AVERAGE DAILY UNIT POWER LEVEL Docket No.
50-311 Unit Name Salem # 2 Date April 10, 1983 Completed by L. K. Miller Telephone 609-935-6000 Extension 4455 Month March 1983 Day Average Daily Power Level Day Average Daily Power Level (MWe-NET)
(MWe-NET) 1 0
16 0
2 0
17 0
3 0
18 0
4 0
19 0
5 0
20 0
6 0
21 0
7 0
22 0
8 0
23 0
9 0
24 0
10 0
25 0
11 0
26 0
12 0
27 0
13 0
28 0
14 0
29 0
15 0
30 0
31 0
Pg. 8,1-7 R1 8304180327 830410 PDRADOCK05000g R
Page 2 of 11
OPERATING DATA REPORT Docket No. 50-311 Date April 10, 1983 Telephone 935-6000 Completed by L. K. Miller Extension 4455 Operating Status 1.
Unit Name Salem No. 2 Notes 2.
Reporting Period March 1983 3.
Licensed Thermal Power (MWt) 3411 4.
Nameplate Rating (Gross MWe) 1162 5.
Design Electrical Rating (Net MWe) 1115 6.
Maximum Dependable Capacity (Gross MWe) l149 7.
Maximum Dependable Capacity (Net MWe) 1106 8.
If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give Reason N/A 9.
Power Level to Which Restricted, if any (Net MWe) O
- 10. Reasons for Restrictions, if any REFUELING OUTAGE This Month Year to Date Cumulative
- 11. Hours in Reporting Period 744 2160 12866
- 12. No. of Hrs. Reactor was Critical 0
470.3 10925.9
- 13. Reactor Reserve Shutdown Hrs.
0 3.3 38.9
- 14. Hours Generator On-Line 0
459.4 10796.6
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 0 1109383.2 31625932.2
- 17. Gross Elec. Energy Generated (MWH) 0 257340 10t73590
- 18. Net Elec. Energy Generated (MWH)
(2283) 231769 9805416
- 19. Unit Service Factor 0
21.3 83.9
- 20. Unit Availability Factor 0
21.3 83.9
- 21. Unit Capacity Factor (using MDC Net) 0 9.7 68.9
- 22. Unit Capacity Factor (using DER Net) 0 9.6 68.4
- 23. Unit Forced Outage Rate 0
8.6 3.5
- 24. Shutdowns scheduled over next 6 months (type, date and duration of each)
Refueling Outage, January 22, 1983, 18 weeks
- 25. If shutdown at end of Report Period, Estimated Date of Startup:
May 9, 1083
- 26. Units in Test Status (Prior to Commercial Operation) :
Forecast Achieved Initial Criticality 6/30/80 8/2/80 Initial Electricity 9/1/80 6/3/81 Commercial Operation 9/24/81 10/31/81 8-1-7.R2 Page 3 of 11
t UNIT SHUTDOWN AND POWER REDUCTIONS Docket No. 50-311 REPORT MONTH March 1983 Unit Name Salem No.2 Date April 10, 1983 Completed by L.K. Miller Telephone 609-935-6000 Extension 4455 Method of Duration Shutting License Cause and Corrective No.
Date Type Hours Reason Down Event System Component Action to 1
2 Reactor Report Code 4 Code 5 Prevent Recurrence Generator Maj Overhaul 83-046 1/21 S
1657.6 C
4 HA GENERA (Gen Overhaul items)
Major Turbine Overhaul 83-046 1/21 S
1657.G C
4 HA TURBIN (Gen Overhaul items)
Misc Major 83-046 1/21 S
1657.6 C
4 HC HTEXCH Condenser Overhaul Nuclear Normal 83-046 1/21 S
1657.6 C
4 CA FUELXX Refuelina 1
2 Reason 3 Method 4 Exhibit G 5 Exhibit 1 F: Forced A-Equipment Failure-explain 1-Manual Instructions Salem as S: Scheduled B-Maintenance or Test 2-Manual Scram.
for Prepara-Source C-Refueling 3-Automatic Scram. tion of Data D-Regulatory Restriction 4-Continuation of Entry Sheets E-Operator Training & Licensing Exam Previous Outage for Licensee F-Administrative 5-Load Reduction Event Report G-Operational Error-explain 9-Other (LER) File H-Other-explain (NUREG 0161)
Page 4 of 11
DOCKET NO:
50-311 MAJOR PLANT MODIFICATIONS REPORT MONTH MARCH 1983
- UNIT NAME:
Salem 2 DATE:
3ppTT 10. 1993 COMPLETED BY:
L.K. Miller TELEPHONE:
609/935-6000 X4455
- DCR NO.
PRINCIPLE SYSTEM SUBJECT 2EC-0686 Waste Disposal Liquid Increase the size of refueling canal drain valve and install.
2EC-0813 SWS and CP - VRS Add break flanges at No. 21, 22, 23, 24 and 25 motor units; Modify front and rear access openings and plates.
2EC-0865 Condet. sat e Replace condensate pump bearing with new split type.
2ET-0938A Circulating Water Add Apollo Tech pump house.
2EC-1378 Safeguard Emergency Install modified chassis into the SEC Control cabinets.
2SC-0439 Manipulator Crane Purchase and install modification kit to change existing gripper operation of air to disengage and gravity to engage to dual cylinder air to engage and discharge.
