 ISSUES 4

.FOR THIS-PUBLICATION-MICROFICHE CF SINGLE COPIES ARE.

AVAILABLE FROM NRC/GPO.. SALES PROGRAM WASHINGTON, D. C.

20555-4.

r*

w E

~

NUREG-0580 t

Vol.12 No.7 Y

REGULATbRY LICENSING STATUS

SUMMARY

REPORT NUCLEAR POWER PLANTS DATA FOR DECISIONS (BLUE BOOK)

JULY 1 - JULY 31,1983

$ ate $u$$fshe["NE[u!t$E Prepared for: OFFICE OF NUCLEAR REACTOR REGULATION b.Y N GULA Y

M SSION WASHINGTON, D.C. 20555

  1. ~~%,

/

y I

\\i I l l

F0REWDRD THIS MANAGEMENT REPORT, REGULATORY LICENSING STATUS

SUMMARY

REPORT, IS DESIGNED TO PROVIDE THE NECESSARY INFORMATION FOR CONTROLLING THE PROGRESS OF REVIEW PROCESSES FOR CENTRAL STATION NUCLEAR REACTOR APPLICATIONS. IT UTILIZES DATA COLLECTED FROM THE OFFICE OF HUCLEAR REACTOR REGULATION, OFFICE OF THE EXECUTIVE LEGAL DIRECTOR, OFFICE OF INSPECTION 8 ENFORCEMENT, AND THE NATIDHAL LABORATORIES, AND ANALYZED BY THE OFFICE OF RESOURCE MANAGEMENT IN THE If1PLEMENTATION OF THE REGULATORY INFORMATION SYSTEM.

SECTIDH I 0F THIS EDITION CONSISTS OF THE THREE

SUMMARY

OF ACCOMPLISHMENTS, THE NEW APPLICATION FORECAST FOR OL'S AHD CP'S, AND AN ABBREVIATIDH KEY.

SECTION II REPRESENTS THE MAIN BODY OF THE REPORT AND CONSISTS OF THE FACILITY INFORMATION. ALL OL'S ARE LISTED FIRST, FOLLOWED BY CP'S, STANDARD DESIGN REVIEWS, OTHER REVIEWS, AND FINALLY, A MON-POWER REACTOR

SUMMARY

. EACH PROJECT CONSISTS OF GENERAL FACILITY DATA, CURRENT STATUS FOR ALL PHASES OF THE REVIEW,.4ND TARGETED AND ACTUAL COMPLETI0H DATES FOR ALL KEY MILESTONES IN THE REVIEW.

LICENSING 0F MUCLEAR REACT 0RS THE U.S. HUCLEAR RECULATORY COMMISSION REQUIRES TWO SEPARATE LICENSES - ONE TO BUILD THE FACILITY AND ANOTNER TO OPERATE IT.

LISTED BELOW ARE THE STEPS IN THE PROCESS OF OBTAINING A CONSTRUCTION PERMIT AND OPERATING LICENSE.

THE UTILITY SUBMITS A FORMAL APPLICATION DESCRIBING THE DESIGN, LOCATION, AND ENVIRONMENTAL IMPACT OF THE PROPOSED PLANT AND THE SAFEGUARDS TO BE PROVIDED. THE APPLICATION ALSO COVERS THE UTILITY'S FINANCIAL QUALIFICATI0HS.

THE HRC MAKES COPIES OF THE APPLICATION AVAILABLE TO THE ACRS AND TO THE PUBLIC DOCUMENT ROOM. TECHNICAL EXPERTS ANALYSE THE APPLICATION, AND PREPARE A SAFETY EVALUATION AND AN ENVIRONMENTAL IMPACT STATEMENT. THESE DOCUMENTS ARE ALSD MADE AVAILABLE IN THE PUBLIC DOCUMENT ROOM.

THE STAFF'S ANALYSIS IS SUBMITTED TO THE NRC'S STATUTORY ADVISORY COMMITTEE ON REACTOR SAFEGUARDS, A COMMITTEE OF INDEPENDENT EXPERTS. ACRS STUDIES THE APPLICATION IN DETAIL AND HOLDS CONFERENCES WITH THE APPLICANT, THE LICENSING STAFF AND OTHERS. THE ACRS FINDINGS ARF. REPORTED TO THE NRC AND MADE PUBLIC.

A PUBLIC HEARING IS HELD, USUALLY HEAR THE PROPCSED SITE, BY AN HRC APPOINTED ATOMIC SAFETY & LICENSING BOARD. PRIVATE CITIZENS, STATE AND LOCAL OFFICIALS, AND COMMUNITY GROUPS MAY PARTICIPATE.

AFTER REVIEWING THE HEARING RECORD INCLUDING THE NRC STAFF AND ACRS FINDINGS, THE BOARD DECIDES FOR OR AGAINST GRANTING A CONSTRUCTION PERMIT.

THE BOARD'S DECISION IS REVIEWED BY THE ATOMIC SAFETY AND LICENSING APPEAL BOARD, AND IS SUBJECT TO REVIEW BY THE FIVE-MEMBER NUCLEAR REGULATORY COMMISSION.

IF THE LICENSING BOARD AUTHORIZES THE ISSUANCE OF A CONSTRUCTION PERMIT, THE DIRECTOR OF THE DIVISIDH OF LICENSING WILL ISSUE A CONSTRUCTION PERMIT. AN EARLIER LIMITED WORK AUTHORIZATION TO DO PRELIMINARY SITE CONSTRUCTION MAY HAVE BEEN GRANTED IF THE SITE HAD BEEN DETERMINED TO BE SUITABLE BY THE HRC STAFF AND THE BOARD HAD RULED FAVORABLY ON THE ENVIRONMENTAL IMPACT ANALYSIS. CONSTRUCTION IS SUBJECT TO INSPECTIDH BY THE OFFICE OF INSPECTION AND ENFORCEMENT.

AS CONSTRUCTION PROGRESSES, ADDITIONAL INFORMATION IS DEVELOPED AND THE UTILITY APPLIES TO THE NRC FOR AN OPERATING LICENSE. THE SAME CAREFUL ANALYSIS AS IS MADE AT THE CONSTRUCTION PERMIT STAGE IS MADE BY THE HRC IN DECIDING WHETHER OR NOT TO ISSUE THE OPERATING LICENSE.

IN THE OPERATING LICENSE REVIEW PROCESS, OPPORTUNITY FOR HEARING IS PROVIDED. CONTRASTED WITH THE CONSTRUCTION PERMIT REVIEW PHASE, A HEARING IS HELD ONLY IF INTERVENTION IS GRANTED. FINAL ISSUANCE OF AN OPERATING PERMIT IS SUBJECT TO THE APPROVAL OF BOTH THE DIRECTOR OF THE DIVISIDH OF LICENSING AND OF THE COMMISSION.

\\

F

TABLE OF C0NTENTS PRINTED IN THE ORDER LISTED t_

I SECTION I

SUMMARY

OF ACCOMPLISHMENTS DL

SUMMARY

OF ACCOMPLISHMENTS CP

SUMMARY

OF ACCOMPLISHMENTS COMBINED NUMERICAL

SUMMARY

OF ACCOMPLISHMENTS TARGET DATES OF LICENSING STEPS FOR PLANTS SEEKING OPERATING LICENSES IN THE NEXT FIVE YEARS TARGET DATES OF LICENSING STEPS FOR PLANTS SEEKING CONSTRUCTION PERMITS IN THE NEXT FIVE YEARS NEW APPLICATION FORECAST:

OPERATING LICENSE REVIEWS SPECIAL REVIEWS COMMON ABBREVIATIONS USED WITHIN THE PUBLICATION SECTION II PROJECT INDEX OPERATING LICENSE REVIEWS CONSTRUCTION PERMIT REVIEWS STANDARD DESIGN REVIEWS OTHER REVIEWS HON-POWER REACTORS SECTION III EXAMPLE REVIEW

-M a

)

i a

Z O

N U

SU to L

0L

SUMMARY

0F ACC0MPLI$HMEN1S AS OF JULY 30, 1983 WBUJC FISCAL YEAR TO DATE FACILITY SCHEDULED ACTUAL FACILITY SCHEDULED ACTUAL 5 ER ' S SER ' S NOME CATAWBA 182 02/06/83 02/09/83C SEABROOK t82 01/12/83 03/07/83C QE R

' S 1SER

' S LASALLE 2 07/29/83 BYROM 1 82 12/10/82 01/31/83C CALLAWAY 1 06/08/83 06/28/83C CATAWBA 182 05/02/83 05/02/83C CLINTON I82 05/20/83 05/27/83C COMANCHE PEAK 1 82 03/tt/83C ENR100 FERMI 2 02/04/83C GRAND GULF 1 &2 05/31/83C LASALLE 2 07/29/83 MCGUIRE 1 82 02/14/83 02/28/83C MIDLAND 1 82 10/06/82 10/C6/82C PALO VERDE 1,2,3 03/15/83 03/15/83C PERRY 1 82 12/29/82 01/19/83C PERRY t 82 04/22/83 04/25/83C SEABROOK 1 82 03/07/83 06/30/83C SHOREHAM 01/15/83 02/04/83C ST LUCIE 2 04/06/83 04/06/83C SUMMER t 11/12/82 11/12/82C SUSQUEHANNA 1 03/01/83 SUSQUEHANNA 2 03/01/83 11/12/82C SUSQUEHANNA 2 03/31/83 03/29/83C WASHINGTON NUCLEAR 2 12/21/82 12/21/82C WASHINGTON NUCLEAR 2 05/20/83 05/20/83C WATERFORD 3 10/22/82 10/29/82C WATERFORD 3 02/28/83 06/30/83C WOLF CREEK 1 05/27/83 06/17/83C DES

'S DES ' S NDHE HARRIS 1 82 04/00/83 04/00/83C LIMERICK 182 06/24/83 06/24/83C FES 's FES ' S HONE CATAWBA 182 01/07/83 Ot/07/83C SEABROOK 1 82 12/08/82 12/08/82C

~

!l CCCC 3322 L

8888 A

////

U 7022 T

2111 C

////

A 5611 0011 D

E E

332 3 T

L 888 8 A

U

/// /

D D

702 0

E 211 0

O H

/// /

T C

561 5

S 001 - 0 R

A E

Y S

L A

T C

S N

I F

E M

D M

Y T

E H

I 2

1 L

U S

I A3 C

S 2 N ND I

A t

F S

E1AR L

EI HO I

RCREF P 3 IUEUR 8

ULMQE M 9 G MST 1

S CTUUA 0

MSSSW C

0 3

L C

Y 0

A L

U J

F F O

0 S

A Y

L R

A U

A T

C M

A M

U S

D E

L U

L D

E O

H C

S Y

L U

J u

D Y

T E

I L

U I

C S

A F

S I

R E

E W

N O

S O

P N

L L

L U

F O

M

}

1i

C CCC 3

332 L

8 888 A

/

///

U t

200 T

t 023 C

/

///

A 3

552 0

001 D

E E

3 332 T

L 8

888 A

U

/

///

D D

1 200 E

1 023 O

H

/

/ //

T C

3 551 S

8 c01 R

A E

Y L

A T

C S

N I

F 2

E 8

1 D

M Y

T D

E H

I R

L R

RRO U

I E

EEF C

V VVN S

I A

I IIA F

R RRH S

L

/

H S

HHT I

P 3 C

CCI 8

S N

NNG S

E S

E E

M 9

I IIA N

N N

1 L

R LLK O

O S

O 0

C CCS N

N N

R E

S S

C 0

3 E

S E

E P

C Y

S S

D F

C A L U

J F F O

0 S

A Y

L R

A U

A T

C M

A M

U S

D E

L U

P D

E C

H C

S Y

L U

J D

Y T

E I

L U

I C

S A

F S

S I

S E

E s

E S

E E

N H

N N

N O

R 0

O O

S O

N N

H N

N R

E S

S E

S E

E P

5 S

D F

C

lll L

A T2 1

3 3 2

0 2

0 4

0 U

C 2

A D

E L

EU TD2 1

2 3 2

0 2 0 4

0 AE 2

DH C

OS T

R A

E Y

M L

D D T

A C

E E

)

)

H S

I E

F

)

)

L P

)

)

)

)

U U M

L P

0 C L

P L

P S S H

0 C

(

(

0 C 0 C 5 S S

(

(

S S

(

(

(

(

I I

I S S S S S S 3

L 8

R R S S 9

R R E E S S S S P

1 E E S S E E E E L

P M

0 0

3 S S S S D D F F 0 C C Y L

C U J

A F

O F S L

A A

0 U

T0 0

0 0

0 0

0 0

0 0

C A

Y R

A N

M D

U E

L 5

U D0 0

1 0

0 0

0 0

0 0

E H

C S

MD D E E Y

)

)

L U

)

)

L P

)

)

)

)

U U J

L P

0 C L P L P S S 0 C

(

(

0 C 0 C S S

(

(

S S

(

(

(

(

I I

R S S S S S S EW R R S C O

P R R E E S S S S L

E E S S E E E E L P L

U

$ S S S D D F F 0 C F

M II1}l ll

,l ll

LICENSING SCHEDULES FOR ALL PENDING OL APPLICATIONS REPORT AS oft 07/30/83 (INCLUDES SCHEDULES FOR ADDITIONAL UNITS WITH PROJECTED CONSTRUCTION COMPLETION IN CY 1983-1984)

(LISTED IN ORDER OF FACILITY NAME)

SER SSER EST.

STAFF TECH STAFF TECH ASLB COMMu APPL.

DELAY ISSUE INPUT ISSUE ACRS ISSUE INPUT ISSUE START INITIAL DEC.

CONST.

PLANT (MONTHS) 211 TO DL 118 519 fil TO DL 11ER OF HRG DECISION DAlf COMPL.

BYRON 1 0

11/81C 01/82C 02/82C 03/82C 04/82C 08/82C D1/83C 03/83C 11/83 11/83 12/83 CALLAWAY 1 0

09/81C 09/81C 10/81C 11/81C 01/82C 01/82C 06/83C 11/81C 10/83 03/84 04/84 CATAWBA 1 0

08/82C 01/83C 02/83C 03/83C 01/83C 04/83C 05/83C 10/83 05/84 05/84 05/84 COMANCHE PEAK 1 0

05/81C 07/81C 07/81C 11/81C 09/81C 10/83 11/83 12/81C 11/83 11/83 12/83 COMANCHE PEAK 2 0

05/81C 07/81C 07/81C 11/81C 09/81C 10/83 11/84 12/81C 11/83 11/84 12/84 DIABLO CANYON 1 0

12/72C 01/75C 10/74C 07/76C 05/76C 06/83C 08/83 12/76C N/S 09/83 DIABLO CANYON 2 0

12/72C 01/75C 10/74C 07/76C 05/76C 06/83C N/S 12/76C N/S 08/83 ENRICO FERMI 2 0

04/81C 05/77C 09/77C 08/81C 09/81C 01/83C 02/83C 03/82C 10/820 11/83 12/83 GRAND GULF 1 0

05/81C 08/81C 09/81C 10/81C 10/81C 03/83C 05/83C N/A N/A 09/83 06/82C LASALLE 2 0

03/78C 02/81C 03/81C 04/81C 11/78C 07/83C 07/83 N/A N/A 09/83 10/83 MIDLAND 2 0

02/82C 04/82C 05/82C 06/82C 07/82C 08/82C 10/82C 11/82C 09/84 09/84 10/84 PALO VERDE 1 0

10/81C 10/81C 11/81C 12/81C

'3/82C 08/83 08/83 04/82C 12/82C 08/83 08/83 PALD VERDE 2 0

10/81C 10/81C 11/81C 12/81C 03/82C 08/83 06/84 04/82C 12/82C 07/84 08/84 PERRY 1 0

02/82C 05/82C 05/82C 07/82C 08/82C 10/83 11/83 05/83C 03/84 11/84 12/84 SAN ONOFRE 3 0

01/81C 01/81C 02/81C 02/81C 04/81C 04/83 06/82C 06/81C 05/82C 11/82C SEABROOK 1 0

05/82C 12/82C 03/83C 04/83C 12/82C N/S 06/83C 08/83 06/84 08/84 09/84 SHOREHAM 0

03/77C 03/81C 04/81C 10/81C 10/77C N/S 08/83 05/82C 09/83 08/83 SUSQUEHANNA 2 0

03/81C 03/81C 04/81C 08/81C 07/81C 02/83C 11/83 10/81C 04/82C 12/83 01/84 WASHINGTON NUCLEAR 2 0

07/81C 05/82C 03/82C 10/82C 12/81C 11/82C 05/83C N/A N/A 09/83 09/83 WATERFORD 3 0

05/81C 05/81C 07/81C 08/31C 09/81C 05/83C 06/83C 03/82C 04/83C 05/83 WATTS BAR 1 0

06/78C 06/82C 07/82C 08/82C 12/78C 09/82C 11/83 N/A N/A 12/83 01/84 WATTS BAR 2 0

06/78C 06/82C 07/82C 08/82C 12/78C 09/82C 06/84 N/A N/A 12/84 01/85 WOLF CREEK 1 0

01/82C 03/82C 04/82C 05/82C 06/82C 07/83C 08/83 09/83 03/84 07/84 08/84 ZIMMER 1 0

10/76C 12/77C 01/79C 03/79C 06/77C 08/82C 08/82C 02/82C N/S 11/84 12/84 MLICENSING SCHEDULES AND DECISION DATES DO NOT REFLECT POTENTIAL DELAY FROM EMERGENCY PREPAREDNESS REVIEW.

l LICENSING SCHEDULES FOR ALL TENDERED OL UNITS TO BE ISSbED AFTER.CY 1984 ISSUE APPL. CONST.

PLANT 11ER COMPLETE BEAVER VALLEY 2 02/85 12/85 BELLEF0HTE 1 N/S 05/85 I

l BELLEFONTE 2 N/S 05/86 BRAIDWOOD 1 05/84 04/85 BRAIDWOOD 2 H/S 04/86 BYROH 2 02/84 05/85 CATAWBA 2 N/S 10/86 CLINTON 1 05/83C 01/86 N/S CLINTON 2 GRAND GULF 2 N/S N/S HARRIS 1 04/84 06/85 HARRIS 2 H/S 06/89 HOPE CREEK 1 02/85 01/86 LIMERICK 1 10/83 08/84 LIMERICK 2 H/S 04/88 MARBLE HILL 1 04/85 06/86 MARBLE HILL 2 H/S 12/87 MIDLAND 1 10/82C 02/85 MILLSTONE 3 11/84 11/85 HINE MILE POINT 2 01/85 02/86 PALO VERDE 3 09/85 11/85 PERRY 2 H/S 05/87 RIVER BEND 1 05/84 04/85 RIVER BEND 2 N/S SEABROOK 2 N/S 12/86 SOUTH TEXAS 1 01/86 12/86 SOUTH TEXAS 2 N/S 12/88 V0GTLE 1 08/85 09/86 03/88 V0GTLE 2 WASHINGTON HUCLEAR 1 H/S N/S WASHINGTON HUCLEAR 3 12/84 12/85

l LICENSING SCHEDULES FOR ALL PENDING CP APPLICATIONS REPORT AS OF 07/30/83 (LISTED IM ORDER OF FACILITY hAME) r SER SSER l

STAFF TECH STAFF TECH ASLB COMM ISSUE INPUT ISSUE ACRS ISSUE INPUT ISSUE START INITIAL DEC.

PLANT Dfi TO DL IIR HIS Eli TO.DL 1118 0F HRG DECISION RAlf CLINCH RIVER 02/76C 02/83C 03/83C 04/83C 02/77C 04/83C 05/83C 08/82C 04/84 06/84 t

SKAGIT/HANFORD 182 05/82C 07/77C 08/77C 02/83C N/S 11/82C 12/82C N/S N/S N/S-

NEW APPLICATION F 0 R E C A S T --- O P E R A T I N G LICEN5E REVIEWS (ANTICIPATED TENDER DATES FOR ALL UNITS WITH CONSTRUCTION PERMITS)

AS OF WEEK ENDING: 07/30/83 LICENSING APPL.

APPL.

1ST UNIT

-DOCKET PROJECT SUBMITS SUBMITS CONST.

FACILITY NUMBER UTILITY MANAGER FSAR ENV. RPT. COMPLETE COUNSEL FY83 MILLSTONE 3 050-00423 NORTHEAST NUCLEAR ENERGY E.DOOLITTLE 10/29/82C 10/29/82C 11/01/85 M.ROTHSCHILD MARBLE HILL 1 82 054680547 PUBLIC SERVICE OF INDIANA P.0 CONNOR 11/23/82C 11/23/82C 06/00/86 E.CHEN BEAVER VALLEY 2 050-00412 DUQUESNE LIGHT L.LAZO 01/26/83C 01/26/83C 12/31/85 J.GUTEIRREZ HINE MILE POINT 2 050-00410 NIAGARA MOHAWK POWER M.HAUGHEY 01/31/83C 01/31/83C 02/00/86 B.BORDENICK HOPE CREEK 1 050-00354 PUBLIC SERVICE ELECTRIC 8 GAS D. WAGNER 03/02/83C 03/02/83C 01/14/86 R. GODDARD V0GTLE 1 82 0424-0425 GEORGIA POWER M. MILLER 06/30/83C 09/00/83 09/00/86 B.BORDEMICK

-_= _ - - - - - -. = - -

_=

1 I

NEW APPLICATION FORECAST-5PECIAL REVIEW AS OF WEEK ENDING: 07/30/83 5TANDARDIZATION REVIEW 5 i

~

PROJ PROJECT TENDER l

PROJECT

_.!!(L.

