Text
_ _ _ - _ - - - - _ - _ -
l t
CFERATING DATA REFORT DOCLET NO 50 413 DATE hly 15. 1991 OPERATINS STATUS CCFLETED IV R.A. Williaes TELEPHONE 7 % -373-5967
- 1. Unit hase: Catanta 1
- 2. Reperting Feriodt hre 1 1991-htte 30,1991 3
- 3. Licensed Thermal Fewer (S t):
3411
- 4. Nameplate Rating (6tess FWe):
130$*
Nctes *Naseplate Fating
- 5. Design Electrital Fating (Net Ne):
1145 (Bross Nel caltvlated as
- 6. Paximus Dependsle Capacity (Bross Ne):
1192 1450.000 PVA x.90 p:=er
- 7. Maxisus Depencable Capa;ity (Net f'We):
1129 f attor per Fage iii, B. If Charsges Octer in Capacity Ratings (ltess h.aber 3 Thrcu;h 7) Since Last N'JEEE 0020.
Report. Give Feasens:
- 9. Foner Le.el le Which Restricted, if Any (Net Nel:
- 10. Reaser,Fer Festrittiens, If any:
This Ponth Yr.-to-Late Cusalative
- 11. Fcurs In Re;crting Feriod 720.0 4343.0 52632.0
- 12. Noter Of Routs Featter Was Critical 396.7 2051.4 39069.1
- 13. Eeactor Reserve SNtdown Hours
--0--
--0--
- 14. Hours sererater On-Line 333.6 1933.5 37103.4
- 15. Unit Reserve Shut m n Hours
--0--
--0--
--0--
- 16. Sress Thereal Energy Beverated (N 0 213021 5945413 119247057
- 17. Grcss Electriul Energy Generated (NH) 2651%
20%I2e 41658610
- 18. Het Electrital Ecergy Generatec (NH)
E28323 1929565 391957 %
- 19. Unit Service Factor 46.3 4.6 70.5 20, Unit Availability Factor 46.3 44.6 70.5
- 21. Unit Capacity Fa: tor (Usin; MDC Net) 23.1 37.4 65.6
- 22. Unit Capatity Facter (Using DEF Net) 27.7 38.E 65.0
- 23. Unit forced Cutage Rate 13.3 6.8 12.4
- 24. Shatbn Scheduled User Next 6 *orths (Type, Date, and Duraticn of Eacht:
NONF
- 25. If Snut Don, At End Of Fe;ert Feriod. Estimated Date cf Startuc:
- 26. Units In Test Status (Frior to Couercial 0;eraticH:
Forecnt Achieved IW!TIAL CRITICALiiY INITIAL ELECTRICITY CO PERCIAL OFEEAi!GN 0107220248 *10715 PDR ADOCK 07000413 R
POR
q....
-.m
. ~..
.~...__.--_..___,.m.
OPERAll % LATA REPORT-
--j DOCKET ND 50-413-I
~
- UNil Catauta 1 MTE July 15. 1991 C0",PLETED BY F,A. Wil!! ass TELEPHONE 704-373-5987 l
1 MONTH
... Joe,1991 i
[!Al AVERASE DAILY F0WER LEVEL W
AVEKAGE DA!LY POWER LEVEL (We-Net)
(MWe-Net) 1 0
17 0
2 0
.18 234 3?
0 19 525 t
4 0
20 203 5
0 21 121 7
6 0
22 611
.7 0
23 996 0
0 24 till i
9.
0 25 n t3 t
l 10 0
26 1127 0
27 1124 121 0
22 1044 l,
13 0
29 5 911
- 14 1
30
-1116 15-70 16 -
137 l
l l
l :.
I
,. _..... ~.,,
r,.,%-
.,,+,m,,,,,,,%
y
.c-
,.,.v
UNIT SHUTDOWNS AND POWER REDrICTIONS DOCKET NO.
50-413 UNIT NAME CATAWBA 1 DATE v //1d/ 91 PAGE 1 OF 3 REPORT MONTH June 1991 COMPLETED BY s.
