Requests Exemption from Generic Ltr 82-33 Requiring Backup Emergency Operations Facility to Be Located within 10 to 20 Miles of Plant Site.Approval Requested to Have Backup Emergency Operations Facility at Corporate Ofc
ML20074B065
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 05/16/1983
From: Dixon O
SOUTH CAROLINA ELECTRIC & GAS CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
GL-82-33, NUDOCS 8305180373
Download: ML20074B065 (2)


Text

O SOUTH CAROLINA ELECTRIC & GAS COMPANY POST OFFICE 7M CoLUMalA. SOUTH CAROLtNA 29218

o. W. DixoN, JR.

VtCE P.ESIDENT May 16, 1983 suCofan o,E.. TON.

Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

Virgil C. Summer Nuclear Station Docket No. 50/395 Operating License No. NPF-12 Generic Letter 82-33 Back-up EOF Ref:

(1) Mr. O. W. Dixon letter to H.

R.

Denton dated November 24, 1982 (2) Mr. O. W.

Dixon letter to H. R. Denton dated April 15, 1983

Dear Mr. Denton:

NRC Generic Letter 82-33 requires a backup Emergency Operations Facility (EOF) to be located within ten (10) to twenty (20) miles of the plant site when a primary EOF is located within zero (0) to ten (10) miles.

South Carolina Electric and Gas Company (SCE&G) has its primary EOF located approximately two and sixth tenths (2.6) miles south of the plant.

In the referenced letters, SCE&G requested NRC approval for not having a backup EOF.

This was denied in Mr.

Eisenhut's letter dated April 25, 1983.

The Corporate Of fice of SCE&G is located in Columbia, South Carolina approximately twenty-five (25) miles south of the plant.

SCE&G proposes this facility as a backup EOF.

This facility has the advantage of adequate communication equia-ment, meeting rooms and offices. Located at this facility are personnel of the Nuclear Engineering, Nuclear Licensing, Quality Assurance, Nuclear Training, Nuclear Security, Emergency Planning, Corporate Health Physics and Environmental Programs, and Nuclear Fuel Management Groups plus SCE&G upper management.

Appropriate documentation including drawings, schematic diagrams, procedures, emergency plans, etc., are readily available.

Arrangements for portable backup

'Bo I

o 8305180373 830516 PDR ADDCK 05000395 F

PDR

t' e

9 Mr. Harold R.

Denton Generic Letter 82-33 Back-up EOF May 16, 1983 Page #2 equipment, coordination with offsite authorities and a continuity of dose projection and decision making capability will be provided.

SCE&G feels the advantages discussed above are adequate justification to locate the backup EOF a short distance

[five (5) miles) outside the twenty (20) mile distance required in Generic Letter 82-33.

Accordingly, we request an exemption from that requirement.

Please respond to our request at your earliest convenience.

Very truly yours, f(

O. W. Dixon, Jr.

NEC:RBC:OWD/fjc cc:~

V.

C.

Summer T.

C. Nichols, Jr./O. W.

Dixon, Jr.

E. H. Crews, Jr.

E.

C.

Roberts H.

N. Cyrus J. P. O'Reilly Group / General Managers O. S. Br&dham R.

B.

Clary C. A.

Price A.

R. Koon C.

L. Ligon (NSRC)

G. J. Braddick J.

C. Miller J. L.

Skolds J.

B. Knotts, Jr.

NPCF File (Lic./Eng.)

. - -