APPLICA E MANAGER

]

(MSS)WAPWR 668 WESTINGHOUSE-G.MEYER 9/ 0/83 1

i i

I i

1 m

l 1

e

i C0MM0N ABBREVIATIONS USED WITHIN THE PUBLICATION

'ACRS: ADVISORY COMMITTEE ON REACTOR SAFEGUARDS L.A.:

LICENSING ASSISTANT AE:

ARCHITECT / ENGINEER LESR - LIMITED EARLY SITE REVIEW (ALSO ABBREVIATED LES)

AEB ACCIDENT EVALUATION BRANCH LGR LICENSING GUIDANCE BRANCH ASB:

AUXILIARY SYSTEMS BRANCH LMFBR: LIQUID METAL FAST BREEDER REACTOR ASLB ATOPIC SAFETY LICENSING BOARD LQB:

LICENSEE QUALIFICATIONS BRANCH B8R BURNS 8 ROE MEB MECHANICAL ENGINEERING BRANCH B&V:

BLACK & VEACH MPA:

MANAGEMENT AND PROGRAM ANALYSIS 88W:

BABCOCK & WILCOX MTES: MATERIALS ENGINEERING BRANCH BECH: BECHTEL MWE MEGAWATTS ELECTRIC BRRT: BROWN & R00T MWT MEGAWATTS THERMAL BWR:

BOILING WATER REACTOR HSSS: NUCLEAR STEAM SYSTEMS SUPPLIER CEB CHEMICAL ENGINEERING BRANCH OL:

OPERATING LICENSE COMB COMBUSTION ENGINEERING OLB OPERATOR LICENSING BRANCH CP:

CONSTRUCTIDH PERMIT OPS:

OFFSHORE POWER SYSTEMS 1

CPB CORE PERFORMANCE BRANCH CSB:

CONTAINMENT SYSTEMS BRANCH CWE COMMONWEALTH EDISDN PDA:

PRELIMINARY DESIGN APPROVAL PGRE: PACIFIC GAS 8 ELECTRIC DES:

DRAFT ENVIRONMENTAL STATEMENT PID:

PARTIAL INITIAL DECISION l

PM:

PROJECT MANAGER PS:

POWER SYSTEMS BRANCH EEB:

ENVIRONMENTAL ENGINEERING BRANCH PSAR PRELIMINARY SAFETY ANALYSIS REPORT l

EPA:

ENVIRONMENTAL PROTECTION AGENCY PTRBs PROCEDURES AND TEST REVIEW BRANCH EPLB: EMERGENCY PREPAREDNESS LICENSING BRANCH PWR PRESSURIZED WATER REACTOR ER:

ENVIRONMENTAL REPORT EQB EQUIPMENT QUALIFICATION BRANCH ESR EARLY SITE REVIEW QAB QUALITY ASSURANCE BRANCH

)

ETSB: EFFLUENT TREATMENT SYSTEMS BRANCH RAB:

RADIOLOGICAL ASSESSMENT BRANCH F.R.:

FEDERAL REGISTAR RSB REACTOR SYSTEMS BRANCH FDA:

FINAL DESIGN APPROVAL FES:

FINAL ENVIRONMENTAL STATEMENT FSAR: FINAL SAFETY ANALYSIS REPORT 58L SARGENT & LUNDY 58W STONE & WEBSTER SAB SITING ANALYSIS BRANCH l

G4H:

GIBBS 8 HILL SARE SAFETY ANALYSIS REPORT j

GHDR GIBBS & HILL SDA:

STANDARD DESIGN APPROVAL t

GIL:

GILBERT COMMONWEALTH SEB STRUCTURAL ENGINEERING BRANCH GSB GEOSCIENCES BRANCH SER:

SAFETY EVALUATION REPORT SIB:

SYSTEMS INTERACTION BRANCH SP:

SPECIAL PROJECT HGB:

HYDROLOGIC AND GEOTECHNICAL BRANCH SSC:

SOUTHERN SERVICES COMPANY HTGR HIGH TEMPERATURE GAS COOLED REACTOR SSER: SUPPLEMENT TO SAFETY EVALUATION TVA:

TENNESSEE VALLEY AUTHORITY ICB:

INSTRUMENTATION AND CONTROL BRANCH I

UEC:

UNITED ENG. 8 CONSTRUCTORS

(

UFB:

UTILITY FINANCE BRANCH i

WEST: WESTINGHOUSE r

I 1

M M

Z O

M O

10 to

PR0 JECT IHDEX SECTION II OPERATING LICENSE REVIEW CONSTRUCTION PERMIT REVIEWS STANDARD DESIGH REVIEWS OTHER REVIEWS 2-1 BEAVER VALLEY 2 2-36 CLINCH RIVER 2-38 (HSS)CESSAR SYSTEM 80 2-2 BELLEFONTE 1 &2 2-37 SKAGIT/HANFORD 182 2-39 (HSS)GESSAR SEVERE ACC 2-3 BRAIDWOOD 1 &2 2-40 (HSS)GESSAR-238 HI 2-4 BYRON 1 &2 2-5 CALLAWAY 1 2-6 CATAWBA 1 &2 2-7 CLINT0H 1 &2 2-8 COMANCHE PEAK 1 &2 2-9 DIABLO-CANYOH 1 &2 2-to ENRICO FERMI 2 2-11 GRAND GULF 1 &2 2-12 HARRIS 1 &2 2-13 HOPE CREEK 1 2-14 LASALLE 2 2-15 LIMERICK 1 &2 2-16 MARBLE HILL 1 &2 2-17 MIDLAND 1 &2 2-18 MILLSTONE 3 2-19 HINE MILE POINT 2 2-20 PALO VERDE 1,2,3 2-21 PERRY 1 &2 2-22 RIVER BEND 1 &2 2-23 SAN ONOFRE 3 2-24 SEABROOK 1 &2 2-25 SHOREHAM 2-26 SOUTH TEXAS 1 &2 2-27 SUSQUEHAHMA 2 2-28 V0GTLE 1 & 2 2-29 WASHINGTON HUCLEAR 1 2-30 WASHINGTON HUCLEAR 2 2-31 WASHINGTOH HUCLEAR 3 2-32 WATERFORD 3 2-33 WATTS BAR 1&2 2-34 WOLF CREEK 1 2-35 ZIMMER 1

NRR LICENSING SYSTEM PAGE NO: 2-1 BEAVER VALLEY 2 0L CURRENT STATUS REP 0RT REPORT AS OF 07/30/80 PLANT CHARACTERISTICSt KEY PERS0NNEla DOCKET HO:

05000412 LIC. PM:

L. LAZO ASLB CHAIR: N/A APPLICANT:

DUQUESHE LIGHT LIC. BC:

G. KNIGHTON MEMBER 18 LOCATION:

5 MI E OF E. LIVERPOOL, OH LIC. LA.:

E. HYLTON MEMBER 2 REGION:

1 AE:

S8W COUNSEL:

J. GUTEIRREZ CONST. INSP S. FOLSOM REAC. TYPE: PWR HSSS: WEST ANTITRUST:

J. RUTBERG RESID. INSP DESIGH PWR: 2774 MWT/0852 MWE CONST: S8W RM AHALYST:

S. HEDLUND CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE !4CTUAL DATE The FSAR was tendered on 01-26-83.

The SAR was docketed on 05/18/83.

ER DOCKETED:

05/18/83 05/18/83C ER SITE VISIT COMPLETE:

INPUT TO DES TO PM:

05/31/84 ISSUE DES:

07/31/84 RESPONSE TO COMMENTS ON DES:

ISSUE FES:

12/31/84 CURRENT ENV. STATUS:

The ER was tendered on 01-26-83.

The ER was docketed on 35/18/83.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

01/26/83 01/26/83C SAR DOCKETED:

05/18/83 05/18/83C SAR Q'S RECEIVED BY PM:

07/31/83 SAR APPL. RESPONSE TO Q'S RECEIVED: 10/31/83 CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

01/31/84 Opportunity for Hearing will be published in the Federal ISSUE DRAFT SER:

02/28/84 Register.

INPUT TO SER:

08/31/84 ISSUE SER 10/31/84 t

ACRS FULL COMMITTEE MEETING:

12/31/84 INPUTS TO SE SUPPLEMENT 18 ISSUE SE SUPPLEMENT 1:

02/28/85 FEMA LETTER RECEIVED:

CURRENT ANTITRUST:

The information for antitrust review of operating HEARING STARTED:

04/30/85 license application was tendered 12/15/82.

ASLB INITIAL DECISION:

11/30/8D COMMISSION EFFECTIVENESS DECISION: N/S TECH SPECS COMPLETED:

COMMISSION DECISION:

12/09/85 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMtHT:

ISSUE FULL POWER LICENSE AMEND:

SCHED. DATE RECEIPT DATE HEW SLIPS /HOTES:

CONSTRUCTION CCMPLETION - APPL.

12/31/85 07/30/82 1

NRR LICENSING SYSTEM PA!E N3: 2-2 BELLEFONTE 1 82 0L CURRENT STATUS REPQRT REPORT AS OF 07/30/88 PLANT C H A R A C T E R I S T I C 5:

KEY PERS0NNELa DOCKET NO:

043880439 LIC. PM:

M.

THADANI ASLB CHAIR N/A APPLICANT:

TENNESSEE VALLEY AUTHORITY LIC. BC:

E. ADENSAM MEMBER 1 N/A LOCATION:

6 MI NE OF SCOTTSBORD. ALA LIC. LA.:

M. DUNCAN MEMBER 2:

N/A REGIDH 2

AE:

TVA COUNSEL:

B. PATON CONST. INSP R. CRLENJAK REAC. TYPE: PWR NSSS: B8W ANTITRUST:

J. RUTBERG RESID. INSP J. WILCOX DESIGN PWR 3760 MWT/1235 MWE CONST: TVA RM ANALYSTL B.

ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE As a result of applicant's construction delay, the staff review schedule has been delayed and the applicant has ER DOCKETED:

06/12/78 06/12e78C revised the fuel loading to 05/85.

The staff evaluated ER SITE VISIT COMPLETE:

02/20/82 06/17/82C the impacts of this delay on the safety and environmental INPUT TO DES TO PM:

11/04/83 review schedules and issued new schedule on 01/25/83.

ISSUE DES:

12/16/83 RESPONSE TO COMMENTS ON DES:

03/05/84 ISSUE FES:

05/18/84 CURRENT ENV. STATUS:

As a result of applicant's construction delay, the environ-mental review schedule was re evaluated and revised as SAFETY / HEARING MILESTONES:

indicated in the environmental milestones. The environmental site visit was completed on 6/17/82.

APPLICATION TENDERED:

02/03/78 02/03/78C SAR DOCKETED:

06/12/78C SAR Q'S RECEIVED BY PM:

07/03/80 11/01/82C SAR #PPL. RESPONSE TO Q'S RECEIVED: 12/02/83 CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

01/20/84 No hearing i s anticipated.

ISSUE DRAFT SER:

03/16/84 INPUT TO SER:

06/15/84 ISSUE SER:

08/17/84 I

ACRS FULL COMMITTEE MEETING:

09/28/84 INPUTS TO SE SUPPLEMENT 1 10/05/84 ISSUE SE SUPPLEMENT 1:

12/14/84 FdMA LETTER RECEIVED:

j CURRENT ANTITRUST:

1 Pending determination HEARING STARTED:

N/A t

ASLB INITIAL DECISION:

N/A COMMISSION EFFECTIVENESS DECISION:

TECH SPECS COMPLETED:

0?'01/85 COMMISSION DECISIDH:

04/15/85 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

05/00/85 No. 23 (12/17/82).

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

On 07/06/82 TVA revised fuel load date to 5/85.

Staff CONSTRUCTION COMPLETION - APPL.:

05/08/85 07/06/82 evaluated impact on safety and environmental review l

schedules and issued new schedule on 01/25/83.

(

l

l HRR LICEH$IHG SYSTEM PAGE HO: 2-3 BRAIDWOOD 1 82 0L CURRENT STATUS REPORT REPORT AS OF: 07/30/80 l

l PLAHT C H A R A C T E R I S T I C S:

KEY PERSCHHELa 1

LIC. PM:

J. STEVENS ASLB CHAIR:

M. MILLER DOCKET NO:

045650457 I

APPLICANT:

COMMONWEALTH EDISON LIC. BC:

J. YOUNGBLOOD MEMBER 1:

R. COLE LOCATION:

24 MI SSW OF JOLIET. ILL LIC. LA.:

M.

RUSHBROOK MEMBER 2:

D. CALLIHAN REGION:

3 AE:

SIL COUNSLL:

D. HASSELL CONST. INSP: J. HEISLER REAC. TYPE: PWR NSSS: WEST ANTITRUST B. V0GLER RESID. INSP L. MCGREGOR DESIGN PUR: 3425 MWT/1120 MWE CONST: CWE RM ANALYST:

S. HEDLUND ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

Draft SER was issued on July 15, 1983.

11/30/78C ER DOCKETED:

ER SITE VISIT COMPLETE:

05/31/83 05/05/83C INPUT TO DES TO PM:

11/01/83 ISSUE DES:

01/01/84 RESPONSE TO COMMENTS ON DES:

04/15/64 ISSUE FES:

06/00/84 CURRENT ENV. STATUS:

Site visit was conducted during May, 1983.

Amendment 2 to ER submitted during June, 1983.

Pubile meeting scheduled SAFETY /HEARIn:3 MILESTONES:

during August, 1983.

APPLICATION TENDERED:

06/26/78 06/26/78C SAR DOCKETED:

11/00/78 11/30/78C SAR Q'S RECEIVED BY PM:

12/31/82 12/31/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 03/01/83 05/06/83C INPUT TO DRAFT SER TO PM:

05/01/83 06/15/83C CURRENT HRG. STATUS:

ISSUE DRAFT SER:

07/15/83 07/15/83C Opportunity for Hearing was published in the Federal Register on 06/13/79.

There will be a contested hearing.

INPUT TO SER3 11/01/83 ISSUE SER:

12/01/83 ACRS FULL COMMITTEE MEETING:

01/00/84 INPUTS TO SE SUPPLEMENT 1:

04/01/84 ISSUE SE SUPPLEMENT 13 05/00/84 FEMA LETTER RECEIVED:

H/S CURRENT ANTITRUST:

Applicant has submitted antitrust information pursuant to HEARING STARTED:

10/00/84 ASLB INITIAL DECISION:

03/00/85 Req. Guide 9.3.

COMMISSION EFFECTIVENESS DECISION: 04/00/85 TECH SPECS COMPLETED:

04/00/85 COMMISSION DECISION:

04/00/85 ISSUE LIC. WITH POWER RESTRICTION:

ISSUE FULL POWER LICENSE AMEND:

04/00/85 LATEST AMENDMENT:

FSAR Amendment No. 42 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.:

04/00/85 04/14/82

1 f

i i

NRR LICEN$ING SY$ TEM PAGE NO: 2-4 BYROM 182 0L CURRENT STATUS REF0RT REPORT AS OF 07/30/80 t

PLANT C H A R A C T E R I S T I C S:

KEY PERSONNEL:

DOCKET NO:

045400455 LIC. PM:

L. OLSHAN ASL8 CHAIR:

I. SMITN APPLICANT:

COMMONWEALTH EDISON LIC. EC J. YOUNGBLOOD MEMBER 1:

R. COLE LOCATION:

17 MI SW OF ROCKFORD. ILL LIC. LA.:

M. RUSNBROOK MEMBER 2:

D. CALLINAN REGION:

3 AE:

58L COUNSEL:

S. GOLDBEdG CONST. INSP M. RING REAC. TYPE: PWR NSSS: WEST ANTITRUST:

B. V0GLER RESID. INSP W. FORNEY.

i DESIGN PWR: 3425 MWT/1120 MWE CONSY: CWE RM ANALYST:

5. HEDLUND I

CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SER and Supplements I and 2 have been issued. Several.

outstanding and confirmatory issues remain to be ER DOCKETED:

11/30/78C resolved prior to Ilcensing.

ER SITE VISIT COMPLETE:

05/31/81-05/31/81C 4

INPUT TO DES TO PM:

88/15/81 08/15/Stc ISSUE DES:

11/05/81 II/05/81C RESPONSE TO COMMENTS ON DES:

03/01/82 03/01/82C ISSUE FES:

04/05/82 04/05/82C CURRENT ENV. STATUS:

Environmental review completed and FES (HUREG-0848; published in April 1982.

SAFETY / NEARING MILESTONES:

APPLICATION TENDERED:

06/26/78 06/26/78C SAR DOCKETED:

11/00/78 11/30/78C SAR Q'S RECEIVED BY PM:

08/15/81-08/15/8tC i

SAR APPL. RESPONSE TO 4'S RECEIVEDs.10/15/St 10/15/81C l

CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

11/07/81 11/07/8tc

+

Hearing began March 1,

1983.

ISSUE DRAFT SER INPUT TO SER:

01/07/82 St/07/82C ISSUE SER:

02/07/82 02/07/82C ACRS LETTER RECEIVED:

03/10/82 03/10/82C INPUTS TO SE SUPPLEMENT 2 08/20/82 08/20/82C

i ISSUE SE SUPPLEMENT 2

12/10/82 01/31/83C FEMA LETTER RECEIVED:

CURRENT ANTITRUST:

9 Applicant has submitted antitrust information pursuant.

HEARING STARTED:

03/05/83 03/01/83C to Req. Guide 9.3, ASL8 INITIAL DECISIDH 11/00/83 COMMISSION EFFECTIVENESS DECISION: It/a0/83 TECH SPECS COMPLETED:

11/00/83 COMMISSION DECISION:

11/08/83 3

ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

12/09/83 FSAR - Amendment 42 SCHED. DATE RECEIPT DATE ER - Amendment 3 4

HEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.:

12/08/83 06/21/83 i

l l

NRR LICENSING SYSTEM PAGE NO: 2-5 CALLAWAY 1 0L CURRENT STATUS REPORT REPORT AS OF 07/30/80 PLANT C H A R A C T E R I $ T I C S:

KEY PERS0NN E L:

LIC. PM:

G.

EDISON ASLB CHAIR:

J. GLEASON DOCKET NO:

05000483 LIC. BC:

B. YOUNGBLOOD MEMBER 1 G. BRIGHT APPLICANT:

UNION ELECTRIC LIC. LA.:

M.

RUSHBROOK MEMBER 2 J. KLINE LOCATION:

10 MI SE OF FULTON, MO REGION:

3 AE:

BECH COUNSEL:

B. PERLESS CONST. INSP: J. KONKLIN REAC. TYPE: PWR HSSS: WEST ANTITRUST B. V0GLER RESID. INSP: J. NEISLER DESIGN PWR: 342S MWT/1188 MWE CONST DANIEL RM ANALYST:

5. HEDLUND ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

SAR was docketed 08/08/80. The SER was issued by HRC on 12/12/80 12/12/80C 10/07/81 and the SER Supplement No. 1 was isTued on ER DOCKETED:

ER SITE VISIT COMPLETE:

12/00/81 12/00/81C l

01/15/82.

SSER 2 was issued 6/28/83.

INPUT TO DES TO PM:

08/01/81 08/01/81C ISSUE DES:

09/29/81 09/29/81C RESPONSE TO COMMENTS ON DES:

12/01/81 12/01/81C ISSUE FES:

01/29/82 01/27/82C CURRENT ENV. STATUS:

ER was docketed 12/12/80. The DES was issued by NRC on 09/29/81 and the FES was issued on 01/29/82.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

10/2S/79 10/25/79C SAR DOCKETED:

08/08/80 08/08/80C SAR Q'S RECEIVED BY PM:

12/18/80 12/18/8 0 C SAR APPL. RESPONSE TO Q'S RECEIVED: 10/01/81 10/01/81C INPUT TO DRAFT SER TO PM:

CURRENT HRG. STATUS:

Hearings were held on limited issues during November 1981.

ISSUE DRAFT SER:

N/A A decision on these limited issues was rer.dered by the INPUT TO SER:

09/11/81 09/11/81C i

licensing board on 12/13/82.

Joint intervenors have ISSUE SER:

10/07/81 10/07/81C l

appealed the initial decision.

