OPERATING DATA REPORT DOCKET NO. 050-237 DATE May 2.
1983 COMPLETED BY B. A. Schrceder TELEPHONE (815) 942-2920 OPERATING STATUS NOTES 1.
Unit Name:
Dresden II 2.
Reporting Period:
April, 1983 3
Licensed Thermal Power (MWt):
2,527 4.
Nameplate Rating (Gross MWe):
828 5
Design Electrical Rating (Net MWe): 794 6.
Maximum Dependable Capacity (Gross MWe):
812 7
Maximum Dependable Capacity (Net MWe):
772 8.
If Changes Occur in Capacity Ratings (items 3 Through 7) Since Last Report, Give Reasons:
N/A 9
Power Level to Which Restricted, if Any (Net MWe):
N/A 10.
Reasons For Restrictions, If Any:
N/A This Month Yr-to-Date Cumulative.
11.
Hours in Reporting Period 719 2879 113639 12.
Number of Hours Reactor Was Critical 127.45 295.78 87154.63 13 Reactor Reserve Shutdown Hours 0
0 0
14.
Hours Generator On-Line 106.67 274.80 83095.03 l
15.
Unit Reserve Shutdown Hours 0
0 0
16.
Gross The'rmal Energy Generated (MWH) 104.124 331,744 165,813,253 17 Gross Electrical Energy Generated (MWH) 29.936 99,705 52,987,971 18.
Net Electrical Energy Generated.(MWH) 23,405 80,171 50,077,361 19 Unit Service Factor 14.84 9.54 73.12 20.
Unit Availability Factor 14.84 9.54 73.12 21.
Unit Capacity Factor (Using MDC Net) 4.22 3.61 57.08 22.
Unit Capacity Factor (Using DER Net) 4.10 3.51 55.50 23 Unit Fcreed Outage Rate 0.0 0.0 11.63 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
July, 1983 for Snubber inspection.
25 If Shut Down At End Of Report Period, Estimated Date of Startup:
N/A l
S305130202 g3ngog DR ADOCK 05000g37 PDR l
OPERATING DATA REPORT DOCKET NO.
050-249 DATE May 2, 1983 COMPLETED BY B. A. Schroeder TELEPHONE o4,_,okn m3m OPERATING STATUS NOTES 1.
Unit Name:
Dresden III 2.
Reporting Period: April, 1983 3
Licensed Thermal Power (MWt):
2,527 4.
Nameplate Rating (Gross MWe):
828 5
Design Electrical Rating (Net MWe):_294 6.
Maximum Dependable Capacity (Gross MWe): 812 7
Maximum Dependable Capacity (Net MVe):
773 8.
If Changes Occur in Capacity Ratings (Items 3 Through 7) Since Last Report, Give Reasons:
N/A 9
Power Level to Which Restricted, if Any (Net MWe):
N/A 10.
Reasons For Restrictions, if Any: N/A l
This Month Yr-to-Date Cumulative.
11.
Hours in Reporting Period 719 2879 103,224 12.
Number of Hours Reactor Was Critical 719 2083.77 77.811.47 13 Reactor Reserve Shutdown Hours 0
0 0
14.
Hours Generator On-Line 719 2813.75 76,271.72 0
15.
Unit Reserve Shutdown Hours 0
0 16.
Gross Thermal Energy Generated (MWH) 1,706,571 6.602.136 152,863,866 17 Gross Electrical Energy Generated (MWH) 554,551 2.157.564 50,809,628 18.
Net Electrical Energy Generated.(MVH) 527,582 2.059.819 47,142,464 19 Unit Service Factor 100.0 97.73 73.89
, 20.
Unit Availability Factor 100.0 97.73 73.89 21.
Unit Capacity Factor (Using MDC Net)
'94.93 92.56 59.08 22.
Unit Capacity Factor (Using DER Net) 92.41 90.11 57.52 23.
Unit Forced Outage Rate 0.0 2.27 13.10 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25.
If Shut Down At End Of Report Period, Estimated Date of Startup:
www
DOCKET NO. 050-237 UNIT NAME Dresden II UNIT SHUTDOWNS AND POWER REDUCTIONS DATE May 2, 1983 COMPLETED BY B. A. Schroeder TELEPHONE (815) 942-2920 REPORT MONTH APRIL, 1983 METHOD OF LICENSEE CAUSE & CORRECTIVE NO.
