Monthly Operating Rept for Apr 1983
ML20074A435
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/02/1983
From: Bogart D, Culver M
FLORIDA POWER CORP.
To:
Shared Package
ML20074A433 List:
References
NUDOCS 8305130047
Download: ML20074A435 (4)


Text

OPERATING DATA REPORT DOCKET NO. 50-302 DATE 5 /2 /83 COMPLETED BY D. Bogart TELEPHONE (904) 795-6486 OPERATING STATUS

1. Unit Name:

Crystal River Unit #3 Notes

2. Reporting Period:

4/1/83 - 4/30/83

3. Licensed Thermal Power (MWt):

2544 890

4. Nameplate Rating (Gross MWe):

825

5. Design Electrical Rating (Net MWe):

850

6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

811

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A

9. Power Level To Which Restricted. If Any (Net MWe):

N/A

10. Reasons For Restrictions. If Any:

N /A This Month Yr.-to-Date Cumulative

11. Hours In Reporting Period 719 2879 51759
12. Number Of Hours Reactor Was Critical 0

1859.3 34066.5

13. Reactor Reserve Shutdown Hours 0

0 1280.3

14. Hours Generator On-Line 0

1859.3 33326.2

15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 0 4488404 75013359 0

1573896 25540513

17. Gross Electrical Energy Generated (MWH) l
18. Net Electrical Energy Generated (MWH) 0 1502253

__24247133

19. Unit Service Factor 0%

64.6%

62.0%

20. Unit Availability Factor 07 64.6%

62.0%

21. Unit Capacity Factor (Using MDC Net) 0%

64.3%

57.2%

22. Unit Capacity Factor (Using DER Net) 0%

63.2%

54.7%

23. Unit Forced Outage Rate 0%

0%

25.0%

24. Shutdowns Scheduled Oser Next 6 Months (Type. Date, and Duration of Each t:

Refuel outage which began 3/19/83, scheduled to last 16 weeks.

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

7/10/83

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 1/14/77 INITIAL ELECTRICITY 1/30/77 COMM ERCIAL OPER ATION

'}f_13 /77 8305130047 830509 PDR ADOCK 05000302 (9p7) i PDR l

R

-r w

j AVERAGE DAILY UNIT POWER LEVEL

+

DOCKET NO. 50-302 UNIT FiCRP-3 DATE 5/2/83 COMPLETED BY D.

Bocart TELEPHONE (904) 795-6486 MONTH Anril 1983 i

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(ywe. Net) 0 I

n i7 0

2 0

gg 0

0 l

3

,9 4

20 0

5 0

0 2g 0

6 22 0

7 23 0

8 0

24 n

0 9

25 0

0 10 26 II O

27 0

0 12 28 0

0 0

13 29 14 0

30 0

0 15 3l I6 l

INSTRUCTIONS On this format,hst the average daily unit power levelin MWe. Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9 /77 )

,o DOCKET NO. 50-302 UNITSHUTDOWNS AND POWER REDUCTIONS UNIT NAME FLCRP ~l DATE 5/4/83 COMPLETED BY M W.

Culver REPORT MONTH 4/83 TELEPHONE (40&T 70s_6&R6 m

"L jg "h

E Licensee Eg h.

Cause & Corrective No.

Date g

Eg jss Event gg g3 Action to H

y 5

3 gjj g Report #

mO u

Prevent Recurrence o

u O

83-04 830401 S

719 C

4 N/A RC FUELXX Refueling outage.

I 2

3 4

F: Forced Reason:

Method:

Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C-Refueling 3 Automatic Scram-Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E. Operator Training & Ucense Examination F-Administrative 5

G-Operational Error (Explain)

Exhibit I - Same Source 19/77) llother (Explain) 9

MONTHLY OPERATIONAL

SUMMARY

STATEMENT DOCKET NO. 50-302 UNIT FLCRP-3 DATE 5/4/83 COMPLETED BY M.W. Culver TELEPHONE (904) 796-6486 MONTH April 1983

SUMMARY

STATEMENT:

Shutdown all month for Refuel IV.

i e

l l

l _., _ _. _, _..,_,-.

-. -.. --