Oral arguments on the appeal were made on 6/22/83. The hearing on the one ACRS LETTER RECEIVED:

11/19/81 11/19/81C remaining contention, emergency preparedness, is scheduled INPUTS TO SE SUPPLEMENT 2 01/01/82 01/01/82C ISSUE SE SUPPLEMENT 2:

06/00/83 06/28/83C for 8/31/83.

FEMA LETTER RECEIVED:

11/00/83 CURRENT ANTITRUST:

HEARING STARTED:

11/17/81 11/17/81C OL review is in progress.

ASLB INITIAL DECISION:

10/00/83 COMMISSION EFFECTIVENESS DECISIDH:

11/00/83 TECH SPECS COMPLETED:

02/00/84 COMMISSIDH DECISION:

03/00/84 ISSUE LIC. WITH POWER RESTRICTION: 04/00/84 ISSUE FULL POWER LICENSE AMEND:

07/00/84 LATEST AMENDMENT:

SCHED. DATE RECEIPT DATE CONSTRUCTION COMPLETION - APPL.'

04/00/84 08/23/82 NEW SLIPS / NOTES:

The Caseload Forecast Panel is reviewing construction in order to make a new construction completion progress schedule estimate.

An April 1984 estimate is based on 1

the aoolicant's fuel load date.

MRR LICEN$ING SYSTEM PAGE NO: 2-6 CATAWBA 1 82 0L CURRENT STATUS REPORT REPORT'AS OF 07/30/80 PLANT C H A R A C 7 E R I S T I C S:

KEY P E R S 0 N N E L :-

DOCKET NO:

041380414 LIC. PM:

K. JABBOUR ASLB CHAIR:

J. KELLEY APPLICANT:

DUKE POWER LIC. BC:

E. ADENSAM MEMBER 1 D. CALLINAN LOCATION:

6 MI NNW OF ROCK HILL, SC LIC. LA.:

M. DUNCAN MEMBER 2 R. FOSTER REGION:

2 AE:

DUKE COUNSEL:

G. JOHNSON CONST. INSP P. VAND00RN REAC. TYPE: PWR NSSS: WEST ANTITRUST B. V0GLER RESID. INSP P. VAND00RN DESIGN PWR 3582 MWT/1145 MWE CONST: DUKE RM ANALYST:

L. LANIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SER was issued on February 9, 1983.

SSER 81 was issued on May 2, 1983.

ER DOCKETED:

06/11/81 06/11/8tc ER SITE VISIT COMPLETE:

10/15/81 10/15/8tC INPUT TO DES TO PM:

26/25/82 07/29/82C ISSUE DES:

08/05/82 08/11/82C RESPONSE TO COMMENTS ON DES:

11/30/82 11/30/82C ISSUE FES:

01/07/83 01/07/83C CURRENT ENV. STATUS:

DES was issued on 08/11/82. FES was issued on 1/7/A3.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

03/26/79 03/26/79C SAR DOCKETED:

06/11/81 06/11/81C SAR Q'S RECEIVED BY PM:

12/15/81 12/15/81C SAR APPL. RESPONSE TO Q'S RECEIVED: 12/10/82 12/10/82C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

07/02/82 12/30/82C Combined hearing anticipated to start 10/83.

ISSUE DRAFT SER:

11/19/82 11/19/82C INPUT TO SER:

01/09/83 Ot/19/83C ISSUE SER:

02/06/83 02/09/83C ACRS LETTER RECEIVED:

03/18/83 03/18/83C INPUTS TO SE SUPPLEMENT 1:

04/12/83 04/12/83C ISSUE SE SUPPLEMENT 18 05/02/83 05/02/83C FEMA LETTER RECEIVED:

09/15/83 CURREN1 ANTITRUST:

Operating license antitrust review is in progress.

HEARING STARTED:

10/00/83 ASLB INITIAL DECISION:

05/00/84 COMMISSION EFFECTIVENESS DECISION: 05/00/84 TECH SPECS COMPLETED:

05/00/84 COMMISSION DECISION:

05/00/84 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMLHT:

ISSUE FULL POWER LICENSE AMEND:

05/00/84 Revision 7 dated 02/22/83.

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CP Amend. Issued 12/:'/80 indicating change in. ownership.

CONSTRUCTION COMPLETION - APPL.:

05/00/84 05/00/82 i

k

s G

9

~~

w

't e

.v i

1

'NRR LI-CEHlSI-NG SY5 TEM

~

- 7 PAGE NO 2-7 CLINTONII 8 2

' OL CURRENT 5T# JUS R E P.0 R T REPORT AS OF 07/30/80

/

r

  • P L A;N T CHARA C T E Rt! S T I.C St Kff RERSONNELa

/

DOCKET NO:

046180462 LIC. PM:.

1 H. ABELSON ASLB CHAIR:

H. CLARK

. APPLICANT:

ILLINDIS POWER-

'LIC.* AC:

A. SCHWENCER -

MEMBER 1 G. FERGUSON LOCATION:

6 MI E OF CLINTON! ILL,

LIC.

LA,.r.

E.,.hYLTON MEMBER 22

0. PARIS REGION:

3 AE:

$8L COUNSEL:

k A'. 'GODD ARD CONST. INSP F. JABLONSKI REAC. TYPE: BWR NSSS:

GE-ANTITRUST 3-B. V3GLER RESID. INSP H. LIVERMORE DESIGN PWR 2894MWT/0950-MyE CONSTr B ALPWIN F.M AMALYST&

E. ST MARY lENVIRONMENTALMILEh'9NES:

CURRENT SAF. STA1US:t SER sias issum'd'02/17/82.

i 21 _

FSAR was docketed'39/08/80.

SCHED. DATE ACTUAL DATE s

Supplement No. I was issued 07/22/42..SSCR Ho, 2 was ER DOCKETED:-

3 03/01/81 09/08/80C issued in May 1983.

ER SITE VISIT COMPLETE:

i INPUT TO DES TO PM:

12/08/81 12/08/81C s

j ISSUE DES:

12/18/81 12/28/81C*

s RESPONSE TO COMMEN{S ON DES:

02/22/32 03/25/82C

_s ISSUE FES 05/20/82 05/20/82C i

1

'CURREtiJ ENV. STATUS:

3 4

The draft environmental statement was completed December s

1981.

The FES'was completed May 1982.

58FETY/NEARTNG MILESTONES:

APPLICATI0H TENDERED:

12/01/79 12/01/79C 6

SAR DOCKEIED:

09/08/80 09/08/80C SAR Q'S RECEIVED BY PM:

SAR APPL. RESPONSE TO 4'S RECEIVED:

CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

A third prehearing conference was held June 2, 1983.

Five ISSUE DRAFT SER:

contentions are admitted. Nearing estimated to start late IMPUT TO SER:

12/05/81 12/05/81C 1983 or early 1984.

Awaiting Board order.

ISSUE SER:

01/05/82 02/17/82C ACRS LETTER RECEIVED:

02/12/82 03/09/82C INPUTS TO SE SUPPLEMENT 28 06/30/82 06/30/82C ISSUE SE SUPPLEMENT 28 05/20/83 05/27/83C a

FEMA LETTER RECEIVED:

N/S CURRENT ANTITRUST:

Operating license antitrust review completed HEARING STARTED:

12/08/83 March 18, 1982 (SECY-82-120).

ASLB INITIAL DECISION:

12/08/83 COMMISSION EFFECTIVENESS DECISION: 01/00/84 TECH SPECS COMPLETED:

11/00/85 COMMISSION DECISION:

12/08/85 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

04/08/86 i

FSAR Amendment 025, 05/83.

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

A two year slip in fuel load date to 1/86 was announced by CONSTRUCTION COMPLETION - APPL.:

01/09/86 05/24/83 IPC on 05/24/83.

f

'y S

^

J--

  • j fi l

o j

r NRR LICENSING SYSTEM PAGE HO 2-8 CDMANCHE PEAK 1 82 0L CURREN 1 STATUS REPQRT RErCRT AS OF: 07/3b/80 PLANT C H A R A C T E R -I S T l' C S:

KEY PERS0NNE1:

DOCKET NO:

044550446 I'

~

LIC. PM:

S RURWELL Asta CHAIR P. BLCCH l

APPLICANT:

TEXT.S UTILITIES GENERATING LIC. BC:

B. YOUNGBLOOD MEMBER 1:

W. J0k3AN LOCATION:

4 MI N OF GLEN ROSE, TEX LIC.

LA.'

".. RUSHBROOK MEMBER 2:

K. MCCOLLOM REGIDH:

4 sA E.

'GtH' COUNSEL:

'M.

ROTHSCHILD CONST. INSP: R.

TAYLOR REAC. TYPE: PWR NSSS: WEST' ANTITRUST:, P.

VD GL E *.-

RESID. INSP:'D. KELLEY DESIGN PWR: 3411 MWT/115e MWE CONST: P3RT' RM ANALfST:/ 3. HEDLuND

7

CURRENT SAF. STATUS:

ENVIR'ONMENTAL MILESTONES:

SCHED. CATE ACTUAL DATE The SER was issued 07/14/81.

The staff deferred schedulinq the Comanche Peak review by the ACRS until sufficient ER DOCKETED:-

01/19/79 01/19/79C information was provided to resolve a large number of open ER SIIE VISIT CGMPLETE:

06/20/80 08/07/80C issues.

SSER #1 was issued 10/16/81 Application was IMPUT TO'UES TO PM:

08/15/80 04/27/81C reviewed by the ACRS on 11/13/81 SSER 82 responding to ISSUE DES:

04/30/81 05/22/81C the ACRS was issued on 01/20/82. SSER 83 containing RESPONSE TO COMMENTS ON DES:

07/19/81 08/28/81C emergency preparedness was issued 03/11/83.

ISSUE FES:

09/18/31 09/24/81C CURRENT ENV. STATUS:

The DES was issued on 05/22/81.

The EPA Federal Register Hotice was printed on 05/29/81 and the comment period SAFETY / HEARING MILESTONES:

ended 07/13/81.

The FES was issued on 09/24/81 APPLICATION TENDERED:

03/01/78 03/01/78C SAR DOCKETED:

05/12/78 05/12/78C SAR Q'S RECEIVED BY PM:

12/30/78 02/22/79C SAR APPL. RESPONSE TO Q'S RECEIVED: 05/08/79 01/31/80C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

04/13/79 03/11/81C Hearing began 12/02/81.

Issues heard were financial ISSUE DRAFT SER:

03/31/81 03'31/81C qualifications and operating QA program.

Further hearing INPUT TO SER:

05/22/81 07/08/81C sessions on QA/QC during construction were held 06/07-11/82, ISSUE SER:

07/14/81 07/14/81C 07/26-30/82, and 09/13-17/82.

The fifth and sixth hearing session continuing testimony on QA/QC during construction ACRS LETTER RECEIVED:

11/17/81 11/17/81C and emergency preparedness were held 5/16-20 and 6/13-16/83.

INPUTS TO SE SUPPLEMENT 4:

10/14/83 The seventh hearing session continuing testimony on QA/QC ISSUE SE SUPPLEMENT 4:

08/12/83 during construction has not been noticed.

FEMA LETTER RECEIVED:

11/00/83 CURRENT ANTITRUST:

ALJ appointed on 02/23/82 to replace ASLB.

Prehearing HEARING STARTED:

12/02/81 12/02/81C conference held 04/13/82 to determina status of parties.

ASLB INITIAL DECISION:

11/00/83 Briefs filed 05/04/82 request immediate imposition of COMMISSION EFFECTIVENESS DECISIDH 11/00/83 l

settlement license conditions. A Memorandum and Order TECH SPECS COMPLETED:

11/00/83 i

approving settlement agreements 8 proposed license COMt1ISSION DECISION:

11/00/83 l

conditions a dismissing proceedings was issued 05/06/82.

ISSUE LIC. WITH POWER RESTRICTION:

12/00/83 LATEST AMENCMENT:

ISSUE FULL POWER LICENSE AMEND:

12/00/83 41 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

SSER-4, an interim supplement, is slipped 1/2 month due to CONSTRUCTION COMPLETI0H - APPL.:

12/00/83 07/08/83 applicant delays in submittal of information and staff delay in reviewing earlier submittals. No impact on fuel load date is croiected.

PAGE HO 2-9 HRR LICEHSIHG SYSTEM l

DIABLD-CANYON 1 82 0L CURREHT S7 ATUS REPORT REPORT AS OF: 07/30/80 KEY P E R S 0 N N E L:

l PLAHT CHARACTERI5TICSt LIC. PM:

B. BUCKLEY ASLB CHAIR J. WOLF DOCKET NO:

027580323 LIC. BC:

G. KNIGHTON MEMBER 1:

J. KLINE LIC.

LA.'

J. LEE MEMBER 2:

G. BRIGHT l

APPLICANT:

PACIFIC GAS & ELECTRIC LOCATION:

12 MI WSW OF SAN LUIS OBISPO REGION:

5 AE:

PG8E COUNSEL:

L. CHANDLER CONST. INSP D. KIRSCH REAC. TYPE: PWR NSSS: WEST ANTITRUST:

J. RUTBERG RESID. INSP: J. CARLSON DESIGN PWR: 3338 MWT/1084 MWE CONST: PG8E RM ANALYST:

B. ST MARY ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CURRENT SAF. STATUS:

SSER 15 (Equip. Qualification) was issued on 10-02-81 11/09/71 11/09/71C SSER 16 is estimated for 08/01/83 (indicated as SSER9 ER DOCKETED:

ER SITE VISIT COMPLETE:

schedule). Favorable ASLB Initial Decision on a full power license was issued on August 31, 1982.

Low INPUT TO DES TO PM:

10/09/72 10/09/72C on 12/12/72 12/12/72C Power license was issued on 09-22-81 and suspended on ISSUE DES:

RESPONSE TO COMMENTS OH DES:

04/27/73 04/27/73C 09/15/75 05/28/76C Hovember 19, 1981.

ISSUE FES:

CURRENT ENV. STATUS:

Complete SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

07/10/73 07/10/73C 10/02/73 10/02/73C SAR DOCKETED:

SAR Q'S RECEIVED BY PM:

01/04/74 01/04/74C SAR APPL. RESPONSE TO 4'S RECEIVED: 11/01/74 11/01/74C INPUT TO DRAFT SER TO PM:

01/24/75 01/24/75C CURRENT HRG. STATUS:

LP hearings were held 05/19-22/81.

A favorable PID on ISSUE DRAFT SER:

01/24/75 01/24/75C low power operation was issued 07/17/81. A full-power INPUT TO SER:

10/04/74 10/16/74C hearing was completed on 01/26/82.

In 8/82 an Initial ISSUE SER:

Decision was issued authorizing issuance of a full power I

operating license.

The ASLAB reopened the record on design ACRS LETTER RECEIVED:

05/00/78 07/18/78C Evidentiary hearing concluded on 7/22/83 INPUTS TO SE SUPPLEMENT 9 06/21/83 06/21/83C ISSUE SE SUPPLEMENT 9 08/01/83 I

quality assurance.

to determine if construction quality assurance will also be FEMA LETTER RECEIVED:

N/S subject of a hearing.

CURRENT ANTITRUST:

HEARING STARTED:

10/29/75 12/07/76C Not required ASLB INITIAL DECISIGHz 09/00/82 08/31/82C COMMISSION EFFECTIVENESS DECISION:

TECH SPECS CLMPLETED:

09/15/81 09/15/81C l

COMMISSIDH DECISIDH:

09/00/83 ISSUE LIC. WITH POWER RESTRICTION: 09/30/85 i

f ISSUE FULL POWER LICENSE AMEND:

12/30/83 LATEST AMENDMENT:

SCHED. DATE RECEIPT DATE Estimate of dates from end of LP hrq to lic. complete CONSTRUCTICH COMPLETI0H - APPL.:

NEW SLIPS / NOTES:

dependent upon dev./ approval of State and local Emergency Plans.

Ongoing Design Verif. Program likely to identify olant modification?.

Const. comoletion deoendent on mods.

I NRR LICENSING SYSTEM PAGE NO: 2-10 ENRICO FERMI 2 0L CURRENT STATUS REP 0RT REPORT AS OF: 07/30/80 1

PLANT C H A R A C T E R I S T I C 5:

KEY P E R S 0 N N E L:

DOCKET NO:

05000341 LIC. PM:

D. LYNCH ASLB CHAIR G. MILLHOLLIN APPLICANT:

DETROIT EDISON LIC. BC:

J. YOUNGBLOOD MEMBER 1:

P. MORRIS LOCATION:

LAGUNA BEACH, MICH LIC. LA.:

M. RUSHBROOK MEMBER 2:

D. SCHINK REGION:

3 AE*

SIL COUNSEL:

C. WOODHEAD CONST. INSP P. PELKE REAC. TYPE: BWR HSSS: GE ANTITRUST:

A. HDDGDON RESID. INSP P. BYRON DESIGN PWR: 3292 MWT/1093 MWE CONST DANIEL RM ANALYST:

S. HEDLUND l

CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE An interim SER was issued on 09-29-77 and a final SER was issued on 07-10-81 SSER No. I was issued 9-25-81.

ER DOCKETED:

04/04/75 04/04/75C SSER Ho. 2 was issued 1-29-82 with 7 prelicensing issues ER SITE VISIT COMPLETE:

09/27/78 10/31/78C outstanding. SSER No. 3 was issued on 2-4-83.

The staff INPUT TO DES TO PM:

07/31/81 04/24/81C requested that the standby liquid control system be ISSUE DES:

05/01/81 04/30/81C upgraded to conform to the level 1 QA/QC program.

RESPONSE TO COMMENTS ON DES:

07/31/81 06/29/81C ISSUE FES:

08/31/81 09/04/81C CURRENT ENV. STATUS:

Addendum No. I to the FES was issued 03-03-82.

SAFETY / NEARING MILESTONES:

APPLICATION TENDERED:

10/22/74 10/22/74C SAR DOCKETED:

04/05/75 04/05/75C SAR Q'S RECEIVED BY PM:

06/13/75 08/11/75C SAR APPL. RESPONSE TO Q'S RECEIVED: 08/29/75 01/12/76C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

10/24/75 03/08/76C A hearing on two issues began on 03-31-82 and ended on ISSUE DRAFT SER:

04-02-82.

Monroe County, Michigan petitioned for INPUT TO SER:

03/05/76 05/20/77C leave to reopen hearings on the evacuation issue of ISSUE SER:

08/01/77 09/29/77C Emergency Prepardness; the Board denied this petition.

ASLB issued initial decision on 10/29/82 authorizing ACRS LETTER RECEIVED:

08/20/81 08/11/81C operating license issuance. The Commission issued its INPUTS TO SE SUPPLEMENT 3:

08/22/82 01/05/83C Immediate Effectiveness Decision on 12/22/82.

ISSUE SE SUPPLEMENT 3:

09/01/82 02/04/83C FEMA LETTER RECEIVED:

09/01/83 CURRENT ANTITRUST:

An ASLB decision on antitrust matters was issued on HEARING STARTED:

12/02/81 03/31/82C 04-25-78.

ASLB INITIAL DECISION:

10/00/82 10/29/82C COMMISSION EFFECTIVENESS DECISION:

TECH SPECS COMPLETED:

10/30/83 COMMISSION DECISI0H:

11/00/83 ISSUE LIC. WITH POWER RESTRICTION: N/A LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

12/30/83 The latest final Safety Analysis Report Amendment is number 49.

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.:

12/30/83 06/22/83

MRR LICENSING SY$ TEM PAGE NO: 2-11 GRAND GULF 1 42 LIC CURRENT 5TATUS REPORT REPORT AS OF 07/30/80 PLANT CHARACTERI5 TIC 5:

KEY P E R S O N N E L:

DOCKET NO:

041680417 LIC, PM:

D. NOUSTON ASLB CHAIR:

J. LAURENSON APPLICANT:

MISSISSIPPI POWER 8 LIGHT COMPANY LIC. BC:

A.

SCHWENCER MEMBER 1:

G. BRIGHT LOCATION:

2S MI S OF VICKSBURG, MISS LIC. LA.:

E. NYLTON MEMBER 2 J. HARBOUR REGION:

2 AE:

BECH COUNSEL:

M. WACHER CONST. INSP R. VANDORN REAC. TYPE: BWR HSSS: GE ANTITRUST:

B. V0GLER RESID. INSP A. WAGNER DESIGN PWR: 3833 MWT/1250 MWE CONST: BECH RM ANALYST:

B. ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SER was issued on September 10, 1981.

SSERs were issued in December 1981, in June and July 1982 and in May 1983.

ER DOCKETED:

06/05/78 06/30/78C The ACRS report on full power operation for Unit 1 was ER SITE VISIT COMPLETE:

12/14/79C issued August 18, 1982.

Interim FEMA letter was received INPUT TO DES TO PM:

04/30/81 04/30/81C 12/17/82.

ISSUE DES:

05/31/81 05/31/81C RESPONSE TO COMMENTS ON DES:

08/15/81 08/15/81C ISSUE FES:

09/15/81 10/09/81C CURRENT ENV. STATUS:

DES was issued in May 1981.

FES was issued October 9, 1981.