DATE TYPEl DURATION REASON 2 SHUTTING EVENT SYSTEM COMPONENT ACTION TO (HOURS)
DOWN REACTOR 3 REPORT #
CODE 4 CODE 5 PREVENT RECURRENCE I
83-1-8 S
612.3 C
3 Refueling and Turbine overhaul outage.
1 2
3 4
F:
Forced Reason:
Method:
Exhibit G-Instructions for S:
Scheduled A-Equipment Failure (Explain) 1-Manual Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Au,tomatic Scram Event Report (
) File D-Regulatory Restriction 4-Other (Explain)
E-Operator Training & License Examination.
F-Administrative G-Operational Error H-Other (Explain) mAu m.
DOCKET NO. 050-249 UNIT NAME Dresden III UNIT SHUTDOWNS AND POWER REDUCTIONS DATE May 2, 1983 COMPLETED BY B. A. Schroeder I
TELEPHONE (815) 942-2920 REPORT MONTH APRIL. 1983 i
il METHOD OF LICENSEE CAUSE & CORRECTIVE NO.
DATE TYPEl DURATION REASON 2 SHUTTING EVENT SYSTEM COMPONENT ACTION TO (HOURS)
DOWN REACTOR 3 REPORT #
CODE 4 CODES PREVENT RECURRENCE None I
i l
i l
l 1
i i.
i
. 1 2
3 4
)
F:
Forced Reason:
Method:
Exhibit G-Instructions for j
S:
Scheduled A-Equipment Failure (Explain) 1-Manual Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee j
C-Refueling 3-Au,tomatic Scram Event Report (
) File D-Regulatory Restriction 4-Otiier (Explain)
E-Operator Training & License Examination.
F-Administrative G-Operational Error 1
i j
H-Other (Explain)
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 050-237 UtilT II f
DATE May 5, 1983 COMPLETED BY B. A. Schroeder i
4
' TELEPHONE 815/942-2920 MONTH APRIL. 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
4 0
24 0
0 9
25 0
10 0
26 51 11 0
27 14 0 l
l 12 0
28 170 13 0
29 367 f
14 0
30 457 s
15 0
31 16 0
l l
)
I
~
AVERAGE DAILY UNIT POWER LEVEL DOCKET. NO. 050-249 UNIT III DATE May 2,1983 COMPLETED BY B. A. Schroeder TELEPHONE 815/942-2920 i
MONTH APRIL. 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 786 17 764 2
619 18 760 3
698 19 749 4
771 20 751 5
793 21 750 6
789 22 761 7
790 23 390 4
793 24 526 9
784 25 672 10 770 26 759 11 760 27 776 12 749 28 776 775 13 782 29 780 14 772 30
~~
15 771 31
~
~
'I6 763 I
f
,g e
? /#
af
~
,r
.,.c.,
,,_,m,,-,
y,a.-.,,,.,. -
.,e.,
,,.,,,,-,---_-..,,,,,,w.,,.,
DRESDEN UNIT 2 SAFETY RELATED MAINTENANCE - APRIL, 1983 NATURE OF LER OR OUTAGE MALFUNCTION EQUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION Feedwater Pipe Preventive W.R. #26026 N/A N/ A Ground out indications as per request.
Indications 2B LPCI Heat Preventive W.R. # 21651 N/A N/A Removed and replaced heads for cleaning.
Exchanger Recirculation Preventive W.R. #26018 N/A N/A Ground out indications as requested.
Riser Inlet Jeld 2B SBLC Pump Preventive W.R. #21519 N/A N/A Completely rebuilt pump per work instruction.
Recirculation Preventive W.R. #24188 N/A N/ A Removed and tested check valve.
Pump Seal Instr.
' heck Valve BPCI Testable Preventive W.R. # 11574 N/A N/A Replaced valve.
Check Valve 2A LPCI Heat Preventive W.R. #15722 N/A N/A Reset the present shell and tube side Sxchanger relief valves to 375 psig.
32 "B" Core Preventive W.R. #21213 N/A N/A Removed internals, cleaned and installed Spray ECCS Fill parts.
- heck Valve 2A Recirc. Pump Preventive W.R. #21809 N/A N/A Replaced Seal.
seal 2B Recirc. Pump Preventive W.R. #23196 N/A N/A Removed and. reinstalled pump coupling.
3rywell Person-Preventive W.R. #26364 N/A N/A Installed strongback - removed after LLRT.
s ael Access Door
DRESDEN UNIT 2 SAFETY RELATED MAINTENANCE - APRIL, 1983 NATURE OF LER OR OUTAGE MAIJUNCTION EQUIPMENT MAINTENANCE NUMBER CAUSE RESUlli CORRECTIVE ACTION (arway Level Preventive W.R. #14882 N/A N/A Removed old valve block and installed sw. Valve Block a new block.
l
%80 Volt Preventive W.R. #20388 N/A N/A Completed inspection.