- w. muser TELEPHONE
( / v4 ) -a / 3-d it>z (1) 2)
(4)
(5)
E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE
'4 91 1 S
326.30 C
1 RC FUELXX END OF CYCLE 15 REFUELING OUTAGE 12-P 91-6-14 S
B HB VALVEX CONTROL VALVE MOVEMENT TESTING l
l 5
91-6-15 S
3.48 B
1 HA TURBIN TURBINE OVERSPEED TRIP TEST 13-P 91-6-15 S
B RC XXXXXX LOW POWER TESTING l
14-P 91-6-15 S
A CH HTEXCH STEAM GENERATOR NOZZLE SWAP 15-P 91-6-15 S
B HG HTEXCH SECONDARY SIDE BORON SOAK 16-P 91-6-16 S
B HG HTEXCH SECONDARY SIDE BORON SOAK 6
91-6-16 F
29.90 A
3 HB CKTBKR PROBLEMS SWITCHING FROM MANUAL TO EMERGENCY MANUAL AND BACK 17-P 91-6-19 S
B HB VALVEX CONTROL VALVE MOVEMENT TESTING (1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions A-EquifmentFailure (Explain) 1-Manual for Preparation of, Data S Scheduled B-Main enance or test 2-Manual Scram Entry Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER (NUREG-0161))
D-Regulatory Restrictiory 4-Other (Explain)
File E-Operator Training & License Examination F-Administrative (5)
H-Other. (Explain) (Explain)
Exhibit I - Same Source G-Operator Error l
i o
v
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-413 UNIT NAME CATAW15A 1 DATE v //1c/ 91 PAGE 2 OF 3 REPORT MONTH June 1991 COMPLETED BY s.
- w. Mustx-TELEPHONE
( / v4 ) -J / J-D / t>Z (1)
A) flE -
(2 (3
(4)
(5)
E IIOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE 18-P 91-6-19 F
A IE XXXXXX OVER POWER DELTA T NOT RESETTING 7
91-6-20 F
21.40 A
3 CB PUMPXX REACTOR TRIP DUE TO FAILED RELAY ON
'A' REACTOR COOLANT PUMP i
19-P 91-6-21 F
B liG HTEXCH SECONPARY SIDE BORON SOAK 20-P 91-6-22 S
B HB VALVEX CONTROL VALVE MOVEMENT TESTING 21-P 91-6-22 S
B IIB VALVEX CONTROL VALVE MOVEMENT TESTING 22-P 91-6-28 S
B HB INSTRU DIGITAL FEEDWATER CONTROL SYSTEM TESTING 8
91-6-29 S
5.32 B
HB.
INSTRU DIGITAL FEEDWATER CONTROL SYSTEM' TESTING 23-P 91-6-29
.S B
iib VALVEX CONTROL VALVE MOVEMENT TESTING f
(1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions S Scheduled A-Equipment Failure'(Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent W Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER (NUREG-0161))
D-Regulatory Restrictiory 4-Other (Explain)
File E-Operator Training & License Examination F-Administrative (5)
H-Other (Explain) (Explain)
G-Operator Error Exhibit I - Same Source I
i b
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.-
50-413 UNIT NAME CATAWUA 1 DATE ue/id/91 PAGE 3 OF 3 REPORT MONTH
' June 1991 COMPLETED BY s.
w.
muser r
TELEPHONE
( / v4 3 -a / J-:> / cz (1) 2)
(4)
(5)
E IlOD T
A OF LICENSE N
Y-S SHUT EVENT SYS-CAUSE AND CORRECTIVE-O P
DURATION-O DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE 24-P 91-6-29 S
B HB VALVEX CONTROL VALVE MOVEMENT TESTING 25-P 91-6-29 S
B HB VALVEX CONTROL VALVE MOVEMENT TESTING F
(1)
(2)
(3)
(4)
F Forced Reason *.
Method:
Exhibit G - Instructions-S Scheduled A-Equi ment FailureB-Main enance or test (Explain) 1-Manual for P1 tration of, Data 2-Manual Scram Ent W bueets For Licensee-C-Refueling 3-Automatic Scram Event Report (LER (NUREG-Ol61) -)
D-Regulatory Restriction 4-Other (Explain)
File E-Operator Training & License Examination F-Admin 3strative (SJ G-Operator Err 9r (Explain) uxhibit I - Same Source H-Other (Explain) i
~. -.,-.- -.-... ~.. ~. -. -
-. - - _. ~...