SAFETY / NEARING MILESTONES:

APPLICATION TENDERED:

04/28/78 04/28/78C SAR DOCKETED:

06/05/78 06/30/78C SAR Q'S RECEIVED BY PM:

04/24/79C SAR APPL. RESPONSE TO Q'S RECEIVED: 07/01/80 09/30/80C CURRENT NRG. STATUS:

INPUT TO DRAFT SER TO PM:

N/S No hearing.

Petition was filed by the Stats ISSUE DRAFT SER:

09/18/81C of Louisiana on basis of Court of Appeals, District of INPUT TO SER:

04/01/81 08/14/81C Columbia, opinion on S-3 Table issue.

Board denied petition ISSUE SER:

06/00/81 09/10/81C for intervention on October 20, 1982.

The State of Louisiana filed an appeal to the Board's denial. Appeal ACRS LETTER RECEIVED:

07/00/81 08/18/82C Board upheld the denial for intervention in a decision INPUTS TO SE SUPPLEMENT 4:

04/01/82 03/15/83C issued December 8, 1982.

ISSUE SE SUPPLEMENT 4:

05/31/83C FEMA LETTER RECEIVED:

04/00/83 06/29/83C CURRENT ANTITRUST:

OL review is in progress. No significant changes have NEARING STARTED:

N/A occurred since the CP.

ASLB INITIAL DECISION:

N/A COMMISSION EFFECTIVENESS DECISION:

TECH SPECS COMPLETED:

09/01/81 06/16/82C COMMISSION DECISION:

09/00/83 ISSUE LIC. WITH POWER RESTRICTION: 04/23/82 06/16/82C LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

09/30/83 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

Unit 1 OL for fuel load to 5% power issued 46/16/82. FP de-CONSTRUCTION COMPLETION - APPL.:

06/16/82C OL ISSUED layed by Region II COA on TS surveillance procedure defic-tencies 1 outstanding items, maint. & mods for 1st refueling outaae.

Aeol. not readv to ao above 5% until 9/83.

NRR LICENSING SYSTEM PAGE NO 2-12 HARRIS 1 8 2 0L CURRENT STATUS REP 0RT REPORT AS OF: 07/30/88 PLANT CHARACTERISTICS:

KEY P E R S 0 N N E L:

DOCKET NO:

0400-0401 LIC. PM:

P. KADAMBI ASLB CHAIR:

J. KELLEY APPLICANT:

CAROLINA POWER 8 LIGHT LIC. BC:

G. KNIGHTON MEMBER 1:

G. BRIGHT LOCATION:

20 MI SW OF RALEIGH, NC LIC. LA.:

J.

LEE MEMBER 2:

J. CARPENTER REGIGHz 2

AE:

EBASCO COUNSEL:

C. BARTH CONST. INSP:

I REAC. TYPE: PWR NSSS: WEST ANTITRUST:

J. RUTBERG RESID. INSP: G. MAXWELL DESIGN PWR: 2775 MWT/0915 MWE CONST: DANIEL RM ANALYST:

B. ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE FSAR was docketed on 12/22/81 Questions were sent to the applicant between 4/26/82 and 7/30/82. Most of ER DOCKETED:

12/22/81 12/22/81C applicant's responses were received by 08/31/82. Draft ER SITE VISIT COMPLETE:

04/08/82 04/08/82C SER issued 2/1/83.

INPUT TO DES TO PM:

01/14/83 02/08/83C ISSUE DES:

04/00/83 04/00/83C RESPONSE TO COMMENTS ON DES:

08/05/83 ISSUE FES:

08/31/83 CURRENT ENV. STATUS:

ER was docketed on 12/22/81. The site visit was complete on 04/08/82 and questions were sent to applicant on SAFETY / HEARING MIL ESTONES:

04/28/82. Most of the applicant's responses were received by October 15, 1982.

Draft Environmental Statement APPLICATION TENDERED:

06/26/80 06/26/80C was issued in April 1983.

SAR DOCKETED:

12/22/81 12/22/81C SAR Q'S RECEIVED BY PM:

07/09/82 07/09/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 11/08/82 11/08/82C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

09/01/83 Notice for Opportunity for Hearing was published in the ISSUE DRAFT SER:

01/03/83 02/01/83C Federal Register on January 27, 1982.

Several petitions INPUT TO SER:

09/01/83 to intervene were filed. Prehearing conference on petitions ISSUE SER:

11/01/83 was held on July 13-14, 1982.

Board decision on contentions issued September 23, 1982.

Further clarification issued ACRS FULL COMMITTEE MEETING:

01/02/84 January 11, 1983.

A pre-hearing conference was held on INPUTS TO SE SUPPLEMENT 1:

03/01/84 February 24, 1983 on discovery and scheduling.

ISSUE SE SUPPLEMENT 1:

04/02/84 FEMA LETTER RECEIVED:

04/00/84 CURRENT ANTITRUST:

Status to be determined.

HEARING STARTED:

01/04/84 ASLB INITIAL DECISION:

05/01/85 COMMISSION EFFECTIVENESS DECISION: 05/00/85 TECH SPECS COMPLETED:

05/01/85 COMMISSION DECISIDH:

05/09/85 ISSUE LIC. WITH POWER RESTRICTION: 06/00/85 LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

06/03/85 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

Staff schedule based on fuel load date of 06/03/85.

CONSTRUCTION COMPLETI0H - APPL.:

06/03/85 10/06/82

HRR LICENSING SYSTEM PAGE HO: 2-13 HOPE CREEK 1 0L CURRENT STATUS REP 0RT REPORT AS OF 07/30/80 PLAHT CHARACTERISTICSt KEY PERS0NNEL DOCKET HO:

05000354 LIC. PM:

D. WAGNER ASLB CHAIR: N/A l

APPLICANT:

PUBLIC SERVICE ELECTRIC 3 GAS LIC. BC:

A. SCHWEliCER MEMBER 1:

LOCATION:

18 MI SE OF WILMINGTON, DEL LIC. LA.:

J. ITE MEMBER 2:

(

REGIDH:

1 AE:

BECH COUNSEL:

R. 6JDDARD CONST. INSP S. FOLSOM REAC. TYPE: BWR HSSS: GE ANTITRUST:

RESID. INSP:

DESIGN PWR: 3440 MWT/1067 MWE CONST BECH RM ANALYST:

B. ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE FSAR was tendered on March 2, 1983 and docketed on June 29, 1983.

ER DOCKETED:

06/29/83 06/29/83C ER SITE VISIT COMPLETE:

07/28/83 INPUT TO DES TO PM:

04/13/84 ISSUE DES:

06/15/84 RESPONSE TO COMMENTS ON DES:

ISSUE FES:

11/16/84 CURRENT ENV. STATUS:

ER was tendered on March 2, 1983 and docketed on June 29, 1983.

SAFETY / HEARING MILESTONES:

APPLICATI0H TENCERED:

03/31/83 03/02/83C SAR DOCKETED:

06/29/83 06/29/83C SAR O'S RECEIVED BY PM:

08/22/83 SAR APPL. RESPONSE TO Q'S RECEIVED: 10/31/83 CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

01/23/84 Notice of Opportunity for Hearing is to be published in ISSUE DRAFT SER:

02/21/84 the Federal Register.

INPUT TO SER:

08/20/84 ISSUE SER:

10/12/84 ACRS FULL COMMITTEE MEETING:

11/00/84 INPUTS TO SE SUPPLEMENT 18 01/01/85 ISSUE SE SUPPLEMENT 12 02/15/85 FEMA LETTER RECEIVED:

CURRENT ANTITRUST:

Status to be determined.

HEARING STARTED:

07/15/85 ASLB INITIAL DECISIDH 01/00/86 COMMISSION EFFECTIVENESS DECISION: 01/00/86 TECH SPECS COMPLETED:

COMMISSIDH DECISIDH:

01/00/86 ISSUE LIC. WITH' POWER RESTRICTION:

ISSUE FULL POWER LICENSE AMEND:

LATEST AMENDMENT:

SCHED. DATE RECEIPT DATE HEW SLIPS /HOTES:

CONSTRUCTION COMPLETION - APPL.:

01/14/86 06/30/82

NRR LICEN$ING SYSTEM PACE NO: 2-14 LASALLE 2 0L CURRENT

$TATUS REP 0RT REPORT AS OF 07/30/80 PLANT C H A R A C T E R I S T I C S:

KEY P E R S 0 N N E L:

DOCKET NO:

05008374 LIC. PM:

A. BOURNIA ASLB CHAIR:

M. MILLER APPLICANT:

COMMONWEALTH EDISON LIC. BC:

A.

SCHWENCER MEMBER 1:

F. SHON LOCATION:

11 MI SE OF OTTAWA, ILL LIC. LA.:

E. HYLTON MEMBER 28

0. PARIS REGIOH:

3 AE:

Stl COUNSEL:

C. WOODHEAD CONST. INSP H. WESCOTT REAC. TYPE: BWR HSSS: CE ANTITRUST:

B. V0GLER RESID. INSP W. GULDEMOND DESIGN PWR 3293 MWT/1078 MWE CONST CWE RM ANALYST:

S. HEDLUND CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SSER-1 was issued in June 1981.

SSER-2 was issued in February 1982.

SSER-3 was issued on April 16, 1982.

ER DOCKETED:

01/17/77 05/12/77C SSER-4 was issued on July 14, 1982.

SSER-5 is scheduled ER SITE VISIT COT 1PLETE:

for 07/83.

INPUT TO DES TO PM:

02/17/78 02/17/78C ISSUE DES:

03/22/78 03/29/78C RESPONSE TO COMMENTS ON DES:

07/14/78 07/14/78C ISSUE FES:

09/22/78 11/03/78C CURRENT ENV. STATUS:

Environmental Protection Plan has been issued with Unit 1 licerse.

SAFETY / NEARING MILESTONES:

APPLICATION TENDERED:

09/01/76 09/01/76C SAR DOCKETED:

04/08/77 05/12/77C SAR Q'S RECEIVED BY PM:

07/22/77 07/27/77C SAR APPL. RESPONSE TO 9'S RECEIVED: 12/15/77 08/18/78C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

10/06/78 11/08/78C Ho hearing.

ISSUE DRAFT SER:

i INPUT TO SER:

12/29/78 02/27/81C ISSUE SER:

09/05/80 03/05/81C ACRS LETTER RECEIVED:

04/09/81 04/16/81C INPUTS TO SE SUPPLEMENT 58 07/20/83 07/20/83C ISSUE SE SUPPLEMENT 58 07/29/83 FEMA LETTER RECEIVED:

CURRENT ANTITRUST I

Complete.

HEARING STARTED:

N/A f

ASLB INITIAL DECISION:

N/A COMMISSION EFFECTIVENESS DECISION:

TECH SPECS COMPLETED:

04/12/82 04/12/82C COMMISSION DECISION:

09/00/83 ISSUE LIC. WITH POWER RESTRICTION: N/S f

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

10/00/83 S H D. DATE RECEIPT DATE NEW SLIPS / NOTES:

Lasalle Unit 1 criticality was achieved on June 21, 1982.

CONSTRUCTION COMPLETION - APPL.:

10/00/83 02/01/83 Construction completion date for Unit 2 has been reassessed by applicant and has slipped to IA/83.

NRR LICEN$ING SY$ TEM PAGE NO: 2-15 LIMERICK 1 &2 0L CURRENT STATUS REP 0RT REPORT AS OF 07/30/80 PLANT CHARACTERISTICSt KEY PERSONNEL:

DOCKET NO:

035280353 LIC, PM:

R. MARTIN ASLB CHAIR:

L. BRENNER APPLICANT:

PHILADELPHIA ELECTRIC LIC. BC:

A. SCHWENCER MEMBER 1 R. COLE LOCATION:

35 MI NW OF PHILADELPHIA, PA LIC. LA.:

E. NYLTON MEMBER 2:

P. MORRIS REGION:

1 AE:

BECH COUNSEL:

A. HODGDON CONST. INSP:

REAC. TYPE: BWR HSSS: GE ANTITRUST:

B. V0GLER RESID. INSP: S. CHAUDNARY DESIGN PWR 3440 MWT/1065 MWE CONST: BECH RM ANALYST:

L. LANIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Applicant submitted Probabilistic Risk Assessment with FSAR on March 17, 1981 SAR was docketed on 07/27/81 ER DOCKETED:

07/27/81 07/27/81C NUREG/CR on PRA issued by Board Notification on 03/04/83.

ER SIlE VISIT COMPLETE:

08/20/82 08/20/82C INPUT TO DES TO PM:

06/10/83 06/10/83C ISSUE DES:

06/24/83 06/24/83C RESPONSE TO COMMENTS ON DES:

10/06/83 ISSUE FES:

03/00/84 CURRENT ENV. STATUS:

ER was docketed on 07/27/81. DES ulll be issued in two parts (June & Oct. '83).

The second part will address SAFETY / HEARING MILESTONES:

impacts by severe accidents and will be based on applicants severe accidents risk assessment submitted April 21, 1983.

APPLICATION TENDERED:

01/00/81 03/17/81C SAR DOCKETED:

07/27/81 07/27/81C SAR Q'S RECEIVED BY PM:

07/08/82 02/01/83C SAR APPL. RESPONSE TD Q'S RECEIVED: N/S CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

N/S Hotice of Opportunity of Hearing was published in the ISSUE DRAFT SER:

N/S i

Federal Register on August 21, 1981.

A special prehearing INPUT TO SER:

N/S conference addressing conditionally admitted contentions ISSUE SER:

08/30/83 was held 05/09/83. Actions were specified by the Board for all parties.

ACRS FULL COMMITTEE MEETING:

10/13/83 INPUTS TO SE SUPPLEMENT 1 10/07/83 ISSUE SE SUPPLEMENT 1 10/30/83 FEMA LETTER RECEIVED:

10/07/83 CURRENT ANTITRUST:

Status to be determined.

HEARING STARTED:

01/00/84 ASLB INITIAL DECISION:

03/00/85 COMt11SSION EFFECTIVENESS DECISION: 03/00/85 TECH SPECS COMPLETED:

03/00/85 COMMISSION DECISION:

03/00/85 ISSUE LIC. WITH POWER RESTRICTION: 03/00/85 LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

03/00/85 Rev. 13, June 17, 1983 (ER OL); Rev. 21, June 30, '983 (FSAR); Rev. 5, March 31, 1983 (EP), Rev 3 April 30, 1983 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

Applicant estimates 2 month improvement in construction CONSTRUCTION COMPLETION - APPL.

08/00/84 12/27/82 completion schedule. ASLB estimates that 17 months are necessary for hearing.

i NRR LICENSING SYSTEM PAGE NO: 2-16 MARBLE HILL 1 82 0L CURREHT STATUS REPORT REPORT AS OF 07/30/80 PLAHT CHARACTERISTICSt KEY PERS0NNEL DOCKET NO:

054680547 LIC. PM:

P. O CONNOR ASLB CHAIR:

I. SMITH APPLICANT:

PUBLIC SERVICE OF INDIANA LIC. BC:

J. YOUNGBLOOD MEMBER 1:

G. LINENBERGER LOCATION:

10 MI S OF MADISON, IN LIC. LA.:

M. RUSHBROOK MEMBER 28

0. PARIS REGION:

3 AE:

58L COUNSEL:

E. CHEN CONST. INSP P. PELKE REAC. TYPE: PWR HSSS: WEST ANTITRUST J. RUTBERG RESID. INSP: J. SCHAPKER DESIGN PWR: 3415 MWT/1130 MWE CONST: PSI RM ANALYST S. HEDLUND CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Application was docketed on 02/25/83.

ER DOCKETED:

03/01/83 02/25/83C ER SITE VISIT COMPLETE:

07/11/83 07/11/83C INPUT TO DES TO PM:

03/30/84 ISSUE DES:

05/30/84 RESPONSE TO COMMENTS ON DES:

ISSUE FES:

11/30/84 CURRENT ENV. STATUS:

Application was docketed on 02/25/83. ER site visit completed on 07/11/83.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

12/01/82 11/23/82C SAR DOCKETED:

03/01/83 02/25/83C SAR Q'S RECEIVED BY PM:

08/15/83 SAR APPL. RESPONSE TO Q'S RECEIVED: 12/02/83 CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

03/02/84 An Atomic Safety and Licensing Board was established on ISSUE DRAFT SER:

04/06/84 4/26/83.

Three petition, for a hearing have been INPUT TO SER:

10/05/84 received.

ISSUE SER:

12/07/84 ACRS FULL COMMITTEE MEETING:

01/10/85 INPUTS TO SE SUPPLEMENT 1:

03/01/85 ISSUE SE SUPPLEt1ENT 18 04/15/85 FEMA LETTER RECEIVED:

CURRENT ANTITRUST:

Notice of a receipt of antitrust information at OL HEARING STARTED:

09/15/85 ASLB INITIAL DECISION:

05/15/86 stage published 4/6/83.

COMf11SSION EFFECTIVENESS DECISI0H: 06/00/86 TECH SPECS COMPLETED:

06/00/86 COMMISSIDH DECISIGHz 06/00/86 ISSUE LIC. WITH POWER RESTRICTION:

ISSUE FULL POWER LICENSE AMEND:

LATEST AMENDMENT:

Amendment 25 (05/16/83)

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION CD';PLETION - APPL. :

06/00/86 12/15/82

1 NRR LICENSING SY$ TEM PAGE NO: 2-17 MIDLAND 1 42 0L CURRENT STATUS REPORT REPORT AS OF: 07/30/80 PLANT-C H A R A C T E R I S T I C S:

KEY PERS0NNELa DOCKET NO:

033080329 LIC PM:

D. HOOD ASLB CHAIR: C.'BECHHOEFER APPLICANT:

CONSUt1ERS POWER LIC. BC E. ADENSAM MEMBER 1:

F. COWAN LOCATION:

SW BOUNDARY OF MIDLAND. MICH.

LIC. LA.:

M. DUNCAN MEMBER 28 J. HARBOUR REGION:

3 AE:

BECH COUNSEL:

W. PATON CONST. INSP: R. LANDSMAN REAC. TYPE: PWR HSSS: BtW ANTITRUST:

B. V0GLER RESID. INSP: R. COOK DESIGN PWR: 2452 MWT/0818 MWE CONST: BECH RM ANALYST:

B. ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Utilization of National Laboratories or other agencies to complete some review areas is currently ER DOCKETED 04/01/78 04/14/78C in progress. CP extension was issued 12/28/81. ACRS ER SITE VISIT COMPLETE:

09/08/78 09/08/78C Full Committee Meeting was held 06/04/82.

SSER 81 INPUT TO DES TO PM:

02/03/82 02/03/82C responding to ACRS letter was issued 6/30/82.

SSER 82 ISSUE DES:

02/05/82 02/05/82C on soils settlement problems was issued 10/06/82.

RESPONSE TO COMMENTS ON DES:

07/08/82 07/08/82C l

ISSUE FES:

07/30/82 07/30/82C CURRENT ENV. STATUS:

l The DES was issued 02/05/82. The FES was issued on July 30. 1982.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

08/31/77 08/31/77C SAR DOCKETED:

09/30/77 11/18/77C SAR Q'S RECEIVED 8Y PM 03/20/78 10/02/78C SAR APPL. RESPONSE TO Q'S RECEIVED: 12/08/78 12/08/78C i

CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

11/01/78' 12/01/78C Three prehearings ending 04/27-28/81 were held for a ISSUE DRAFT SER:

N/A separate hearing on soils settlement. Hearing on soils INPUT TO SER:

04/23/82 04/23/82C settlement began July 7, 1981 and is continuing. Combined ISSUE SER:

05/11/82 05/11/82C hearings for soils issues and OL issues commenced on 11/15/82 and are continuing.

ACRS LETTER RECEIVED:

06/15/82 06/08/82C INPUTS TO SE SUPPLEMENT 28 08/16/82 08/16/82C ISSUE SE SUPPLEMENT 2:

10/06/82 10/06/82C FEMA LETTER RECEIVED:

G1/14/83 01/14/83C 1

CURRENT ANTITRUST:

Proceeding completed. License was amended 10/20/80.

HEARING STARTED:

11/15/82 11/15/82C ASLB INITIAL DECISION:

09/00/84 COMMISSION EFFECTIVENESS DECISION: 10/00/d4 TECH SPECS COMPLETED:

09/00/84 COMMISSION DECISI0H:

09/00/84 ISSUE LIC. WITH POWER RESTRICTION: 09/00/83 LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

10/00/84 110 SCHED. DATE RECEIPT DATE HEW SLIPS / NOTES:

Applicant announced revised completion schedule on 4/12/83.