Breaker at hus28forMCC 28-7
?2 MSIV Opera-Preventive W.R. #21997 N/A N/A Removed, tested and reinstalled all bor MSIV's.
l putboard MSIV Preventive W.R. #22489 N/A N/A Replaced all cables and checked out Electrical junction boxes.
bables l
Bellow Seal Preventive W.R. #24184 N/A N/A Bench tested Bellow Seal 2-220-2-54.
[nstr. Check Valve pWEDS Valve Preventive W.R. #25295 N/A N/A Removed, overhauled and repacked valve.
2001-5 DWEDS Valve Preventive W.R. #25296 N/A N/A Removed, overhauled and repacked valve.
2001-6 10 2-2001-566 Preventive W.R. #25625 N/A N/A Adjusted limit switch.
Enboard "B" Preventive W.R. #25819 N/A N/A Repaired valve as necessary to reduce Peedwater Check leakage.
J2 CRD 50-35 Preventive W.R. #25988 N/A N/A Put new teflon tape on.
,-3 Cup on Preventive W.R. #26048 N/A N/A Changed out both "O" ring and plug.
2 iccum. 58-23
DRESDEN UNIT 2 SAFETY RELATED MAINTENANCE - APRIL, 1983 MALFUNCTION NATURE OF LER OR OUTAGE EQUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION tccum. 50-35 Preventive W.R. #26089 N/A N/A Tightened down fittings.
Lir Supply to Preventive W.R. #26298 N/A N/A Reinstalled fitting.
!001-106 Valve lod Select for Preventive W.R. #26410 N/A N/A Replaced Relay 58-35.
L-9 tefuel Platform Preventive W.R. #26412 N/A
'N/A Replaced #2 track switch.
- ontrol Rod Preventive W.R. #26421 N/A N/A Removed and replaced control rod blade, llade
.PIOi 08-49C Preventive W.R. #22641 N/A N/A Performed DIP 700-15 lAPRMS) ilui #21 Detec-Preventive W.R. #23245 N/A N/A Adjusted SRM #21 detector.
sor Position l2 MOV 1501-38B Preventive W.R. #260'16 N/A N/A Relocated pushbutton station.
tx Head Cooling Preventive W.R. #26172 N/A N/A Installed new drain valves.
[ solation
)2 Safety Preventive W.R. #21886 N/A N/A Removed and replaced safety valves, ralves 10% Functional Preventive W.R. #24900 N/A N/A Removed, bench tested and replaced two rest of Safety-Hydraulic snubbers.
telated Hydrau-Lic Snubber 2B CCSW Pump Preventive W.R. #26515 N/A N/A Operated and lubricated cubicle limit 3reaker switch in case.
DRESDEN UNIT 2 SAFETY RELATED MAINTENANCE - APRIL, 1983 NATURE OF LER OR OUTAGE MALFUNCTION EQUIPMENT MAINTENANCE NL'MBER CAUSE RESULT CORRECTIVE ACTION MOV 1501-19A Preventive W.R. #25801 N/A N/A Reset breaker setting.
U2 480V Main Preventive W.R. #06745 N/A N/A Completed Inspections.
Feed and Bus (Main Package)
Tie Breakers U2 480 Volt Preventive W.R. #06745 N/A N/A
?crformed inspection on Bus Tie 25-26.
Main Feed and (Slave #1)
Bus Tie Breakers U2 480 Volt Preventive W.R. #06745 N/A N/A Completed inspection on Bus Tie 25-27.
Main Feed and (Slave #2)
Bus Tie Breakens U2 480 Volt Preventive W.R. #06745 N/A N/A Performed inspection on main feed Bus 25.
Main Feed and (Slave #3)
Bus Tie Breaker U2 480 Volt Preventive W.R. #06745 Main Feed and (Slave #4)
N/A N/A Completed inspection on main feed Bus 26.
Bus Tie Breaka U2 480 Volt Preventive W.R. #06745 N/A N/A Completed inspection on main feed Bus 27.
Main Feed and (Slave #5)
Bua Tie Breaker U2 480 Volt Preventive W.R. #06745 N/A See W.R. #20392 Main Feed and (Slave #6)
Bus Tie Breaker U2 480 Volt Preventive W.R. #06745 N/A N/A Completed inspection on main feed Bus 29.
