ML20074A654
| ML20074A654 | |
| Person / Time | |
|---|---|
| Site: | Kewaunee |
| Issue date: | 05/02/1983 |
| From: | Ruiter G WISCONSIN PUBLIC SERVICE CORP. |
| To: | |
| Shared Package | |
| ML20074A653 | List: |
| References | |
| NUDOCS 8305130251 | |
| Download: ML20074A654 (5) | |
Text
.
t DOCKET 50-305 KEW AUNEE NUCLEAR POWER PLA NT
SUMMARY
OF OPERATING EXPERIENCE April, 1983 CPERATIONS:
The Cycle VIII-IX Refueling Cutage continued through April.
The core reload was completed on April 22.
MAINTENANCE:
Refueling outage continued during the month.
Surveillance testing, as required by Tech. Spec.,
is in progress.
Ecplaced a
faulty amplifier in Tavg summing circuit.
Replaced a de fective relay in Containment Spray control circuit.
Replaced de f ectiv e resistors in Engineered Safeguards test lamp circuit.
Replaced a defective relay in Reactor Control &
Protection circuit.
Ecplaced and/or repaired several defective valves in RCS.
Repaired several limitorque valve operators.
Installed equipment and rerouted cable for Appendix E modifications.
Inspected and replaced, as required, seals on both ECPs.
Installed Charging Pump suction stabilizers.
8305130251 830510 PDR ADOCK 05000305 R
PDR i
f
-~
PAGE 2 3
Eebuilt a EUR Pump.
Repaired several defective breakers.
F AV ERAGE DAILY UNI T POW ER LEVEL DOCEET NO-50-305 UNIT-KEWAUNEE COEPLETED BY-G.
H.
RUITER TELEPHONE-414-388-2560 X225 REPORT HCNTH APEIL, 1983 AVERAGE DAILY DAY POWER LEVEL (MW E-N ET) 1 0
2 0
3 0
4 0
5 0
6 0
7 0
8 0
9 0
10 0
11 0
12 0
13 0
14 0
15 0
16 0
17 0
18 0
19 0
20 0
21 0
22 0
23 0
24 0
25 0
26 0
27 0
28 0
29 0
7 30 0
s
.)
U N IT SHUTD0W N S A ND POW EB EEDUCTIONS
~
DOCKET NO: 50-305 UNIT N AME: Kewaunce DATE: flay 2, 1983 COMPLETED Br:
G.
H.
Ruiter T ELEP110N E: 414-388-2560 x 225 C
BEPORT MONTil - APEIL, 1983 I
i i
NO. I DATE iTTPE lDURATIONiREASONl5ETHOD} LEE NUMBER ]SYS l COMPONENT}
COMMENTS l
~
I I
t I
1 4
1 1
I i
1 1
1 1
1 I
I e
~
l 1 14/ 1/831 S I 719.0 i C i 1 i
N/A I ZZ l 22222:
I
- 1. Continued Cycle VIII-II refueling outage.
I i
I i
1 1
1 I
I I
i i
I I
I i
i i
I I
I I
I i
~
l I
I I
I I
I I
i 1
1 l
3 I
I I
I I
I I
I i
i I
i i
i I
i I
I I
I i
~
l I
I I
I I
I i
1 I
i I
I I
I I
i i
i I
I i
I I
I I
i i
i i
I I
I I
I I
I I
I J
i I
i 1
8 I
I I
I I
I I
I I
I I
I I
I I
I i
1 1
I I
g.
I I
I I
I I
I I
I I
I I
I I
I i
i i
I I
I 1
I I
I I
I I
I I
I i
1
(-
l I
I 1
1 1
I I
I I
I I
1 I
I I
I 1
i i
I i
i 1
1 1
I I
I I
I I
i 1
i i~
l i
I I
I I
I I
I i
l
[
l i
I I
I I
I I
I I
i I
I I
i 1
1 1
I I
I I
,~
l I
I I
I I
I I
I I
I 1
I I
I I
i 1
1 I
I I
I I
I I
l l
l 1
1
- I l
1 l
l 8
I I
1 l
l l
1 I
I I
I I
I i
i I
I I
I I
I I
I I
I I
I I
I I
I I
i 1
1 1
I I
I I
l I
I I
i 1
1 1
I I
I I
,I I
.I
.I I
I, J
i, i
I
,i 1-TYPE EE AS O N ftETHOD SYSTEM S COMPONENT CODES l
F: Forced A-Equipment Failure (Explain) 1-Sanual Fron*NUREG-0161 l*
S: Scheduled B-saintenance or Test 2-Manual Scras g
C-Befueling 3-Automatic Scram l
D-Bequlatory Bestriction 4-Continuations i
E-Operator Training & License Ezanination 5-Load Reductions C
F-Ad ministra tive 9-Other G-operational Error (Explain!
1 l
b-Other (Explaint g
l l
l
l a
OPERATI NG D ATA REPO2T
^
e DOCKET NO-50-305
- l COMPLETED BY-G.
H.
RUITER OPER ATI NG S T A T
't S TELEPHONE-414-388-2560 1225 w
1 UNIT NAME KEWAUNEE e
e t) 2 REPORTING PERIOD APRIL, 1983
- NOTES
(
3 LICENSED THEEM AL POWER (MWT) 1650 Schedaled refueling outage continued through this entire reporting period.
4 N AMEPLATE R ATING (GROSS MWE) 560 j
5 DESIGN ELECTRICAL RATING (NET MWE) 535 6 MAXIMUM DEPENDABLE CAPACITY (GROSS MW E) 542 7 MAKIM'JM DEPENDABLE CAPACITY (NET MWE) 514
- ?******************************************
d IF CHANG ES CCCUB IN CAPACITY RATINGS (ITEMS NUMDER 3 THROUGH 7) SINCE LAST REPOET, GIVE REASONS None
~
9 POWER LEVEL To kHICH RESTRICTED, IF ANY (NET MWE) None 10 REASCNS FOR EESTRICTIONS, IF ANY a
J THIS MONTH YR-TC-DATE CUMULATIVE g
11 HOURS IN REPORIING PERIOD 719 2879 77784 12 NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 1838.7 65590.4 b
13 REACTOR RESERVE SHUTDOWN HOURS 0.0
- 0. 0 2330.5 14 HOURS GENERATOR ON-LINE O.0 1822.9 64299.5 15 ULIT RESERVE SUIDOWN HOURS
- 0. 0
- 0. 0 10.0 l
16 GROSS THEEMAL EbERGY GENERATED (MWH) 0 2970698 100070699 J
17 Gl.0SS ELECTRICAL ENERGY GENERATED ( M W H) 0 968100 32935700 18 NET ELECTRICAL ENERGY GENERATED (MWH) 0 924039 31349147
/
19 UNIT SERVICE FACTOR 0.0 63.3 82.7 a
20 UNIT AVAILABILITY FACTOR 0.0 63.3 82.7
~
21 UNIT CAPACITY FACTOR (USING MDC NET) 0.0 62.4 77.3 22 UNIT C AP ACITY F ACTOR (USING DER NET) 0.0 60.0 75.3 g,
23 UNIT FORCED OUT AGE R ATE 0.0
- 0. 0 4.2 24 SHUIDOWNS SCHEDULED OVER NEIT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH)
None 1
25 IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP - May 10, 1983 II
~