CONSTRUCTION COMPLETION - APPL.:

10/00/84 04/12/83 Unit 2 slipped 14 mos. to 10/84, and unit I slipped 13 mas, to February 1985. MRC caseload visit conducted April 19-21. 1983.

i

NRR LICEN5ING SY$ TEM PAGE N08 2-18 MILLSTONE 3 0L CURRENT STATUS REP 0RT REPORT AS OF 07/S3/80 PLANT CHARACTERISTICS:

KEY PERSONNEL:

DOCKET NO:

05000423 LIC. PM:

E. D00LI1TLE ASLB CHAIR: N/A APPLICANT:

MORTHEAST NUCLEAR ENERGY LIC. BC:

B. YOUNGBLOOD MEhBER 1:

N/A LOCATION:

3.2 MI WSW OF HEW LONDON CT.

LIC. LA.:

M. RUSHER 00K MEMBER 28 M/A REGION:

1 AE:

58W COUhSEL:

M. ROTHSCHILD CONST. INSP REAC. TYPE: PWR NSSS: WEST ANTITRUST B. V0GLER RESID. INSP T. REBELOWSKI DESIGN PWR: 3565 MWT/1156 MWE CONST: S8W RM ANALYST:

L. LANIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Safety review questions sent to applicant on 05/03/83.

ER DOCKETED:

02/01/83 02/03/83C ER SITE VISIT COMPLETE:

07/21/83 07/21/83C INPUT TO DES TO PM:

ISSUE DES:

04/17/84 RESPONSE TO COMMENTS ON DES:

ISSUE FES:

11/16/84 CURRENT ENV. STATUS:

Environmental site visit completed on 07/20 and 07/21/83.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED 11/01/82 10/29/82C SAR DOCKETED:

02/01/83 02/03/83C i

SAR Q'S RECEIVED BY PM:

08/15/83 SAR APPL. RESPONSE TO G'S RECEIVED: 09/01/83 CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

11/01/83 Notice of Opportunity for Hearing was published in the ISSUE DRAFT SER:

12/01/83 Federal Register on March 4, 1983.

No requests for INPUT TO SER:

05/15/84 hearing or petitions for leave to intervene were received.

ISSUE SER:

07/16/84 i

ACRS FULL COMMITTEE MEETING:

08/15/84 INPUTS TO SE SUPPLEMENT 1:

10/15/84 ISSUE SE SUPPLEMENT 1 11/15/84 FEMA LETTER RECEIVED:

CURRENT ANTITRUST:

HEARING STARTED:

N/A ASLB INITIAL DECISION:

N/A COMMISSION EFFECTIVENESS DECISION: 16/00/85 TECH SPECS COMPLETED:

11/00/85 COMMISSION DECISION:

11/01/85 ISSUE LIC. WITH POWER RESTRICTION:

ISSUE FULL POWER LICENSE AMEND:

LATEST AMENDMENT:

Amendment 2 to FSAR received 04/21/83. Amendment 2 to SCHED. DATE RECEIPT DATE ER received 04/21/83.

NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.:

11/01/85 09/30/82

HRR LICEN5IHG SYSTEM PAGE HO: 2-19 HINE MILE POINT 2 0L CURREHT STATUS REPQRT REPORT AS GF. 07/30/80 PLAHT CHARACTERISTICSt KEY P E R S 0 N H E L:

l DOCKET NO:

05000410 LIC. PM:

M. HAUGHEY ASLB CHAIR:

APPLICANT:

NIAGARA MOHAWK POWER LIC. BC:

A.

SCHWENCER MEMBER 1:

LOCATION:

8 MI NE OF OSWEGO. NY LIC.

LA.'

E. HYLTON MEMBER 2:

REGION:

1 AE:

$2W COUNSEL:

B. BORDENICK CONST. INSP: L. HARROW REAC. TYPE: BWR NSSS: GE ANTITRUST:

L. DEWEY RESID. INSP:

DESIGN PWR 3459 MWT/1080 MWE CONST: 58W RM ANALYST:

B. ST MARY CURRENT SAF. ST4TUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE l

The FSAR w2s tendered on 01-31-83 and docketed on 04/12/83.

I ER DOCKETED:

03/31/83 04/12/83C ER SITE VISIT COMPLETE:

08/05/83 INPUT TO DES TO PM:

05/18/84 ISSUE DES:

07/20/84 RESPONSE TO COMMENTS ON DES:

ISSUE FES:

12/14/84 CURRENT ENV. STATUS:

The ER was tendered on 01-31-83 and docketed on 04/12/83.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

01/31/83 01/31/83C SAR DOCKETED:

03/31/83 04/12/83C SAR Q'S RECEIVED BY PM:

N/S SAR APPL. RESPONSE TO Q'S RECEIVED: 10/27/83 1

l CU" RENT HRG. S T A T U S':

INPUT TO DRAFT SER TO PM:

01/19/84 Notice of Opportunity for Hearing was published in the ISSUE DRAFT SER:

02/16/84 Federal Registe on 05/13/83.

INPUT TO SER:

08/06/84 ISSUE SER:

10/05/84 ACRS FULL COMMITTEE MEETING:

11/08/84 INPUTS TO SE SUPPLEMENT 1:

12/01/84 ISSUE SE SUPPLEMENT 1:

01/00/85 FEMA LETTER RECEIVED:

CURRENT ANTITRUST:

HEARING STARTED:

06/17/85 ASLB INITIAL DECISION:

02/14/86 C0!1 MISSION EFFECTIVENESS DECISION: 02/00/86 TECH SPECS COMPLETED:

02/00/86 t

COMMISSION DECISION:

02/28/86 l

ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

SCHED. DATE RECEIPT DATE NEW SLIPS /HOTES:

CONSTRUCTION COMPLETION - APPL.:

02/00/86 01/31/83

NRR LICEN$ING SYSTEM PATE NO: 2-20 PALO VERDE 1,2,3 0L CURRENT STATUS REP 0RT REPORT AS OF 07/30/80 PLANT C H A R A C T E R I S T I C S:

KEY P E R S 0 N N E L:

DOCKET NO:

0528-0530 LIC. PM:

E. LICITRA ASLB CHAIR:

R. LAZO APPLICANT:

ARIZONA PUBLIC SERVICE LIC. BC:

G. KNIGHTON MEMBER 1:

R. COLE LOCATION:

36 MI W OF PHOENIX, AZ LIC. LA.:

J. LEE MEMBER 2:

D. CALLINAN REGIDH 5

AE BECH COUNSEL:

L. DEWEY CONST. INSP: L. VBRUEGGEN REAC. TYPE: PWR NSSS: COMB ANTITRUST B. V0GLER RESID. INSP: G. FIORELLI DESIGN PWR: 3817 MWT/1304 MWE CONST: BECH RM ANALYST:

S. HEDLUND CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Several " Independent Design Review" meetings have been completed. The SER was issued on November 11, 1981.

SER ER DOCKETED:

07/01/80 06/20/80C supplement Nos.

1,2, and 3 were issued on February 5, 1982 ER SITE VISIT COMPLETE:

01/30/81 01/30/81C and May 17, 1982, and September 23, 1982 respectively.

INPUT TO DES TO PM:

10/05/81 10/05/81C Supplement No. 4 was issued on March 15, 1983.

Supplement ISSUE DES:

10/26/81 10/26/81C i

No. 5 is targeted for 8/31/83.

RESPONSE TO COMMENTS ON DES:

02/25/82 02/25/82C ISSUE FES:

03/11/82 03/11/82C CURRENT ENV. STATUS:

The ER (OL) review is complete. A site visit was completed on January 30, 1981.

The DES was issued on SAFETY / HEARING MILESTONES:

October 26, 1981 and the FES was issued on March 11, APPLICATION TENDERED:

10/05/79 10/05/79C 1982.

SAR DOCKETED:

06/20/80 06/20/80C SAR Q'S RECEIVED BY PP:

SAR APPL. RESPONSE TO Q'S RECEIVED:

INPUT TO DRAFT SER TO PM:

CURRENT HRG. STATUS:

The hearing started 4/27-30, 1982, resumed on 5/25-28 and ISSUE DRAFT SER:

on 6-22.

Hearing record was closed on 6-25-82.

A late INPUT TO SER:

10/30/81 10/30/81C petition, dated 10-13-82 dealing with salt drift on ISSUE SER:

11/11/81 11/11/81C farm crops, was filed by W. Valley Agri. Protection Council. On 12-30-82, the Board issued a favorable ID ACRS LETTER RECEIVED:

12/18/81 12/18/81C INPUTS TO SE SUPPLEMENT 5:

08/15/83 but reopened the hearing on Units 2 and 3 to consider late petition by W. Valley. Board's decision authorizes ISSUE SE SUPPLEMENT 5:

08/31/83

,t FEMA LETTER RECEIVED:

N/S full power license for Unit 1.

HEARING STARTED:

04/27/82 04/27/82C CURRENT ANTITRUST:

Antitrust OL review has resulted in a finding of no ASLB INITIAL DECISIDH:

12/30/82 12/30/82C significant antitrust changes since CP review.

A COMMISSION EFFECTIVENESS DECISION: 04/27/83 04/27/83C Federal Register of the finding was published 2-9-83.

TECH SPECS COMPLETED:

08/01/83 COMMISSIDH DECISION:

08/00/83 ISSUE LIC. WITH POWER RESTRICTION: 08/01/83 ISSUE FULL POWER LICENSE AMEND:

08/20/83 LATEST AMENDMENT:

FSAR Amendment No. 11 SCHED. DATE RECEIPT DATE ER Supplement No. 4 NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.:

08/00/83 07/13/82

i i

i NRR LICENSING SY$ TEM PAGE NO: 2-21 PERRY 1 & 2 OL CURRENT STATUS REPORT REPCRT AS OF 07/30/80 PLANT CHARACTERI5 TIC 5 KEY PERS0NNEL DOCKET ND:

044080441 LIC. PM:

J. STEFANO ASLB CHAIR:

P. BLOCH APPLICANT:

CLEVELAND ELECTRIC ILLUMINATING LIC. BC:

J. YOUNGBLOOD MEMBER 12 J. KLINE LOC 4 TION:

7 MI NE OF PAINESVILLE, OHIO LIC. LA.:

M. RUSHBROOK MEMBER 2 G. BRIGHT REGION:

3 AE GIL COUNSEL:

J. CUTCHIH CONST. INSP: P. PELKE REAC. TYPE: BWR HSSS: GE ANTITRUST:

J. CUTCHIN RESID. INSP M. GILDNER DESIGH PWR: 3759 MWT/1205 MWE CONST KAISER RM ANALYST:

S. HEDLUND CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE i

The Safety Evaluation Report was issued in May 1982.

The ACRS Report was issued on July 13, 1982.

SSER Ho. 1 ER DOCKETED:

06/26/81 06/19/81C was issued in August 1982.

SSER Ho. 2 was issued in ER SITE VISIT COMPLETE:

Jan. 1983.

SSER Ho. 3 was issued in 4/83.

SSER No. 4 is INPUT TO DES TO PM:

01/01/82 01/01/82C l

scheduled for November, 1983.

ISSUE DES:

02/26/82 02/26/82C RESPONSE TO COMMENTS ON DES:

06/30/82 06/30/82C ISSUE FES:

08/13/82 08/13/82C l

CURRENT ENV. STATUS:

Environmental acceptance review was completed on June i

9, 1981 The ER was docketed June 19, 1981.

FES SAFETY / HEARING MILESTONES 4 issued in August 1982.

APPLICATION TENDERED:

06/26/80 06/26/80C SAR DOCKETED:

01/09/81 01/30/81C SAR Q'S RECEIVED BY PM:

SAR APPL. PESPONSE TO O'S RECEIVED:

}

CURRENT HRG. STATUS:

IMPUT TO DRAFT SER TO PM:

02/24/82 02/24/82C Hoaring on issue 3 (QA Const. Prog.) completed. Issues ISSUE DRAFT SER:

02/26/82 02/26/82C i

1 (EP), 13 (Turbine Missiles), 14 (In core T/C's) and 15 INPUT TO SER:

04/10/82 05/10/82C j

(Steam Erosion) N/S.

Issue 6 (ATWS-auto SLCS) and 8 (H2 ISSUE SER:

05/10/82 05/24/82C control for degraded core accident) deferred pending Comm.

rulings. All other issues deleted by summ disp.

Hearing ACRS LETTER RECEIVED:

07/13/82 07/13/82C on issue (3) completed 4/29/83.

Favorable Board decision INPUTS TO SE SUPPLEMENT 4:

10/30/83 expected on issue 3.

ISSUE SE SUPPLEMENT 4 11/30/83 FEf1A LETTER RECEIVED:

12/00/83 3

CURRENT ANTITRUST:

1 CP antitrust review has been completed. OL antitrust HEARING STARTED:

05/23/83 05/23/83C status is under review.

ASLB INITIAL DECISION:

03/08/84 COMMISSIDH EFFECTIVENESS DECISIDH: 04/00/Fi TECH SPECS COMPLETED:

10/00/84 COMMISSIDH DECISION:

11/00/84 ISSUE LIC. WITH POWER RESTRICTION: 12/00/84 LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

N/S Humber 11 (2-15-83).

i SCHED. DATE RECEIPT DATE HEW SLIPS /HOTES:

FE!1A Letter of 4/28/83 schedules completion of offsite CONSTRUCTION COMPLETION - APPL.:

12/00/84 03/08/83 emergency plan review by 12/83.

HRR LICEN5ING SYSTEM PAGE N02 2-22 RIVER BEND 1 82 0L CURRENT STATUS REP 0RT REPORT AS OF 07/30/89 PLANT CHARACTERISTIC 5:

KEY PERS0NNEL

(

DOCKET NO:

045880459 LIC PM:

E. WEINKAM ASLB CHAIR:

B. COTTER APPLICANT

  • GULF STATES UTILITIES LIC. BC:

A. SCHWENCER MEMBER 1 G. LINENBERGER l

LOCATION:

24 MI NNW OF BATON ROUGE, LA LIC. LA.:

E. HYLTON MEMPER 2:

R. COLE REGION:

4 AE:

S8W COUNSEL:

D. REPKA CONST. INSP:. UNASSIGNED REAC. TYPE: BWR HSSS: GE ANIITRUST:

B. V0GLER RESID. INSP: R. BROWN DESIGN PWR: 3015 MWT/0934 MWE CONST: 58W RM ANALYST:

L. LAHIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE I

Applicant tendered FSAR for docketing on 04/24/81.

FSAR was docketed on 08/25/81. Draft SER issued 06/01/83.

ER DOCKETED:

08/25/81 08/25/81C Construction permit extension requested and granted from ER SITE VISIT COMPLETE:

01/22/82 01/22/82C 03/83 to 12/85 for unit 1.

INPUT TO DES TO PM:

12/09/83 ISSUE DES:

01/09/84 RESPONSE TO COMMENTS ON DES:

ISSUE FES:

06/08/84 CURRENT ENV. STATUS:

Applicant tendered ER for docketing on 04/24/81.

?

ER was docketed on 08/25/81. DES targeted for 01/09/84.

SAFETf/ HEARING MILESTONES:

APPLICATION TENDERED:

04/24/81 04/24/81C SAR DOCKETED:

08/25/81 08/25/81C SAR Q'S RECEIVED BY PM:

12/07/81 06/01/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 05/14/82 12/01/82C INPUT TO DRAFT SER TO PM:

03/04/83 03/30/83C CURRENT HRG. STATUS:

Notice of Opportunity for Hearing was pubIlshed in the ISSUE DRAFT SER:

04/30/83 06/01/83C Federal Register on 09/04/81. Prehearing conference INPUT TO SER:

11/04/83 held 06/14/83 in Baton Rouge, La.

Board order due by ISSUE SER:

12/02/83 08/01/83.

ACRS FULL COMMITTEE MEETING:

01/13/84 INPUTS TO SE SUPPLEMENT 1:

04/00/84 ISSUE SE SUPPLEMENT 12 05/00/84 FEMA LETTER RECEIVED:

05/01/84 CURRENT ANTITRUST:

NEARING STARTED:

10/00/84 Status to be determined.

ASLB INITIAL DECISION:

03/00/85 C0t1 MISSION EFFECTIVENESS DECISION: 04/00/85 r

TECH SPECS COMPLETED:

10/00/84 COMMISSION DECISION:

04/00/85 ISSUE LIC. WITH POWER RESTRICTION:

ISSUE FULL POWER LICENSE AMEND:

04/00/85 LATEST AMENDMENT:

Humber 9.

SCHED. DATE RECEIPT DATE Amendment to to FSAR due by August, 1983.

ER-OL Supplement CONSTRUCTION COMPLETION - APPL.:

04/08/85 01/14/83 NEW SLIPS / NOTES:

5 due in August, 1983.

l NRR LICEN5ING SYSTEM PAGE NO: 2-23 SAN ONOFRE 3 LIC CURRENT STATUS REP 0RT REPORT AS OF 07/30/80 PLANT CHARACTERISTICSt KEY PERS0NNEL:

I DOCKET NO:

05000362 LIC. PM:

H. ROOD ASLB CHAIR:

J. KELLEY APPLICANT:

SOUTHERN CALIFORNIA EDISON LIC. BC:

G. KNIGHTON MEMBER 1:

C. HAND LOCATION:

5 MI S OF SAM CLEMENTE, CA LIC. LA.:

J. LEE MEMBER 2:

E. JOHNSON REGION:

5 AE BECH COUNSEL:

L. CHANDLER CONST. INSP D. KIRSCH REAC. TYPE: PWR NSSS: COMB ANTITRUST:

J. GOLDBERG RESID. INSP: A. CHAFFEE l

DESIGN PWR: 3410 MWT/1100 MWE CONST: BECH RM ANALYST L. LAHIER i

CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SER on geological and seismological matters was issued on i

12/31/80. ACRS subcommittee meetings were held 01/30/81 and ER DOCKETED:

03/01/77 03/23/77C 03/11/81 and full committee meetings were held 02/5/81 and ER SITE VISIT COMPLETE:

05/20/77 05/20/77C 03/12/81. SER (Hon-TMI matters), was issued on 02/06/81.

INPUT TO DES TO PM:

10/01/77 12/01/80C SER supplement on TMI issues was issued on 02/25/81 SER ISSUE DES:

01/27/78 01/20/81C supplement No. 2, 3, 4, 5, and 6 addressing open items were RESPONSE TO COMMENTS ON DES:

l issued 05/08/81, 09/16/81, 01/22/82, 02/16/82, and 06/30/82.

ISSUE FES:

04/00/81 04/29/81C CURRENT ENV. STATUS:

DES addressing class 9 accidents was issued 01-20-81, FES was issued 04-29-81.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

11/09/76C SAR DOCKETED:

03/01/77 03/23/77C SAR Q'S RECEIVED BY PM:

08/15/77 09/29/77C SAR APPL. RESPONSE TO Q'S RECEIVED: 11/18/77 12/08/77C i

l CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

02/10/78 08/11/78C Motions for summary disposition were granted by ASLB.

ISSUE DRAFT SER:

01/15/81 01/15/81C Hoaring started 06/22/81 and ended 09/31/81.

ASLB PID INPUT TO SER:

06/23/78 01/15/81C was rendered on 01/11/82 and ID on 05/14/82. A5 LAB ISSUE SER:

08/01/80 02/06/81C Decision (ALAB-717) was issued on 03/04/83.

i ACRS LETTER RECEIVED:

03/17/81 03/17/81C INPUTS TO SE SUPPLEMENT 62 04/21/83 ISSUE SE SUPPLEMENT 6:

06/30/82 06/30/82C FEMA LETTER RECEIVED:

12/01/81 12/01/81C CURRENT ANTITRUST:

The antitrust review is complete.

HEARING STARTED:

06/22/81 06/22/81C ASLB INITIAL DECISI0Hz 05/14/82 05/14/82C COMMISSION EFFECTIVEMESS DECISIDH 05/14/82 05/14/82C TECH SPECS COMPLETED:

11/15/82 11 ' 15/82C COMMISSIDH DECISION:

10/00/83 ISSUE LIC. WITH POWER RESTRICTIDM 11/15/82 11/)5/82C i

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

10/08/83 i

SCHED DATE RECEIPT DATE HEW SLIPS /HOTES:

CONSTRUCTION COMPLETION - APPL.:

11/15/82C 09/27/82 1

1 e

NRR L I.C E N 5 I N G SYSTEM PAGE NO: 2-24 SEABROOK 182 0L CURRENT STATUS REP 0RT REPORT AS OF: 07/30/80 j

PLANT C H A R A C T E R I 5 T I C S:

KEY P E R S 0 N N E L:

DOCKET NO:

844380444 LIC. PM:

L. WHEELER ASLB CHAIR:

H. H0YT APPLICANT:

PUBLIC SERVICE OF NEW HAMPSHIRE LIC. BC:

G. KNIGHTON MEMBER 1:

E. LUEBKE LOCATION:

13 MI $ OR PORTSMOUTH, NH LIC. LA.:

J. LEE MEMBER 2 J. HARBOUR REGICH:

1 AE UEC COUNSEL:

R. LESSY CONST. INSP: A. TOTH REAC. TYPE: PWR NSSS: WEST ANTITRUST:

B. V0GLER RESID. INSP A. CERNE DESIGN PWR: 3411 MWT/1198 MWE CONST: UEC RM ANALYST:

B. ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE The FSAR acceptance review was completed in September 1981 The FSAR was docketed October 5, 1981.