Main Feed and (Slave #7)
Bus Tie Breaker
DRESDEN UNIT 2 SAFETY RELATED MAINTENANCE - APRIL, 1983 NATURE OF LER OR OUTAGE MALFUNCTION EQUIPMENT HAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION
,12 480 Volt Preventive W.R. #06745 N/A N/A Performed inspection on Bus Tie 28-29 on
[tain Feed and Bus 28.
hus Tie Breaken
- 32 480 Volt Preventive W.R. #06745 N/A N/A Performed inspection on Bus Tie 28-29 on klainFeedand (Slave #9)
Bus 29.
Bus Tie Breaker solation Con-Preventive W.R. #24972 N/A N/A Inspected gasket and reinstalled cover.
denser Manway llatch D2 Feedwater Preventive W.R. #26305 N/A N/A Replaced pressure bonnet seal ring.
!)S01-5A Valve Preventive W.R. #26465 N/A N/A Installed new motor.
2 -1501-3A Valve Preventive W.R. #22973 N/A N/A Replaced valve stem.
APRI! Channels Preventive W.R. #24545 N/A N/A Returned scram and rod block set points 1-6 to normal.
"A" CCSW Pump Preventive W.R. # 19408 N/A N/A Inspected valve for hard opening. Repaired Discharge as necessary.
Valve D2 D/W Equip.
Preventive W.R. #24662 N/A N/A Opened equipment hatch.
Hatch U2 West Torus Preventive W.R. #21655 N/A N/A Opened manway.
Manway IBLC Pump "A" Preventive W.R. #22615 SN/A N/A Repacked "A" SBLC pump and replaced guide bushing.
DRESDEN UNIT 2 SAFETY RELATED MAINTENANCE - APRIL, 1983 NATURE OF LER OR OUTAGE MALFUNCTION SQUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION J2 CRD Hydrau-Preventive W.R. #20712 N/A N/A Rebuilt all scram pilot solenoid valves Lic Modules on the East-East -bank.
Peedwater Check Preventive W.R. #26736 N/A N/A Tightened valve bonnet and seal ring leak.
lalve LPCI Torus Preventive W.R. #24912' N/A N/A Tightened all screw connections.
Spray Valve Z-1501-3B Valve Preventive W.R. #22974 N/A N/A Replaced valve stem.
N/A N/A Closed CRD hatch.
Installed two new 32 CRD Hatch Preventive W.R. #21661.
"0" rings.
Breaker D/W Preventive W.R. #20172 N/A N/A Greased both inboard and outboard shift forus Vacuum housing.
Relays 1430-Preventive W.R. #26489 N/A N/A Replaced coil wires.
101A&B AO 2-220-46 and Preventive W.R. #25114 N/A N/A Removed valve from valve body and 2-220-47 inspected for obstruction.
Refuel Grapple Preventive W.R. #26040 N/A N/A Could not find any problem - operating properly.
Refueling Preventive W.R. #26041 N/A N/A Could not find any problem - operating Platform properly.
Refueling Preventive W.R. #25344 N/A N/A Installed two track switches and Platform adjusted.
24/48 Volt Preventive W.R. #25469 N/A N/A Replaced bad cells.
Battery
.go l
rep mu N
j O
d I
T e
C ra A
e l
E c
V I
d T
n C
a ER s
R r
O e
C p
mu j
devome R
3 8
9 T
1 LU A
S
/
L N
E N
I O
R R
I P
T A
CN U
F 2
E L
C A
E N
M S
T A
U A
I N
A
/
N E
C N
U TN N
I E
A D
M S
E D
E R
E G
D T
A A
T L
UR E
OE R
B RM Y
OU T
N L-R F
E A
L S
3 1
2 5
2
//
E FC ONA R.
EN W
RE UT e
TN v
AI i
NA t
M never P
TN E
M k
P c
I o
U l m Q
B e E
t d s
- o. y, l
DRESDEN UNIT 3 SAFETY RELATED MAINTENANCE - APRIL, 1983 MALFUNCTION NATURE OF LER OR OUTAGE EQUIPMENT MAINTENANCE NUMBER CAUSE RESUUr CORRECTIVE ACTION 3rywell Equip.
Preventive W.R. #26168 N/A N/A '
Opened and closed drywell equipment datch hatch.
33 3 Battery Preventive W.R. #26038 N/A N/A Adjusted CFA relay card - alarm cleared.
- harger 250 VDC Safety-Related Preventive W.R. #25476 N/A N/A Inspected breaker settings.
40 tor Operated
/alves 33 24/48 VDL Preventive W.R. #25979 N/A N/A Replaced timer.
Battery East top Charger RBM Channel #7 Preventive W.R. #20527 N/A N/A Changed out contact block on RBM Channel Recorder Push
- 7.