4 a
DOCKET NO:
50-413 UNIT:
Catawba 1 DATE; 7/15/91
. NARRATIVE
SUMMARY
MONTH: June 1991 Catawba Unit 1 began the month of June shut down for its end of-cycle "5" refueling outage. The unit wac placed on-line to end the outage at 1418 on 06/14.
The unit was.taken back off-line at 0330 on 06/15 for a i
turbine overspee'd trip test, and was back on-line at 0659 on 0330.
j
.DurinS the Power increase the unit was held at various low power levels for-core physics testing, steam generator nozzle swap, steam generator secondary side boron soak, and digital feedwater control system testing.
The unit tripped off-line from 20% power at 1418 on 06/16 due to e
feedwater control problems, and was placed back on-line.at 2012 on 06/17.
During this power increase, the unit was held at variuos power levels for feedwater control system testing, control valve movement testing, and a nuclear instrumentation problem.
The unit tripped off-line from approximately 65% power at 0823 on 06/20 due to a failed relay on the
'A' reactor coolant pump. The unit was placed on-line et 0547 on 06/21. After holds for steam generator boron soak, control valve mevement testing, and nuclear instrumentation calibrations, the
. unit reached 100% full power at 2200 on 06/25. The unit operated at 100% power until 2250 on 06/28, when testing of the digital feedwater control system was commenced. As part of the test, the unit was taken 1
off-line at:0056 on 06/29.
It was returned on line at 0615 on 06/29.
' After holds for control valve movement testing, the unit reached 100%
- full power at 0100 on 06/30, and operated at 100% full power for the remainder of the month.
i 1
Prepared by:
S. W. Moser Telephone:
704-373-5762 i
,w-a,-.
~.
w-
..m..+
w
)
LMONTHLY REFUELING INFORMATION REQUEST 1.
Facility name: Catawba, Unit 1 2.
Scheduled next refueling shutdown:-May 1992 3.
Scheduled restart following refueling: July 1992-THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4.
Will refueling or resumption of operation thereafter require a technical
-specification change or other licensa am6adment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of fuel assemblies (a) in the core: 193
~
(b) in the spent fuel pool: 336 l
j.
-8.
Present licensed fuel pool capacity: 1418 Size of requested or planned increase:
9.
Projected date of last refueling which can be accommodated by present I
licensed capacity: September 2009 l
l DUKE POWER COMPANY DATE: July 15, 1991 Name of
Contact:
J. A. Reavis Phone:
704-373-7567
r.
l CPERATIM6 DATA REPORT DOCKET ND' 50-414 LATE July 15. 1991
' )
.09ERATIN3 STATUS COMPLETED P'f F.A. Williaes ~
TELEPHONE 704-373-5487
- 1. Unit Name: Catanta 2 i
- 2. Reporting Period: June 1, 1991-Jur,e 30, 1991
- 3. Licensed Thereal Power (Et):
3411
- 4. Naseplate Fating (6 toss MWelt
-13054 Notes *Naeeplate Rattog'
- 5. Design Electrical Rating (Net MWe):
1145' (Stoss Nel calculated as i
- 6. Marious Dependable Capacity (Bress M el:
1192 1450.000 M M x.90 power
- 7. Marisun Dependable Cap;ity (Net Ne):
1129 U ter per Page 111, B. If Cha6 es Occur-in Captity Ratings !!tets Nusber 3 Through 7) Since Last NUREG 1020.
9 Report. Eive Eeasons:
-9. Power Level To Which Restricted, if Any (Net M e):
- 10. Reas9n For Bestrictions, If any:
This Month Yr.-to-Date Caulative
!!. Heers_Ir. Reporting Period-720.0 4343.0 42649.0
- 12. Nuster Gf Hcurs Reactor Was Critical 720.0 4082.0 31680.7 l
- 13. ileactor Reserve Shutdown Hours -
- 14. Hours Eenerator On-Line 720.0 4M8.5 309E9.5
- 25. Unit Reserve Shutdown Hours -+-
-- + -
- 16. Bress Thereal Energy Generated MWH) 2436205 13373222-96742302
?
- 17. Gross Electrical Energy Generated (NH) 857430 475980!