Applicant has ER DOCKETED:

10/05/81 10/05/81C responded to round 1 Q's.

SER was issued 03/07/83. ACRS ER SITE VISIT COMPLETE:

12/02/81 12/02/81C subcommittee meeting was held April 1-2, 1983.

ACRS INPUT TO DES TO PM:

03/01/82 03/01/82C full committee meeting was held on April 15, 1983.

The ISSUE DES:

05/14/82 05/14/82C ACRS letter is contained in SSER 2 which was issued RESPONSE TO COMMENTS ON DES:

08/18/82 09/15/82C 06/30/83.

ISSUE FES:

12/08/82 12/08/82C CURRENT ENV. STATUS:

2 ER was tendered June 1981.

ER acceptance review was completed September 1981 The ER was docketed SAFETY / HEARING MILESTONES:

October 5, 1981 DES was issued in May, 1982.

FES was issued in December 1982.

APPLICATION TENDERED:

06/29/81 06/29/8tC SAR DOCKETED:

10/05/81 10/05/81C SAR Q'S RECEIVED BY PM:

01/20/82 03/05/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 03/12/82 04/13/82C INPUT TO DRAFT SER TO PM:

05/07/82 10/08/82C CURRENT HRG. STATUS:

Notice for Opportunity for Hearing was published in ISSUE DRAFT SER:

07/30/82 08/13/82C the Federal Register on October 19, 1981 Prehearing INPUT TO SER:

18/30/82 12/29/82C conferences were held May 6-7, 1982, July 15-16, 1982 ISSUE SER:

01/12/83 03/07/83C and April 7-8, 1983.

ASLB Drder identifying parties, contentions and prehearing schedule was issued September ACRS LETTER RECEIVED:

02/17/83 04/19/83C 13, 1982. Hearings will begin in August, 1983.

INPUTS TO SE SUPPLEMENT 12 N/S ISSUE SE SUPPLEMENT 13 03/07/83 06/30/83C FEMA LETTER RECEIVED:

09/00/83 CURRENT ANTITRUST:

HEARING STARTED:

08/00/83 Status to be determined.

ASLB INITIAL DECISION:

06/00/84 COMMISSION EFFECTIVENESS DECISION: N/S TECH SPECS COMPLEIED:

07/00/84 COMMISSION DECISION:

08/06/84 i

ISSUE LIC. WITd POWER RESTRICTION:

ISSUE FULL POWER LICENSE AMEND:

09/00/84 LATEST AMENDMENT:

4 48 SCHED. DATE RECEIPT DATE Fuel load slipped to 9/84 per applicant letter of 12/02/82.

CONSTRUCTIDH COMPLETION - APPL.:

09/30/84 12/02/82 HEW SLIPS / NOTES:

i l

NRR LICENSING SYSTEM PAGE N0: 2-25 SHOREHAM 0L CURRENT STATUS REPORT REPORT AS OF 07/30/80 l

PLANT CHARACTERISTIC 5:

KEY P E R S 0 N N E L:

DOCKET NO:

05000322 LIC, PM:

R. CARUSO ASLB CHAIR:

L. BRENNER APPLICANT:

LONG ISLAND LIGHTING CO.

LIC. BC:

A. SCHWENCER MEMBER la P. MORRIS LOCATION:

BROOKHAVEN. NY (LI) i LIC. LA.:

E. HYLTON MEMBER 2:

.J.

CARPENTER REGION:

1 AE SSW COUNSEL:

B. BORDENICK CONST. INSP: L. HARROW REAC. TYPE: BWR HSSS: GE ANTITRUST:

J. RUTBERG RESID. INSP: J. HIGGINS 2

DESIGN PWR 2436 MWT/0820 MWE CONST: S&W RM ANALYST:

L. LANIER i

CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTU4L DATE The ACRS meeting was held in October 1981 SER Supplement 2 was issued in March 1982.

SER 93 was ER DOCKETED:

01/26/76 01/26/76C issued 02/04/83.

ER SITE VISIT COMPLETE:

08/06/76 08/03/76C INPUT TO DES TO PM:

11/22/76 11/29/76C ISSUE DES:

03/11/77 03/24/77C RESPONSE TO COMMENTS ON DES:

07/22/77 07/22/77C ISSUE FES:

10/21/77 10/18/77C CURRENT ENV. STATUS:

i The environmental review is complete.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

09/00/75 09/04/75C SAR DOCKETED:

12/15/77 01/26/76C SAR Q'S RECEIVED BY PM:

06/09/76 07/09/76C SAR APPL. RESPONSE TO Q'S RECEIVED: 07/23/76 07/23/76C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

07/15/77 08/01/77C-The first emergency planning pre-hearing conference was ISSUE DRAFT SER:

held 7/13/83. A new safety contention regarding emergency INPUT TO SER:

03/10/81 03/10/81C diesel generators was admitted on 06/22/83. Hearings on ISSUE SER:

04/10/81 04/10/81C l

that contention are scheduled to start 08/29/83.

ACRS LETTER RECEIVED:

09/18/81 10/19/81C INPUTS TO SE SUPPLEMENT 4:

N/S ISSUE SE SUPPLEMENT 4:

08/15/83

?

FEMA LETTER RECEIVED:

N/S CURRENT ANTITRUST:

Not required.

HEARING STARTED:

05/04/82 05/04/82C ASLB INITIAL DECISION:

09/00/83 l

COMMISSION EFFECTIVENESS DECISION: 10/00/83 1

TECH SPECS COMPLETED:

08/00/83 COMMISSIDH DECISION:

10/00/83 ISSUE LIC. WITH POWER RESTRICTION: 09/00/83 LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

10/08/83 FSAR Amendment 27 i

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

1 The ASLB announced on 7/7/83 that it would not be able to CONSTRUCTION COMPLETION - APPL.:

08/08/83 03/31/83

]

issue a partial initial decision in July, 1983.

It did not give a new estimate for the PID.

l 4

E

HRR LICEHSIHG SYSTEM PAGE HO: 2-26 SOUTH TEXAS 1 82 0L CURRENT STATUS REP 0RT REPORT AS OF: 07/30/80 PLAHT C H A R A C T E R I S T I C S:

KEY P E R S 0 H H E 1:

DOCKET NO:

049880499 LIC. PM:

H.

SCHIERLING ASLB CHAIR:

C. BECHHOEFER APPLICANT:

HOUSTON LIGHTING 8 POWER COMPANY LIC. BC:

G. KNIGHTON MEMBER 1:

J.

LAMB LOCATION:

12 MI SSW OF BAY CITY, TEX LIC. LA.:

J.

LEE MEMBER 2:

E. HILL REGION:

4 AE:

BECH COUNSEL:

R. PERLIS CONST. INSP:

REAC. TYPE: PWR NSSS: WEST ANTITRUST:

B. V0GLER RESID. INSP: W. HILL DESIGN PWR: 3800 MWT/1250 MWE CONST: EBASCO RM ANALYST:

L. LANIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE BRRT has been replaced by Bechtel as the A/E.

BRRT has bcen replaced by Ebasco as the constructor.

ER DOCKETED:

07/17/78C Hon-safety related construction restarted on June 15, 1982.

ER SITE VISIT COMPLETE:

09/26/78 09/26/78C Safety related construction restarted on August 15, 1982.

INPUT TO DES TO PM:

08/00/85 Current FLD is 12/86.

Milestones now reflect a 12/86 FLD.

ISS*JE DES:

09/00/85 I

RESPONSE TO COMMENTS ON DES:

01/00/86 ISSUE FES:

02/00/86 I

I CURRENT ENV. STATUS:

Schedule revised to reflect new 12/86 FLD.

SAFETY / HEARING MILESTONES:

l APPLICATION TENDERED:

05/10/78 05/10/78C SAR DOCKETED:

07/17/78C SAR Q'S RECEIVED BY PM:

01/22/79 02/08/82C SAR APPL. RESPONSE TO Q'S RECEIVED: N/S i

CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

02/01/85 l

As provided in a Commission Order of 9/22/80, an ISSUE DRAFT SER:

02/01/85 l

expedited hearing on QA programs and management was INPUT TO SER:

11/01/85 hold.

The record of this phase of the hearing ISSUE SER:

12/01/85 was closed on June 17, 1982.

Phase II of hearing will considor all aspects of Quadrex Report.

ACRS FULL COMMITTEE MEETING:

01/00/86 Phase II is expected to begin in the Summer of '83.

INPUTS TO SE SUPPLEMENT 1:

01/00/86 ISSUE SE SUFPLEMENT 1:

01/00/86 fella LETTER RECEIVED:

N/S CURRENT ANTITRUST:

Memo and Order issued May 6, 1982 approving settlements and HEARING STARTED:

06/00/86 proposed license conditions and dismissing proceeding.

ASLB INITIAL DECISION:

11/00/86 C 0f filIS S ION EFFECTIVENESS DECISION:

12/00/86 TECH SPECS COMPLETED:

12/00/86 C0!!!!! SSI O N DECISION:

12/00/86 ISSUE LIC. WITH POWER RESTRICTION:

A LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

12/00/86 FSAR amendment #31 was i ssued 05/20/83.

ER amendment #6 was issued 12/01/82.

SCHED. DATE RECEIPT DATE NEW SLIPS /fiOTES:

All schedules now reflect new official FLD of 12/86.

CONSTRUCTION COMPLETION - APPL.

12/00/86 03/00/82

NRR LICENSING SY$ TEM PAGE NO: 2-27 SUSQUEHANNA 2 0L CURRENT STATUS REPORT REPD*T AS OF: 07/30/80 PLANT C H A R A C T E R I S T I C S:

KEY PERS0NNELa DOCKET NO:

05000388 LIC. PM:

R. PERCH ASLB CHAIR:

J. GLEASON APPLICANT:

PENNSYLVANIA POWER 8 LIGHT LIC. BC:

A.

SCHWENCER MEMBER 1:

LOCATION:

7 MI NE OF BERWICK. PA LIC. LA.:

E. HYLTON MEMBER 2:

P. PURDOM REGION:

1 AE:

BECH COUNSEL:

J. CUTCHIN CONST. INSP: L. NARROW REAC. TYPE: BWR HSSS: GE ANTITRUST:

A.

H0DGDON RESID. INSP: J. MCCANN DESIGN PWR 3440 MWT/1052 MWE CONST: BECH RM ANALYST:

L. LANIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SER was issueo 04/06/81 SSER #1 was issued 07/07/81 Post ACRS SSER 82 was issued 09/10/81 SSER #3 was ER DOCKETED:

issued 07/17/82.

SSER #4 was i ssued 11/12/82. SSER 05 ER SITE VISIT COMPLETE:

10/20/78 10/20/78C 06/10/78C was issued 3/29/83. SSER #6 is scheduled for 11/83.

INPUT TO DES TO PM:

ISSUE DES:

03/30/81 03/30/81C RESPONSE TO COMMENTS ON DES:

15/21/81 05/21/81C ISSUE FES:

06/15/81 07/02/81C CURRENT ENV. STATUS:

DES was issued on 03-30-81.

FES was issued 07-02-81 SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

06/05/78 04/10/78C SAR DOCKETED:

07/31/78 07/31/78C SAR Q'S RECEIVED BY PM:

SAR APPL. RESPONSE TO Q'S RECEIVED: N/S CURRENT HRG, STATUS:

INPUT TO DRAFT SER 10 PM:

04/07/80 04/07/80C The OL hearing is complete; Initial Decision issued on ISSUE DRAFT SER:

04-12-82.

INPUT TO SER:

03/23/81 03/23/81C ISSUE SER:

04/06/81 04/06/81C ACRS LETTER RECEIVED:

08/15/81C INPUTS TO SE SUPPLEMENT 6:

02/01/83 02/03/83C ISSUE SE SUPPLEMENT 6:

11/00/83 FEMA LETTER RECEIVED:

06/00/82 06/00/82C CURRENT ANTITRUST Complete.

HEARING STARTED:

10/06/81 10/06/81C ASLB INITIAL DECISION:

04/12/82 04/12/82C COMMISSION EFFECTIVENESS DECISION:

TECH SPECS COneLETED:

12/Ou/83 C0tMISSION DECISION:

12/00/83 ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

01/00/84 FSAR:

No. 30; ER:

No. 5 SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.:

01/00/84

N J

j NRR LICENSING SYSTEM PAGE NO: 2-28 j

V0GTLE 1 82 0L CURRENT STATUS REPORT REPORT AS OF 07/30/80 PLANT CHARACTERI5TICSt KEY PERSONNELa DOCKET NO:

0424-0425 LIC. PM:

M. MILLER ASLB CHAIRS.

APPLICANT GEORGIA POWER LIC. BC:

E. ADAMSAM MEMBER 1 LOCATION:

25 MI SSE OF AUGUSTA. GA LIC. LA.:

M. SERVICE MEM0ER 2 REGION:

2 AE:

SSC/BECH COUNSFL B. BORDENICK CONST. INSP J. RAUSCH REAC. TYPE: PWR NSSS: WEST ANTITkUST:

RESID. INSP -

DESIGN PWR 3565 MWT/1100 MWE CONST GPO RM ANALYST:

B. ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONESt-SCHED. DATE ACTUAL DATE i

FSAR was tendered on 06/30/83.

ER DOCKETED 11/08/83 ER SITE VISIT COMPLETE:

INPUT TO DES TO PM:

ISSUE DES:

07/00/84 RESPONSE TO COMMENTS ON DES:

i ISSUE FES:

01/00/85 i

CURRENT ENV. STATUS:

ER is estimated for tendering in September 1983.

SAFETY / NEARING MILESTONES:

APPLICATION TENDERED:

06/30/83 06/30/83C SAR DOCKETED:

09/00/83 SAR Q'S RECEIVED BY PM:

SAR APPL. RESPONSE TD Q'S RECEIVED:

CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

Hotice of Opportunity for Hearing is to be published in the ISSUE DRAFT SER:

08/06/84 Federal Register.

INPUT TO SER:

ISSUE SER:

04/08/85 l

ACRS FULL COMMITTEE MEETING:

05/00/85 INPUTS TO SE SUPPLEMENT 1 ISSUE SE SUPPLEMENT 18 08/00/85 FEMA LETTER RECEIVED:

l CURRENT ANTITRUST:

HEARING STARTED:

01/00/86 To be determined.

ASLB INITIAL DECISION:

97/00/86 COMMISSION EFFECTIVENESS DECISION:

TECH SPECS COMPLETED:

COMMISSION DECISION:

09/00/86 ISSUE LIC. WITH POWER RESTRICTION:

ISSUE FULL POWER LICENSE AMEND:

LATEST AMENDMENT:

SCHED. DATE RECEIPT DATE NEW SLIPS / NOTES:

CONSTRUCTION COMPLETION - APPL.:

09/00/86 12/31/81 1

9 4

NRR LICEN$ING SY$ TEM PAGE NO: 2-29 WASHINGTON NUCLEAR 1 0L CURRENT STATUS REP 0RT REPORT AS OF 07/30/80 PLANT CHARACTERISTICSt KEY P E R S O N N E La DOCKET NO:

-05000460 LIC. PM:

M. THADANI ASLB CHAIR:

H. GROSSMAN APPLICANT:

WASHINGTON PUBLIC POWER SUPPLY SYSTEM LIC. BC:

E. ADENSAM MEMBER 1:

G. BRIGHT LOCATION:

10 MI N OF RICHLAND, WA LIC. LA.:

M. DUNCAN MEMBER 2:

J. HARBOUR REGION:

5 AE UEC COUNSEL:

M. YOUNG CONST. INSP J. OLIN 1

REAC. TYPE: PWR NSSS: B8W ANTITRUST:

J. RUTBERG RESID. INSP A. TOTH DESIGN PWR 3760 MWT/1266 MWE CONST BECH RM ANALYST L. LANIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Application was tendered on 11-25-81.

Application was i

docketed on July 16, 1982.

The staff reviews will be ER DOCKETED:

07/00/82 07/16/82C performed on " manpower available" basis.

The construction ER SITE VISIT COMPLETE:

permit was amended effective 06/16/83, extending the INPUT TO DES TO PM construction completion date from 01/01/82 to 06/01/91.

ISSUE DES:

N/S RESPONSE TO COMMENTS ON DES:

ISSUE FES:

N/S i

CURRENT ENV. STATUS:

The staff reviews will be performed on " manpower available" basis.

SAFETY / HEARING MILESTONES:

9 APPLICATION TENDERED:

11/25/81 11/25/81C SAR DOCKETED:

07/00/82 07/16/82C SAR 0'S RECEIVED BY PM SAR APPL. RESPONSE TO 9'S RECEIVED:

CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM Notice of Opportunity for Hearing was published in the ISSUE DRAFT SER:

i Federal Register on August 16, 1982.

A petition to INPUT TO SER:

intervene has been received from the Coalition for ISSUE SER:

N/S Safe Power.

A prehearing conference was held l

in Richland, Wa., on January 26 and 27, 1983.

ASLB ACRS FULL COMMITTEE MEETING:

N/S denied CP amended hearing contention 01, and admitted INPUTS TO SE SUPPLEMENT 1:

CP contention 02.

The schedules t'or CP extension ISSUE SE SUPPLEMENT 18 N/S hearing are in preparation.

FEMA LETTER RECEIVED:

CURRENT ANTITRUST:

HEARING STARTED:

N/S ASLB INITIAL DECISION:

N/S l

COMMISSION EFFECTIVENESS DECISION: N/S I

TECH SPECS COMPLETED:

COMMISSION DECISION:

I ISSUE LIC. WITH POWER RESTRICTION:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

N/S l

ER amend. 1 dated 02/11/83, received 03/04/83.

SCHED. DATE RECEIPT DATE f

HEW SLIPS / NOTES:

Construction delay of fron 2 to 5 years was announced CONSTRUCTION COMPLETION - APPL.:

N/S 04/29/82 on 4/29/82.

l i

HRR LICEHSIHG SYSTEM PAGE HO: 2-30 WASHINGTON HUCLEAR 2 0L CURREHT. STATUS REPORT REPORT AS OF 07/30/80 PLANT CHARACTERISTIC 38 KEY PERS0NNELa DOCKET NO:

05000397 LIC, PM:

R. AULUCK ASLB CHAIR E. BOWERS APPLICANT:

WASHINGTON PUBLIC POWER SUPPLY SYSTEM LIC. BC:

A. SCHWENCER MEMBER 1 R. COLE LOCATION:

30 MI NW OF RICHLAND, WASH LIC. LA.:

E. HYLTON MEMBER 2:

E. HILL REGIDH:

5 AE BAR COUNSEL:

W. PATON CONST. INSP: A. TOTH REAC. TYPE: BWR HSSS: GE ANTITRUST:

B. V0GLER RESID. INSP R. FEIL DESIGH PWR 3323 MWT/tt03 MWE CONST: BECH RM ANALYST:

L. LAHIER CURRENT SAF STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SER was issued 3/31/82. Geology / Seismology reviews were included in SSER Ho. 1 issued August it, 1982.

ACRS ER DOCKETED:

02/28/77 04/20/77C meeting was held on October 7, 1982.

SSER Ho. 2 was ER SITE VISIT COMPLETE:

07/13/77 07/14/77C issued 12/21/82. SSER 83 issued on 05/20/83.

INPUT TO DES TO PM:

06/30/81 06/30/81C ISSUE DES:

07/31/81 07/31/81C RESPONSE TO COMMENTS ON DES:

09/28/81 09/28/81C ISSUE FES:

12/31/81 12/31/81C CURRENT ENV. STATUS:

FES was issued 12-31-81.

SAFETY / HEARING MILESTONES:

APPLICATI0H TENDERED:

12/30/76 12/30/76C SAR DOCKETED:

04/01/78 06/22/78C SAR Q'S RECEIVED BY PM:

01/05/79 03/07/79C SAR APPL. RESPONSE TO q'S RECEIVED: 05/11/79 07/26/79C INPUT TO DRAFT SER TO PM:

10/12/81 10/12/81C CURRENT HRG. STATUS:

A prehearing conference on CP extension order was held ISSUE DRAFT SER:

11/17/81 11/17/81C on January 26, 1983, in Richland, Wa.

On February 22, INPUT TO SER:

05/30/82 05/30/82C 1983, the ASLB denied the request for hearing filed by ISSUE SER:

03/31/82 03/31/82C the Coalition for Safer Power and dismissed the proceeding.

ACRS LETTER RECEIVED 11/13/82 11/13/82C No OL hearings scheduled.