Button 40V 1402-25B Preventive W.R. #25827 N/A N/A Adjusted settings to new numbers.
dOV 1501-27A Preventive W.R. #25826 N/A N/A Adjusted settings to new numbers.
HOV 1201-4 Preventive W.R. #26189 N/A N/A Adjusted settings to new numbers.
dOV 1402-25A Preventive W.R. #25828 N/A N/A Adjusted settings to new numbers.
LPCI Min Flow Preventive W.R. #25693 N/A N/A Replaced sealtite that was broken, valve 1501-13B Valve 125V Battery Preventive W.R. #25220 N/A N/A Replaced fuses.
Charger Safety-Related Preventive W.R. #25289 N/A N/A Adjusted 1201-4.
Operated Valves
(
DRESDEN UNIT 3 SAFETY RELATED MAINTENANCE - APRIL, 1983 MALFUNCTION NATURE OF LER OR OUTAGE EQUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION U3 Diesel Preventive W.R. #25885 N/A N/A Installed two new air start motors.
Generator U3 MO 3-1402-38 Preventive W.R. #26036 N/A N/A Replaced dirty auxiliary contact.
Valve Personnel Lock Preventive W.R. #26200 N/A N/A Checked out operations.
"B" Recirc.
Preventive b,l. #26198 N/A N/A Tightened five bonnet bolts on valve.
Valve LPCI SA Suction Preventive W.R. #26423 N/A N/A Removed broken manual handwheel from U3 Velve and replaced with like part.
LPRM 48-49B3 Preventive W.R. #24300 N/A N/A Four.d no apparent problem.
REM Preventive W.R. #25860 N/A N/A Reduced RBM rod block set points.
30 3-1501-3B Preventive W.R. #26606 N/A N/A Increased torque setting on close torque switch.
MO 3-2301-10 Preventive W.R. #26587 N/A N/A Securely refastened limit switch; reset limits.
LPCI Min Flow Preventive W.R. #26460 N/A N/A Replaced auxiliary contact in breaker H0 3-1501-13B and replaced torque switch.
APRM Preventive W.R. #25859 N/A N/A Reduced scram and rod block set points by 3.5%.
Main Steam Line Preventive W.R. #24680 N/A N/A Replaced worn gear assembly and recali-liigh Flow brated switch.
Switch
DRESDEN UNIT 2/3 SAFETY RELATED MAINTENANCE - APRIL, 1983 NATURE OF LER OR OUTAGE MALFUNCTION EQUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION Spare Diesel Preventive W.R. #25574 N/A N/A Rebuilt air start motors.
Air Start Motor Spare Air Start Preventive W.R. #25883 N/A N/A Rebuilt air start motor.
Motor Diesel Air Start Preventive W.R. #25750 N/A N/A Rebuilt two air start motors.
Motors (Spare)
Diesel Genera-Preventive W.R. #25722 N/A N/A Rebuilt air start motors.
tor Air Start Motors 2/3 "B" SBGTS Preventive W.R. #26112 N/A N/A Replaced solenoid.
Fan Suction Versa Valve 2/3 DG Cooling Preventive W.R. #25088 N/A N/A Calibrated pressure switch.
H O Low Pres-2 ture Switch 2/3 Diesel Preventive W.R. #25203 N/A N/A Performed inspection per procedure.
Generator
SUMMARY
OF OPERATING EXPERIENCE J
UNIT TWO l
APRIL, 1983 4-1 to 4-25 Unit Two was shutdown for the greater portion of the month for its scheduled refueling and equipment outage. Major work included feedwater check and MSIV valve overhaul, i
repacking of vacuum breakers, local leak rate and integrated I
leak rate tests.
4-25 to 4-30 Unit Two reactor went critical at 0930 hrs followed by criticality checks. On the 26th, at 1320 hrs the unit was i
placed on-line which officially ended this refueling period.
~
Unit Two reached a power level of 538 MWe. The final results for the month was a capacity factor of 4.98% and an avail-ability of 14.83%.
i
+
1 i
l h
l i
-,.. -.. - -. ~ ~ -.,, -,.. -.,.. _
..,._,.7.,.._
-,_m.....m._,.
,,,_,,,,-,.,_,__.____--m.-.-.y.._.r._.
SLMfARY OF OPERATING EXPERIENCE UNIT THREE a
APRIL, 1983 4-1 to 4-30 Unit Three entered the month operating at a power level of 828 MWe and operated continuously throughout the entire 4
month (with normal power reductions on weekends for surveil-lances), reaching a power level of 331 MWe with a capacity factor of 92.73% and an availability of 100%.