-34223226 j
18.: Net Electrical Er.ergy Generated (NM) 614597 4502727 320B5340 l
- 19. Unit Service Facter 100.0 93.2 72.7 j
- 20. Unit Availability Factor 100.0 93.2 72.7 l
- 21. Unit capacity Factor (Using MDC Net)
-100.2 91.9 66.4 l
- 22. Unit Capacity factor (Using DER Net) 98.8 90.6 65.7 2L Unit Forced Outage Rate 0.0 4.5 13.4
- 24. Chutdo ling gctober 18,0ver Next a %n $91 e,
wdeknd Duration of Each):
Schedule (Typ ate
~
hetue s
- 25. If Shut Down At End Of Report Period. Estiaated Date of Startup:
("
- 26. Units In' Test Status (Prior to Cessercial Oceration):
Forecast Achieved INITIAL CRITICALITYJ INITIAL ELECTP.ICITY l
COMERCIAL OPERMION rree
,m~
ar
,-u------m.
a
.- e.
- w m e-
.a.
+,-m-c.
.-u
. - =
..--w->..--.-
..m'w vv
.e--
a +-
+-
e-+
r r-v
,r
-i mr-
-,. = ~
-. -..., =..
.....~..c M
... ~.. -
i OPERAllNG LATA REFORT DOCrET ND -
'50-414 UNil Catada 2 LATE July 15,1991 CDMPLETED BV R.A, Williaes TELEPHONE 904-373-5987 nGNTH June. 1991 D
t4 H ASE DA!LY FOWER LEVEL I,11 AVERASE LAILY POWER LEVEL 3
(KWe-Wet)-
(MW-Net) 1 1126 _
17 1132 2-1131 1B
!!29 3
1120 19 1130 4
1129-20 1127 5
1162 21 1127 6
1142 22 1129 7-1162 23 1127 k
.6 1142 24 1135
-9 1138 25
-1139=
p 10
-1138
- 26 1126 11 -
1137 27
-1113 12-
!!20-26 1t29
~13 1133 29 11F2 14-1134-30 --
1119 l.-
- 15 1136 16 1133
. ~, _ - -... -.-
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-414 UNIT NAME CATAW13A i DATE v//1d/91 REPORT MONTH June 1991 COMPLETED BY 5.
W.
MustK TELEPHONE
(/u41-3/J-3/62
'(1) 2)
3 (4)
(5)
E HbD T
A OF LICENSE N
Y S
S!?UT EVENT SYS-CAUSE AND OORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S
l i
(1)
(2)
(3)
(4)
Method:
Exhibit G - Instructions (Explain) 1-Manual for Preparation of, Data F Forced Reacon:
A-Equi ment FailureB-Mainkenanceortest 2-Manual Scram Ent W Snects For Licensee S Scheduled 3-Automatic Scram Event Report (LER) l C-Refueling 4-Other (Explain)
File (NUEG-0161)
D-Regulaton Rgstriction E-Operator Training & License Examination (5)
F-Administrative Exhibit I Same Source H-Other (Explain) (Explain)
G-Operator Error
,1 l
1 I
DOCKET No:
50 614 UNIT: Catawba 2 DATE:
7/15/91 NARRATIVE SUltMARY MONTil:
June-1991 Catawba Unit 2 began the month of June operating at 100% full poter.
The unit operated at cnc near 100% full power for the entire month, and ended the month operating at 100% full power.
l 1
i ll' Prepared-by:
S. W. Moser Teleohone:
704-373-5762
v.=
3 MONTHLY REFUELING INFORMATION REQUEST 1.
Facility name: Catawba, Unit 2
- 2.
Scheduled next refueling shutdown: October 1991~
3.
Scheduled restart following refueling:
December 1991 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL
- NO LONGER BE MAINTAINED IN THIS REPORT.
4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
l If no,.has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
_ 6.
Important licensing considerations (new or different design or supplier, I
unreviewed_ design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of fuel assemblies (a) in the core:
193 (b) in the spent fuel pool: 204
.8.
-Present licensed fuel pool capacity: 1418 SizeLof requested or planned increase:
9.
Projected date of last refueling which can be accommodated by present licensed capacity: September 2011 DUKE POWER COMPANY DATE:
July 15, 1991 Name of
Contact:
J. A. Reavis Phone: 704-373-7567
-