INPUTS TO SE SUPPLEMENT 3 11/22/82 11/22/82C ISSUE SE SUPPLEMENT 3:

05/20/83 05/20/83C FEMA LETTER RECEIVED:

08/01/83 CURRENT ANTITRUST:

HEARING STARTED:

N/A Hot required ASLB INITIAL DECISIDH:

N/A COMMISSION EFFECTIVENESS DECISI0Hz TECH SPECS COMPLETED:

09/00/83 COMMISSIDH DECISION:

09/00/83 ISSUE LIC. WITH POWER RESTRICTION:

ISSUE FULL POWER LICENSE AMEND:

09/00/83 LATEST AMENDMENT:

SCHED. DATE RECEIPT DATE NEW SLIPS /HOTES:

CONSTRUCTION COMPLETION - APPL.:

09/00/83 05/07/82

HRR L I.C E N S I H G SYSTEM PAGE N0: 2-31 WASHINGTON NUCLEAR 3 0L CURREHT STATUS REP 0RT REPORT AS OF 07/30/80 PLAHT CHARACTERI$TICSt KEY PERSOMNEla DOCKET HO:

05000508 LIC. PM:

A. VIETTI ASLB CHAIR:

M. MARQULIES APPLICANT:

WASHINGTON PUBLIC POWER SUPPLY SYSTEM LIC. BC:

G. KNIGHTON MEMBER 1:

G. BRIGHT LOCATION:

26 MI W OF OLYMPIA, WA LIC. LA.:

J. LEE MEMBER 28 J. CARPENTER REGIDH:

5 AE EBASCO COUNSEL:

D. HASSELL CONST. INSP D. KIRSCH REAC. TYPE: PWR HSSS: COMB ANTITRUST:

B. V0GLER RESID. INSP W. ALBERT DESIGH PWR: 3800 MWT/1242 MWE CONST: EBASCO RM ANALYST:

L. LANIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Appilcation was tendered on June 2, 1982, and was docketed on 08/27/82. Review effort from FSAR docket ER DOCKETED:

08/27/82 58/27/82C thru applicant responses to 9's.

ER SITE VISIT COMPLETE:

INPUT TO DES TO PM:

09/08/83 2

ISSUE DES:

11/07/83 RESPONSE TO COMMENTS ON DES:

ISSUE FES:

04/06/84 CURRENT ENV. STATUS:

Application was tendered on June 2, 1982, and was docketed on 08/27/82. Review effort from ER docket SAFETY / HEARING MILESTONES:

thru prep.-ation and issuance of the DES.

APPLICATION TENDERED:

06/02/82 06/02/82C j

SAR DOCKETED:

08/27/82 08/27/82C SAR Q'S RECEIVED BY PM:

07/00/83 SAR APPL. RESPONSE TO Q'S RECEIVED: 07/13/83 i

CURRENT HRG. STATUS:

IMPUT TO DRAFT SER TO PM:

10/28/83 Notice of Opportunity for Hearing was published in the ISSUE DRAFT SER:

.12/01/83 Federal Register on 09/15/82. On February 25, 1983, a INPUT TO SER:

06/05/84 4

request for a hearing and petition for leave to intervene ISSUE SER:

08/09/84 1

was received from coalition for Safe Power of Portland, Oregon.

On April 21, 1983 the Licensing Board handed down ACRS FULL COMMITTEE MEETING:

09/00/84 an order to accept its late filed petition. Prehearing INPUTS TO SE SUPPLEMENT 18 11/06/84 is currently scheduled for August 3-4, 1983.

ISSUE SE SUPPLEMENT 1:

12/13/84 FEMA LETTER RECEIVED:

CURRENT ANTITRUST:

Hotice of receipt of Antitrust Information was published HEARING STARTED:

05/00/85 l

in the Federal Register on October 27, 1983.

ASLB INITIAL DECISION:

11/J0/85 COMMISSIDH EFFECTIVENESS DECISION: 12/00/85 TECH SPECS COMPLETED:

12/00/85 COMMISSION DECISION:

12/00/85 ISSUE LIC. WITH POWER RESTRICTIDH LATEST AMENDMENT:

ISSUE FU?.L POWER LICENSE AMEND:

N/S SCHED. DATE RECEIPT DATE HEW SLIPS /HOTES:

On July *,, 1983, the Supply System Executive Board CONSTRUCTIDH COMPLETION - APPL.

12/00/85 10/01/82 adopted a resolution calling for an immediate construction delay of WNP-3 until an assured source of funding can be obtained.

i

i 4

NRR L.I C E N S I N G

$YSTEM PAGE NO: 2-32 j

W4TERFORD 3 0L CURRENT STATUS REP 0RT-REPORT AS OF 07/30/80 P L A N'T C H A R A C T E R I 5 T I C 5:

KEY PERSONNEL:

DOCKET NO:

05000382 LIC. PM:

J. WILSON ASLB CHAIR:

S. WOLFE APPLICANT:

LOUISIANA POWER 8 LIGHT LIC. BC:

G. KNIGHTON MEMBER 1:

W. JORDAN LOCATION:

20 MI W OF NEW ORLEANS, LA LIC. LA.:

J. LEE MEMBER 2:

H. FOREMAN 1

REGION:

4.

AE:

EBASCO COUNSEL:

S. TURK CONST. INSP:. UNASSIGNED REAC. TYPE: PWR HSSS: COMB ANTITRUST:

B. V0GLER RESID. INSP: L. CONSTABLE DESIGN PWR 3560 MWT/1151 MWE CONST EBASCO RM ANALYST:

L. LANIER i

CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED DATE ACTUAL DATE i

The safety review was expedited. SSER No. 4 was issued 10/29/82.

Fuel load date was delayed until 05/83 ER DOCKETED:

12/09/78 12/00/78C by applicant. A new date will be supplied in late August.

ER SITE VISIT COMPLETE:

12/05/80 12/05/80C 4

INPUT TO DES TO PM:

04/06/81 04/06/81C ISSUE DES:

05/01/81 05/01/81C RESPONSE TO COMMENTS ON DES:

07/24/81 08/19/81C ISSUE FES:

09/30/81-09/30/81C i

CURRENT ENV. STATUS:

The DES was completed in May 1981.

FES was completed September 1981

. SAFETY / NEARING MILESTONES:

APPLICATION TENDERED:

09/28/78 09/28/78C SAR DOCKETED:

12/18/78C i

SAR Q'S RECEIVED BY PM:

N/S SAR APPL. RESPONSE TO Q'S RECEIVED: 08/08/80 12/15/80C l

CURRENT NRG. STATUS:

INPUT TO DRAFT SER TO PM:

10/03/80 05/15/81C i

Contested hearing started 03/82.

Partial initial ISSUE DRAFT SER:

decision issued 11/03/82. Nearing for remaining item INPUT TO SER:

05/08/81 05/15/81C (emergency preparedness) was held February 7-11, 1983.

ISSUE SER:

07/09/81 07/09/81C Record closed February it. 1983.

Appeal _ Board hearing was held April 19, 1983 to hear rebuttal of 11/03/82 PID.

ACRS LETTER RECEIVED:

08/08/81 08/08/81C Second partial initial decision issued 05/24/83 by ASLB.

INPUTS TO SE SUPPLEMENT 5:

05/18/83 05/18/83C ISSUE SE SUPPLEMENT 5 02/28/83 06/30/83C FEMA LETTER RECEIVED:

09/15/83 i

CURRENT ANTITRUST Staff is reviewing OL antitrust information.

HEARING STARTED:

03/00/82 03/23/82C 4

ASLB INITIAL DECISION:

10/00/82 04/00/83C C0t1 MISSION EFFECTIVENESS DECISION: 09/00/83 TECH SPECS COMPLETED:

09/00/83 COMMISSION DECISION:

06/00.'33 ISSUE LIC. WITN POWER RESTRICTION:

ISSUE FULL POWER LICENSE AMEND 05/00/83 LATEST AMENDMENT:

ER 83 - 8/81 SCHED. DATE RECEIPT'DATE FSAR 831 - 3/83.

NEW SLIPS / NOTES:

To date State of Louisiana does not have an approved CONSTRUCTION COMPLETION

. APPL.:

05/00/83 08/24/82 4

emergency plan.

1

NRR LICENSING SY$ TEM PAGE NO: 2-33 WATTS BAR 1 82 0L CURREHT STATUS REPQRT REPORT AS OF 07/30/80 PLANT CHARACTERISTICSt KEY P E R S 0 N N E La DOCKET NO 039080391 LIC. PM:

T. KENYON ASLB CHAIR: N/A APPLICANT:

TENNESSEE VALLEY AUTHORITY LIC. BC:

E. ADENSAM MEMBER 1 N/A LOCATION:

to MI S OF SPRING CITY, TENN LIC. LA.:

M. DUNCAN MEMBER 2:

N/A REGIDH:

2 AE:

TVA COUNSEL:

M. YOUNG CONST. INSP W< SWAN REAC. TYPE: PWR HSSS: WEST ANTITRUST:

J. RUTBERG RESID. INSP T. HEATHERLY DESIGH PWR: 3411 MWT/t165 MWE CONST: TVA RM ANALYST:

L. LAHIER CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE CFP predicted earliest Unit 1 completion date at 06/84.

SER published 07/82.

ACRS subcommittee meetings held ER DOCKETED:

01/05/77 11/23/76C 04/30/82 and 08/10/82. ACRS full committee meeting ER SITE VISIT COMPLETE:

03/18/77 02/25/77C held 08/13/82.

ACRS letter received 08/16/82. Supplement INPUT TO DES TO PM:

07/06/77 08/18/77C 51 to SER published 09/22/82. Supplement 82 to SER ISSUE DES:

11/29/77 06/02/78C scheduled 11/83.

RESPONSE TO COMMENTS ON DES:

N/A ISSUE FES:

11/24/78 12/29/78C CURRENT ENV. STATUS:

Complete except for environmental teco specs.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

06/30/76 0'6/30/76C SAR DOCKETED:

10/04/76 10/04/76C SAR Q'S RECEIVED BY PM:

12/15/76 05/20/77C SAR APPL RESPONSE TO Q'S RECEIVED: 03/23/77 02/10/78C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

06/18/80 12/18/81C Ho hearings are assumed.

ISSUE DRAFT SER:

12/30/81 12/30/81C INPUT TO SER:

06/04/82 06/04/82C ISSUE SER:

07/01/82 07/01/82C ACRS LETTER RECEIVED:

09/00/82 08/16/82C INPUTS TO SE SUPPLEMENT 28 08/27/82 09/03/82C ISSUE SE SUPPLEMENT 28 11/00/83 FEMA LETTER RECEIVED:

09/01/83 CURRENT ANTITRUST Conplete HEARING STARTED:

N/A ASLB INITIAL DECISION:

N/A COMMISSION EFFECTIVENESS DECISIDH TECH SPECS COMPLETED:

12/00/83 COMMISSIDH DECISION:

12/00/83 ISSUE LIC. WITH POWER RESTRICTIDH 01/00/84 LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

03/00/84 FSAR No. 46 SCHED. DATE RECEIPT DATE HEW SLIPS /HOTES:

CONSTRUCTIDH COMPLETION - APPL.:

01/08/84 02/25/83 l

I l

NRR LICEN5ING SYSTEM PAGE NO: 2. WOLF CREEK 1 0L CURRENT STATUS REPORT REPORT AS OF 07/30/80 PLANT CHARACTERISTICSt KEY

'P E R S 0 N N E La DOCKET NO:

05000482 LIC. PM:

J. HOLONICH ASLB CHAIR:

J. LAURENSON

. APPLICANT:

KANSAS GAS & ELECTRIC LIC BC:

B. YOUNGBLOOD MENBER 1:

G. ANDERSON LOCATION:

3.5 MI NE OF BURLINGTON, KAN LIC. LA.:

M.- RUSHBROOK MEMBER 2:

H. PAXTON REGION:

4 AE:

BECH COUNSEL:

M. KARMAN CONST. INSP H. ROBERDS REAC. TYPE: PWR NSSS: WEST ANTITRUST:

B. V0GLER RESID.'INSP: S. SCHUM 3

DESIGN PWR: 3425 MWT/1150 MWE CONST DANIEL RM ANALYST:

S. HEDLUND-CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE The SER was issued in April 1982.

SSER-1 was issued in i

August 1982 and SSER-2 in June 1983.

ER DOCKETED:

11/25/80 11/25/80C

'ER SITE VISIT COMPLETE:

07/28/81 04/21/81C

}

INPUT TO DES TO PM:

10/01/81 10/01/81C ISSUE DES:

01/05/12 01/05/82C RESPONSE TO COMMENTS ON DES:

05/14/82 05/14/82C ISSUE FES:

06/11/82 06/11/82C CURRENT ENV. STATUS:

The DES was issued in January 1982. The FES was issued SAFETY / NEARING MILESTONES:

in June 1982.

APPLICATION TENDERED:

02/21/80 02/21/8pC SAR DOCKETED:

08/07/80 08/07/60C SAR Q'S RECEIVED BY PM:

SAR APPL. RESPONSE T0 t'S RECEIVED:

l

. CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

03/12/82 03/12/82C Notice of Opportunity for Hearing was pubilshed in the ISSUE DRAFT SER:

Federal Register on 12/18/80. Two petitions for INPUT TO SER:

03/19/82 03/19/82C 7

leave to intervene were filed. A special combined ISSUE SER:

04/07/82 04/07/82C prehearing conference was held on 4/15/81.

A second prehearing conference was held on March 10, 1983.

ACRS LETTER RECEIVED:

05/11/82

.05/11/82C Hearing is tentatively scheduled for Sept. 20-29, 1983

-INPUTS TO SE SUPPLEMENT 3:

07/08/83 07/08/83C ISSUE SE SUPPLEMENT 3:

C8/20/83 and Oct. 18-27, 1983.

FEMA LETTER RECEIVED:

09/15/83 CURRENT ANTITRUST:

HEARING STARTED:

09/20/83 OL antitrust review is in pre ress.

ASLB INITIAL DECISION:

03/00/84; w

COMMISSION EFFECTIVENESS DECISION: 04/00/84 TECH SPECS COMPLETED:

07/09/84 COMMISSION DECISION:

07/00/84 ISSUE LIC. WITH POWER RESTRICTION: N/S ISSUE FULL POWER LICENSE AMEND:

08/00/84 i

LATEST AMENDMENT:

SNUPPS F5AR - No. 11; Wolf Creek Site Addendum - No. 10; SCHED. DATE RECEIPT DATE ER - No. 4.

NEW SLIPS /NJTES:

CONSTRUCTION COMPLETION - APPL.:

08/00/84 5/23/83 A i

f

J

/

[

f i

v NRR LICENSING SYSTEM

-ZIMMER 1 PACE NO: 2-35 OL CURRENT 5TATUS REP 0RT REPORT AS OF 07/30/80 PLANT

,C H A R A C T E R I S T I C St f

K E-Y P E R S 0 N N E L:

DOCKET HO:

05000358 APPLICANTt ClHCIHHATI Ga.S & ELECTRIC LIC PM L; KINTNER ASLB CHAIR J. FRYE LOCATIch:

24 MI SE OF. CINCINNATI, OH LIC. BC:

B. YOUNGBLOOD;_ MEMBER 1<s F. HOOPER LIC. LA.:

M. RUSHBROOK REGIDH 3

' A E :.

S8L ~

COUNSEL:

C. BARTH MEMBER 2r M. LIVINGSTON REAC. TYPE: 'BWR HSSSt -GE ANTITRUST S. LEWIS RESID. INSP: F. CHRISTIANSON,

CONST. INSP D. HUMIER DESIGN PWR: 2436 MWT/0810 MWE.

CONST: KAISER

'RM ANALYST:

E. ST MARY a

CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SE Supplement 01 was issued on 06/04/81 SE Supplement 02 w.3 issued 10/81 SE Supplement 03 issued on 08/23/82.

ER DOCKETED:

09/10/75 09/10/75C HRR completed its audit of the design calculations for the ER SITE VISIT COMPLETE:

10/09/75 10/09/75C main stean line and its supporting structures in the IMPUT TO DES TO PM:

08/20/76 08/19/76C turbine building. Resolution of open items in the safety ISSUE DES:

10/15/76 10/15/76C review is continuing.

RESPONSE TO COMMENTS ON DES:

03/25/77 34/01/77C ISSUE FES:

06/10/77 06/10/77C 1

CURRENT ENV. STATUS:

Complete SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

08/15/75 05/09/75C SAR DOCKETED:

09/15/75 09/10/75C SAR Q'S RECEIVED BY PM:

10/29/76 01/06/77C SAR APPL. RESP 0 HSE TO Q'S RECEIVED: 12/31/76 07/29/77C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

01/28/77 08/11/77C Hearing completed 3/5/82.

Licensing Board decision rendered ISSUE DRAFT SER:

N/A 6/82, which precludes the NRC staff from issuinq a full-INPUT TO SER:

05/20/77 12/07/77C power license and orders additional hearings after FEMA ISSUE SER:

07/29/77 01/31/79C assessment of emergency plans.

On 11/12/82 the Commission issued an order to Show Cause 8 Order Immediately Suspending ACRS LETTER RECEIVED:

09/16/77 03/13/79C Construction because of quality assurance concerns.

INPUTS TO SE SUPPLEMENT 38 06/17/82 08/02/82C On 12/8/82, applicant consented to the Order. On 5/2/83, ISSUE SE SUPPLEMENT 38 08/23/82 08/23/82C Appeal Board affirmed Licensing Board's decision with mods.

FEMA LETTER RECEIVED:

04/15/82 04/15/82C CURRENT ANTITRUST Antitrust review is now closed.

HEARING STARTED:

02/26/82 02/26/82C ASLB INITIAL DECISION:

N/S COMMISSION EFFECTIVENESS DECISION: N/S TECH SPECS COMPLETED:

11/00/84 COMMISSIDH DECISIDH 11/00/84 ISSUE LIC. WITH POWER RESTRICTIDH:

i LATEST AMENDMENT:

ISSUE FULL POWER LICENSE AMEND:

12/00/84 Application amendment 148, FSAR Revision 95 SCHED. DATE RECEIPT DATE NEW SLIPS /HOTES:

1 Applicant letter of 06/01/83 revised estimated construction CONSTRUCTION COMPLETION - APPL.:

12/00/84 060183 AP completion date to the fourth quarter of 1984.

l e

NP R LICEN$ING. SYSTEM PACE NO: 2-38 CLINCH RIVER CP CURRENT STATUS R E P'O R T..

REPORT AS OF 07/30/80 PLANT CNARACTERI$TICSt KEY P E R S 0 N.M E La DOCKET NO:

05000537 LIC PM:

R, STARK ASLB CHAIR:

M. MILLER APPLICANT:

PROJECT MANAGEMENT CORP.; 00E;TVA LIC. BC:

M. CatCE MEMBER 1:

G. LINENBERGER LOCATION:

25 MI W OF KNOXVILLE, TH-LIC. LA.:

P. SNUTTf EW3XTN MEMBER 2:

C. HAND REGION:

2 AE:

BOR COUNSEL:

S. TREBY CONST. INSP l

REAC. TYPE: LMFBR HSSS: ' WEST ANTITRUST J. RUTEERG RESID. INSP:

DESIGN PWR 0975 MWT/0350 MWE CON;T: SIW RM ANALYST B, ST MARY CURRENT SAF. STATUS:

Ehv!RONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Safety review was reinitiated in October 1981.

A revision to the Site Suitability Report was issued June 11, 1982.

ER DOCKETED:

04/11/75 04/11/75C On' August 17, 1982, NRC issued an order granting Clinch ER SITE VISIT COMPLETE:

River's request to begin site preparation activities.

INPUT TO DES TO PM:

~

The Site Suitability Roport hearing sessions were held ISSUE DES:

02/12/76C in Oak Ridge during the week of August 23, 1982.

SER was RESPONSE TO COMMENTS ON DES:

i ssued 3/11/83.

The ACRS meeting was held 4/14/83.

LWA-2 ISSUE FES:

02/07/77 02/07/77C will not be requested. Safety hearing is.to commence August 8, 1983..

Supplement No. - I was i ssued 'on 5/2/83 and Supplement ho. 2 was issued on 5/20/83.

r-CURRENT ENV. STATUS:

The FES was issued in February 1977 A Jraft supplement to the FES was issued on July 19, 1982.

A-final supplement SAFETY / NEARING MILESTONESa' I

was issued on October 29, 1982.

,,},

SAR DOCKETED:

06/13/75

,4 46/t3/75C SAR O'S AECEIVED BY PM:

04/09/82 94/09/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 05/15/87 05/15/82C IFPUT TO DRAFT SER TO PM:

07/16/82 07/t6/82C CURRENT NRG. STATUS:

ISSUE DRAFT SER:

09/27/82 09/27/82C j

Hearing sessions on the SSR took place on August 23-27.

1982.

The FES hearings were held November 15-19, 1982, INPUT TO SER:

01/14/83 02/04/83C December 13-17, 1982, and on January 4-5, 1983.

The safety ISSUE SER:

03/11/83 03/tt/83C haarings are forecasted for August 8, 1983.

PID was i ssued i

ACRS LETTER RECEIVED:

04/19/83 04/19/83C on 02/28/83 on the FES hearing.

