Text
1 i
TENNESSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 374ol 400 Chestnut Street Tower II May 18, 1983 BLRD-50-438/82-68 co BLRD-50-439/82-61 c4
~.:-R s, O U.S. Nuclear Regulatory Commission M
Region II T
$o5 Attn:
Mr. James P. O'Reilly, Regional Administrator CD 101 Marietta Street, NW, Suite 2900 xt r Atlanta, Georgia 30303
[
y;;
Dear Mr. O'Reilly:
BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - GENERIC DEFICIENCIES AT CONSOLIDATED CONTROLS CORPORATION - BLRD-50-438/82-68, BLRD-50-439/82 SECOND INTERIM REPORT The subject deficiency was initially reported to NRC-0IE Inspector R. V. Crlenjak on September 16, 1982 in accordance with 10 CFR 50.55(e) as NCR 1950. This was followed by our first interim report dated October 18, 1982. Enclosed is our second interim report. We expect to submit our next report on or about November 17, 1983 We consider 10 CFR Part 21 applicable to this deficiency.
If you have any questions concerning this matter, please get in touch with R. H. Shell at FTS 858-2688.
Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills, nager Nuclear Licensing Enclosure cc:
Mr. Richard C. DeYoung, Director (Enclosure)
Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Records Center (Enclosure)
Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339
.g. g d rM '
8305230545 830518 PDR ADOCK 05000438 S
PDR fE 2]
An Equal Opportunity Employer
T' 4t ENCLOSURE BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 GENERIC DEFICIENCIES AT CONSOLIDATED CONTROLS CORPORATION NCR 1950 BLRD-50-438/82-68, BLRD-50-439/82-61 10 CFR 50.55(e)
SECOND INTERIM REPORT Description of Deficiency l
Consolidated Controls Corporation (CCC) of Bethel, Connecticut, has supplied TVA with the solid state control system (SSCS) as well as the basic control room switch modules (Type SN3) for the Bellefcnte Nuclear Plant. Since the beginning of shipment in May 1977 and continuing to the present, there have been at least 39 nonconformances written against the equipment supplied by CCC. At least six of these nonconformances have been determined to be reportable to the NRC.
Individually, most of these nonconformances do not represent a -
significant condition adverse to. quality; however, collectively, they do indicate a breakdown in the supplier's quality control program.
Bellefonte is the only TVA plant to receive equipment under a QA contract from CCC.
Interim Progress CCC has responded to the-QA/QC concertur of'tiris nonconfornnnce' report (NCl:)
in their letter to TVA dated December 15, 1982 (EEB.821217 017), and in
~
their responses to TVA audits in September 1981 and October 1982 and to the NRC audit in July 1982.
CCC has provided some failure analyses of failed equipment listed on other NCRs. Failure analyses on the remainder of failed equipment are due by August 1, 1983 Preliminary evaluation of their sub.aittals indicates that CCC has corrected their quality control problems and that numerors equipment failures arc random failures. TVA will fully evaluate quality coi. trol issues and discuss the resuli;s in a subsequent report.
l k