INPUTS TO SE SUPPLEMENT 28 04/22/83 04/22/83C ISSUE SE SUPPLEMENT 2:

05/20/83 05/20/83C CURRENT ANTITRUST:

NEARING STARTED:

08/23/82 08/23/82C ASLB INITIAL DECISION:

04/01/84 COMMISSION EFFECTIVENESS DECISION: 06/00/84 TECH SPECS COMPLETED:

COMMISSION DECISION:

06/08/84 CP ISSUED:

06/80/84 LATEST AMENDMENT:

i NEW SLIPS / NOTES:

t MRR LICEN5ING SYSTEM PAGE NO: 2-37 SKAGIT/HANFORD 182 CP CURRENT STATUS REPORT REPURT AS OF 07/30/80 l

PLANT CHARACTERI5TICSt KEY PERS0NNEL DOCKET NO:

852280523 LIC. PM:

M. THADANI ASLB CHAIR J. WOLF APPLICANT:

PUGET SOUND POWER R LIGHT LIC. BC:

E. ADENSAM MEMBER 1:

F. N00PER LOCATION:

12 MI. NW OF RICHLAND. WA.

LIC. LA.:

M. DUNCAN MEMBER 2:

G. LI"ENBERGER REGION:

5 AE:

BECH COUNSEL' L. DEWEY CONST. INSP REAC. TYPE: BWR NSSS: GE ANTITRUST:

B. V0GLER RESID. INSP DESIGN PWR 3833 MWT/1277 MWE CONST: BECH RM ANALYST S. HEDLUND CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Supplement No. 2 to the SER was issued 10/81 on TMI related 1

action items. The applicant is relocating the site to the ER DOCKETED:

09/30/74 09/30/74C Hanford Reservation. Site relocation ER amendment and PSAR ER SITE VISIT COMPLETE:

02/05/82 02/05/82C amendment were submitted on 12/31/81 Supplement 3 to the INPUT TO DES TO PM:

04/09/82 04/09/82C to the SER was issued in 12/82.

The staff recommends ISSUE DES:

05/04/82 05/04/82C additional investigations of the May Junction monocline.

RESPONSE TO COMMENTS ON DES:

08/06/82 09/30/82C j

An ACRS subcommittee site visit and meeting was complete on ISSUE FES:

N/S 01/24-25/83.

The ACRS completed its review in a meeting on 02/10/83 and reported the results of its review in a letter to the chairman on 02/16/83.

i CURRENT ENV. STATUS:

Site relocation (to Hanford) DES was issued on 5/4/82. In response to the applicant's request of 2/4/83, issuance of SAFETY / HEARING MILESTONES:

i the FES had been defered until issuance of the Northwest Conservation and Electric Power Plan by the Northwest Power APPLICATION TENDERED' 08/06/74 08/06/74C j

i Council. On 4/27/83 Council adopted its first plan.

The SAR DOCKETED:

01/15/75 81/15/75C proposed portfolio of electrical resources for the next 20 SAR 9'S RECEIVED BY PM:

02/10/82 02/10/82C 1

years did not include S/HNP.

SAR APPL. RESPONSE TO 4'S RECEIVED: 10/01/82 10/05/82C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

A prehearing schedule on safety matters was established on ISSUE DRAFT SER:

1/18/83 including a tentative date of 5/17/83 for beginning INPUT TO SER:

07/11/77 07/tt/77C of hearing. Applicants on 2/4/83 and the intervenors on ISSUE SER8 08/31/77 08/31/77C 2/10/83 submitted motions to suspend the safety prehearing schedule. On 2/18/83 the Board suspended the prehearing ACRS LETTER RECEIVED:

01/08/83 02/16/83C schedule (Safety) including the filing of new contentions INPUTS TO SE SUPPLEMENT 3 11/30/82 11/30/82C pending adoption of the Final Regional Power Plan and until ISSUE SE SUPPLEMENT 3 11/30/82 12/30/82C the conclusion of hearings on "Need for Power".

CUPRENT ANTITRUST:

Completa HEARING STARTED:

07/15/75 07/15/75C ASLB INITIAL DECISION:

N/S COMMISSION EFFECTIVENESS DECISION: N/S TECH SPECS COMPLETED:

N/A COMMISSION DECISIGHz N/S CP ISSUED:

N/S LATEST AMENDMENT:

MEW SLIPS / NOTES:

4

HRR LICEHSING SY$ TEM PAGE HO: 2-38 i

t (HSS)CESSAR SYSTEM 80 FDA CURRENT STATU$

REPORT REPORT AS OF 07/30/80 PLAHT CHARACT ERISTICSt KEY PERSOHHEL:

I DOCKET HO:

05000470 LIC. PM:

G. MEYER ASLB CHAIR:

APPLICANT:

COMBUSTIDH ENGINEERING LIC. BC:

C.

THOMAS MEMBER 1:

LOCATION:

N/A LIC. LA.:

P. ANDERSON MEMBER 2:

REGION:

0 AE:

COUNSEL:

M. WAGNER CONST. INSP REAC. TYPE: PWR HSSS: COMB ANTITRUST:

RESID. INSP DESIGN PWR: 3800 MWT/1295 MWE CONST:

RM ANALYST:

5. HEDLUND CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE SER (HUREG-0852) issued 11/81.

Awaiting documentation to resolve ACRS. open, and confirmatory issues.

SSER-1 was ER DOCKETEC:

issued 03/30/83. SSER-2 is scheduled to be issued on ER SITE VISIT COMPLETE:

07/29/83.

INPUT TO DES TC PM:

ISSUE DES:

1 RESPONSE TO COMMENTS OH DES:

l ISSUE FES:

CURRENT ENV. STATUS:

l H/A.

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

10/27/78 10/27/78C SAR DOCKETED:

12/21/79 12/21/79C l

SAR Q'S RECEIVED BY PM:

09/01/80 09/01/81C l

SAR APPL. RESPONSE TO Q'S RECEIVED: 01/01/81 07/ts/81C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

N/S ISSUE DRAFT SER:

N/S N/A.

INPUT TO SER:

11/01/81 11/13/81C ISSUE SER:

05/01/82 11/10/81C ACRS LETTER RECEIVED:

06/21/82 12/15/81C INPUTS TO SE SUPPLEMENT 28 07/27/83 ISSUE SE SUPPLEMENT 78 08/05/83 CURRENT ANTITRUST:

H: EARING STARTED:

N/A l

ASLB INITIAL DECISI0H:

N/A COMMISSIDH DECISI0Hz 08/00/83 SPECIAL PROJECT COMPLETE:

08/12/83 l

LATEST AMENDMENT:

HEW SLIPS / NOTES:

NRR LICEN5ING SYSTEM PACE NO: 2-39 (H35)GESSAR SEVERE ACC FDA CURREHT STATUS REPORT REPORT AS OF: 07/34/80 PLANT CHARACTERI$TICSt KEY PERS0NNELa DOCKET HO:

00007447 LIC. PM:

D. SCALLETTI ASLB CHAIR: N/A APPLICANT:

GENERAL ELECTRIC COMPANY LIC. BC:

C. THOMAS MEMBER 1 N/A LOCATIDH:

N/A LIC. LA.:

P. ANDERSON MEMBER 2 N/A l

REGION:

0 AE:

BRAUH COUNSEL:

B. BORDENICK CONST. INSP REAC. TYPE: BWR NSSS: GE ANTITRUST:

RESID. INSP DESIGN PWR: 3579 MWT/1220 MWE CONST:

RM ANALYST:

B. ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE GESSAR II was docketed 02/82; review is in progress.

Dates shown reflect review for the severe accident.

ER DOCKETED:

design.

ER SITE VISIT COMPLETE:

INPUT TO DES TO PM:

ISSUE DES:

RESPONSE TO COMMENTS ON DES:

ISSUE FES:

CURRENT ENV. STATUS:

SAFETY / HEARING MILESTONES:

APPLICATION TENDERED:

03/31/80 03/31/80C SAR DOCKETED:

02/22/82 02/22/82C SAR Q'S RECEIVED BY PM:

09/01/82 10/08/82C SAR APPL. RESPONSE TO Q'S RECEIVED: 02/01/83 02/01/83C CURRENT HRG. STATUS:

INPUT TS DRAFT SER TO PM:

ISSUE DRAFT SER:

INPUT TO SER:

02/01/84 ISSUE SER:

03/01/84 ACRS FULL COMMITTEE MEETINO:

04/06/84 INPUTS TO SE SUPPLEMENT 18 04/21/84 ISSUE SE SUPPLEMthT 12 05/25/84 CURRENT ANTITRUST:

FDA antitrust review is in progress.

HEARING STARTED:

N/A ASLB INITIAL DECISION:

N/A COMMISSION DECISION:

N/A SPECIAL PROJECT COMPLETE:

05/00/84 LATEST AMENDMENT:

FSAR Amendment No. 14 was received in AprlI, 1983.

NEW SLIPS /HOTES:

F

NRR LICENSING SY$ TEM PAGE NO: 2-40 (NSS)GESSAR-238 NI FDA CURRENT STATUS REP 0RT REPORT AS OF 07/30/80 PLANT CHARACTERISTICSt KEY P E R S 0 N N E La DOCKET NO:

05000447 APPLICANT:

GENERAL ELECTRIC COMPANY LIC. PM:

D. SCALETTI ASLB CHAIR: N/A LOCATION:

N/A LIC. BC:

C. THOMAS MEMBER 18 N/A LIC. LA.:

P. ANDERSON MEMBER 2 N/A REGIDH:

0 AE BRAUN COUNSEL:

B. BORDENICK CONST. INSP:

REAC. TYPE: BWR NSSS: GE ANTITRUST:

RESID. INSP:

DESIGN PWR 3579 MWT/1220 MWE CONST:

RM ANALYST:

B. ST MARY CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE GESSAR II was docketed 02/82.

The foundation analysis issue will require special attention. PRA for severe ER DOCKETED:

accident design was submitted 4/82.

Severe accident ER SITE VISIT COMPLETE:

design modifications were submitted 6/82 in Amendment INPUT TO DES TO PMt No. 4.

GE has requested the EDO to accelerate the ISSUE DES:

PRA review schedule to coincide with the FDA.

GESSAR II RESPONSE TO COMMENTS ON DES:

FDA was issued July 27, 1983.

ISSUE FES:

CURRENT ENV. STATUS:

SAFETY / NEARING MILESTONES:

APPLICATION TENDERED:

03/31/80 03/31/40C SAR DOCKETED:

02/22/82 02/22/82C SAR Q'S RECEIVED BY PM:

10/15/82 10/08/82C SAR APPL. RESPONSE TO 9'S RECEIVED: 11/12/82 02/11/83C CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

ISSUE DRAFT SER:

INPUT TO SER:

03/25/83 03/25/83C ISSUE SER:

04/01/83 04/08/83C ACRS LETTER RECEIVED:

06/15/83 06/15/83C INPUTS TO SE SUPPLEMENT 1 96/24/83 ISSUE SE SUPPLEMENT 13 06/17/83 06/30/83C CURRENT ANTITRUST:

FDA antitrust review is in progress.

HEARING STARTED:

N/A ASLB INITIAL DECISION:

N/A l

COMMISSION DECISION:

N/A I

SPECIAL PROJECT COMPLETE:

07/27/83 07/27/83C LATEST AMENDMENT:

FSAR Amendment No. 14 was received in April, 1983.

NEW SLIPS / NOTES:

i l

l

NRR LICENSING SY$ TEM AS OF 07/30/83 M0N-POWER RENEWALS INPUT ISSUE DOCKET EARLIEST ISSUEM TER ISSUE FES OR START ISSUE NON-POWER FACILITY NUMBER DOCKET RE1 TO PM 118 11A NEARING AL COMMENTS AFRRI 05000170 10/80C N/A 09/81C 01/82C N/A N/S N/S CONTESTED CASE 1000.0000KW TRIGA CORNELL U.

05000157 05/80C N/A 02/83C 07/83 07/83 N/A 07/83 100.0000KW TRIGA j

CORNELL UNIVERSITY 05000097 10/78C N/A 02/83C 08/83 08/83 N/A 08/83 1000KW<CRITI GE TEST REACTOR 05000070 07/77C N/S N/S N/S N/S N/S N/S ORDER TO SHOW CAUSE.

ASLAB NEARINGS.

50.0000KW TANK GE, NTR 05000073 11/79C N/A 06/84 09/84 09/84 N/A 09/84 100.0000KW POOL IOWA STATE 05000116 09/79C N/A 09/83 09/83 09/83 N/A 09/83 10.0000KW ARGNT MANHATTAN COLLEGE 05000199 08/83 N/A 08/84 10/84 10/84 N/A 10/84

.000lKW CRITI MICHIGAN STATE 05000294 09/77C N/A 12/83 12/83 N/A N/A 12/83 250.0000KW TRIGA HBSR 05000184 12/80C 02/82C 09/82C 08/83 09/82C N/A 08/83 POWER INCREASE TO 20 MW INCLUDED IN RENEWAL 10.0000KW TANK RENSSELAER 05000225 05/79C N/A 08/83C 09/83 09/83 N/A 09/83

.0000KW CRITI STATE U OF NEW YORK 05000057 06/79C N/A 12/82C 05/83C N/A N/A 07/83C 2000.0000KW PULSR l

U. OF KANSAS 05000148 03/80C N/A 02/84 04/84 04/84 N/A 04/84 250.0000KW POOL U. OF MD.

05000166 05/80C N/A 10/83 12/83 N/A N/A 12/83 250.0000KW TRIGA U. OF MO., ROLLA 05000123 10/79C N/A 04/84 06/84 N/A N/A 06/84 200.0000KW POOL U. OF OKLA.

05300112 10/78C N/A 05/83C 08/83 08/83 N/A 08/83

.0150KW AGN U. OF TEXAS 05000192 05/80C N/A 03/83C 06/83C 07/83 N/A 07/83 250.0000KW TRIGA

NRR LICENSING SYSTEM NON-P0WER RENEWAL 5

?.

INPUT ISSUE DOCKET EARLIEST ISSUEu TER ISSUE FES OR START ISSUE NON-POWER FACILITY NUMBER DOCKET Eli TO PM 11R Ela HEARING AL COMMENTS U. OF UTAH 05000407 05/83C N/A 11/83 02/84 N/A N/A 02/84 100.0000KW TRIGA U. OF VA., CAVALIER 05000396 06/84 N/A 07/84 09/84 N/A N/A 09/84 1000KW POOL UCLA, ARGONAUT 05000142 02/80C N/A 10/82C 06/81C 06/81C 09/80C N/S CONTESTED CASE 100.00G0KW ARGHT UNION CARBIDE 05000054 05/80C N/A 10/82C 09/83 09/83 N/A 09/83 5000.0000KW POOL VA HOSPITAL 05000131 01/80C N/A 05/83C 07/83 N/A N/A 08/83 l

18.0000KW POOL VA. POLY. INSTITUTE 05000124 10/79C N/A 10/83 12/83 12/83 N/A 12/83 100.0000KW ARGNT WEST., TRAINING REACTOR 05000087 12/8tC N/A 11/83 02/84 22/84 N/A 02/84 10.0000KW TANK M FOR TEST REACTORS ONLY l

l l

l l

l~

e t

I

C l

M M

M Z

O M

N l

u kJ 44

NRR LICEN$ING S Y S T E ft PAGE NO: 2-0L CURREHT STATUS REPORT REPORT AS OF:

PLANT CHARACTERI5TICSt KEY P E R S 0 N N E La DOCKET H0:

Docket No.or Project No.,if not docketed APPLICANT:

Utility LIC PM:

Limnsing Project Manager ASL8 CHAIR: ASLB Chairman LIC. BC:

Licmsing Branch Chief MFMBER 18 on panel LOCATIDH:

fMes and direction from nearest major town LIC. LA.*

Licensing Assistant MEMBER 2:

on panel REGION:

1 through 5 AE:

Architect / Engineer COUNSEL:

Attorney assiped to case CONST. INSP: Construction inspector REAC. TYPE: PWR, BWR, HTGR or LMFBR NSSS: Nuclear Steam Systems Supplier ANTITRUST:

Antitrust Attorney RESID, INSP: Resident Inspector DESIGH PWR Megawatts electric & thermal CONST: Constructor MP A AN A LYST : MPA analyst assigned to track protect CURRENT SAF. STATUS:

ENVIRONMENTAL MILESTONES:

SCHED. DATE ACTUAL DATE Safety status for this reporting period only. It consists of accomplishments and schedule changes occurring since the last issue of Blue Book. Outstanding issues and late input from ER DOCKETED:

Environmental Report review branches should be indicated, along with indication of the critical path.

P O

T Project Manager ISSUE DES:

Draft Environmental Statement RESPONSE TO COMMENTS ON DES:

ISSUE FES:

Final Environmental Statement CURRENT ENV. STAIUS:

Environmental status for this reporting period only. It consists of accomplishments and schedule changes occurring since the last issue of Blue Book. Outstanding issues and late SAFETY / HEARING MILESTONES:

input from review branches should be indicated.

APPLICATION TENDERED:

SAR DOCKETED:

Safety Analysis Report SAR Q'S RECEIVED BY PM:

SAR APPL. RESPONSE TO Q'S RECEIVED:

CURRENT HRG. STATUS:

INPUT TO DRAFT SER TO PM:

Changes in the hearing tiates since the last issue of Blue Book. Changes in intervention and ISSUE DRAFT SER:

Safety Evaluation Report contentions should be indicated.

ER ACRS LETTER RECEIVED:

Advisory Committee INPUTS TO SE SUPPLEMENT 3:

on Reactor Safeguards ISSUE SE SUPPLEMENT 3:

FEMA LETTER RECEIVED:

Safety Evaluation Supplement CURRENT ANTITRUST:

Changes in the antitrust status since the last issue of Blue Book.

HEARING STARTED:

ASLB INITIAL DECISIDH:

Atomic Safety & Licensing Board ASLB FINAL DECISION:

TECH SPECS COMPLETED:

C0ftt1ISSION DECISION:

ISSUE PARTIAL POWER LICENSE:

LATEST AMENDMENT:

ISSUE FULL POWER LICENSE:

The latest amendment submitted by the applicant.

SCHED. DATE RECEIPT DATE NEW SLIPS /HOTES:

Slips or potential problems that should be brought to management's attention.

CONSTRUCTION COMPLETION - APPL.

,D,h

%[

z m in -

~

fi.

completson e o.s. corrasset:st PatmT2no orrier Is s 3-3s i-29s s ise

%'"335 u s wuCLE AR REcotcTORtt cOuussSiON BIBLIOGRAPHIC DAT A SHEET NUREG-0580 Vol.12, !!o. 7

< 1m E ANa SusiritE pas ve.ume no, aove wr.are,

i,,. e e.,a,

Regulatory Licensing Status Summary Iteport 3 RECIPIE NT'S ACCESSION NO (Blue Eook)

7. AUTHORISI
5. DATE REPORT COWM l YEAR MONTH August 1933 9 PE RF ORMING ORGANIZATION N AME AND M AIL!NG ADDRESS (include Isa Codel DATE REPORT ISSUED Office of Resource.!anagement

'juh" t I IN3 fianagement Information Branch U. S. Muclear Regulatory Commission 6*"'*'***#

Washington, D.C.

20555 8 fleave biank)

12. SPONSORING ORGANIZATION NAME AND MAILING ADORESS (include Isa Codel 10 PROJECT T ASK/ WORK UNIT NO Office of Resource Management

'.lanagement Information Branch it. CONT RACT NO U. S. Nuclear Regulatory Commission L!ashington, D.C.

20555 i3 T3 PE Or REeORT f e a' oo c ov t "E o "" "'"

July 1.1983 - July 31. 1983 15 S$PLE r.*E f4 T A R Y NOTE S I4 ""#'

16 A ES T h AL T (2N a e ci p* /ess f Provide a review of the status of the progress of the licensing reviews for all construction permits, operating licenses, special projects and non-power reactor renewals under review, as reported to Congress.

17 A E Y WOR DS AND DOCUME NT AN ALYS:S 17a DESCRIPTORS 17n :DE N Ts F E RS OPE N E N DE D TE RMS

  • 0 OF P A SE S IS L 75 ST A7E usNT 19 SE CURS T V ClaS5 e Te.a eroo-tr

?!

Unclassified 20 SE CURiT Y class #7*.i cas,

?? PRiOE Unclassified 5

UNITED STATES

,, sr ctass uan NUCLEAR REGULATORY COMMISSION Postact a pais raio osnac WASHINGTON, D.C. 205E6 was a c Pt suit to I,1L Of FICIAL BUSINESS a

PENALTY FOR PRIVATE USE, $300

{

0 e

t 5

i

=

l i C 5 5 ' U / >: u 7 7 1 1 A t,1 N u US f. f-L A fJ - D i v iF f i t,L FLLILY f.

e'u t UCT ",, L i-, u p r,,

n-SC 1 mO k ~ l l'N o I I

~ (~

[

D h

- - _ - - - -. _ - - _ _. - _ _ _