2SC-0750 Steam Generator Alarm High steam generator blowdown cation conductivity alarm, change from 2.0 micrombos to 0.8 micromhos; Low steam generator blowdown pH, change from 8.4 to 8.5; Steam generator inlet high dissolved oxygen alarm change from 20% of range to 5 ppb.
l l
l
- DESIGN CHANGE REOUEST 8-1-7.R1 Page 5 of 11
MAJOR PLANT MODIFICATIONS DOCKET NO.:
50-311 REPORT MONTH MARCH UNIT NAME:
Salem 2 DATE:
April 10, 1983 COMPLETED BY:
L.K. Miller TELEPHONE:
609/935-6000 X4455
- DCR NO.
10CFR50.59 SAFETY EVALUATION 2EC0686 This change does not in any way affect the safe shutdown of the plant.
No unreviewed safety questions are involved.
2EC0813 This change does not alter the original design concept of the service water system.
No unreviewed safety questions are involved.
2EC0865 This design does not affect any safety related components or systems.
No unreviewed safety or environmental questions are involved.
2ET0938A This change does not affect plant safety functions margin or operation.
No unreviewed safety or environmental questions are involved.
2EC1378 This change will improve the noise immunity of the electronics.
No unreviewed safety or environmental questions are involved.
2SC0439 Changing the method of gripping does not affect the logic of the existing safety features nor increase the possibility of dropping the fuel assembly because existing interlocks will not be affected.
No unreviewed safety or environmental questions are involved.
2SC0750 The setpoints do not enter into the logic for the basis of any of the Technical Specifications.
No unreviewed safety or environmental questions are involved.
Design Change Request Page 6 of 11
PSE&G SAIE4 GENERATING STATION SAFLTY REIATED UORK ORDER IOG SAIR1 UNIT NO. 2 WO NO DEPT UNIT B2UIIMENP IDFRTIFICATION 905535 M
2 VALVE, 2CV57 FAILURE DESCRIPTION: VALVE IEAKS BY.
820813.
LtRRECTIVE ACTION:
REPIACED BONNIJf, SPINDLE AND DIAPIIRAM. 830304.
909767 M
2 HEAT EXCHANGER, 220C FAILURE DESCRIPTION: 'IUBE LEAKS IN HEAT EXCHANGER. 821112.
CORRECTIVE ACTION:
PIDGGED 'IUBE 47 ION 16.
821122.
910076 M
2 VALVE, 2CV50 i
FAILURE DESCRIPTION: VALVE LEAKS TIIIOUGil. 821215.
1
~
CORRECTIVE ACTION:
REPIACED VALVE IAW DCP 2EC-1560 PKG 1 REV3 ODCN M6/O. 821219.
919611 M
2 VALVE, 245W24 FAILURE DESCRIPTION: SAUNDERS VALVE IIAS LEAKING DIAPHRAM. 821228.
CORRECTIVE ACTION:
REPIACE VALVE. 830112.
i 927352 M
2 VALVEOP, 2CV40 i
FAILURE DESCRIPTION: RDOVE FDIOR/ BRAKE FROM 2CV40 EOR USE ON 10.1 UNIT. REPIACE WITH FDIOR/BRM8 FROM NO.1 UNTT UHEN REPAIRED.
CORRECTIVE ACTION:
RDOVED FDIOR AND BRAKE AND REPIACED UITH NEW FDIOR AND BRAKE.
930855 M
2 D1 ERG. DIESEL, #2C l
FAILURE DESCRIPTION: WHILE RUNNING DIESEL EOR FDIMILY SURVEILIANCE, OPERA'IOR REFORTED CRANKCASE BICWER FAILURE AIARM CONSTANTIX IN AIARFi. 821217.
CORRDCTIVE ACTION:
DAMPERS ONLY OPENING 25% CAUSING A VACUUM IN DIESEL ROO1 AND ACTIVATING CRANKCASE PRESSURE DEVICE. 83113 Page 7 of 11
PSE&G SAIB4 GENEPATING STATION SAFETY REIATED WORK ORDER IOG SALD1 UNIT NO. 2 WO NO DEPT UNIT EQUIRIEfE IDEtEIFICATION 919972 P
2 IY1S 2R18 FAILURE DESCRIPTION: BNITERIES FOUND DEFDCTIVE DURING CALIBRATION PROCEDURES.
CORPI]CTIVE ACTION:
REPIACED DEFECTIVE LEtMING BNITERIES WITH PEi ONES. 821220.
930535 P
2 IWST LEVEL Of D FAIIURE DESCRIPTION: CIANNEL INDICATING 1FT IDfER THAN OTHER OIANNET AND LOCAL INDICA'IOR.
CORRECTIVE ICTION:
RECALIBRATED TRANSMITTERS FOR BOTH OIANIEL AND STILL IIAVE 6 INCII DIFF.
l l
RECALIBRATED TRANSMI'ITERS WITil READINGS TAKEN IN OCNTROL ROOM.
INDICATION SAT.
821129.
930611 P
2 STFNI FIDi, 23S/G Q12 FAILURE DESCRIPTION: INDICATION HIGI CORRFr'1'IVE ACTION:
REPIN'm ROSEMONT TRANSMI' ITER S/N 153033 WITII S/N 157299.
930674 P
2 LEVEL, 21 S/G Q12 FAILURE DESCRIPTION: COtEROLLING LEVEL 012 FAILED HIGI.
CORRECTIVE ACTION:
RD10VED OIANNEL FROM SERVICE WHILE MAIIE DEPT REPACKED 21FW23. FUNCTIONAL SAT.
930710 P
2 STEN 1 PRESS, 22S/G 013 FAILURE DESCRIPTION: CHANtEL IDUND OIJr SPEC.
CORRECTIVE ACTION:
REPIACED CAPACI'IORS C2 & C3 IN COMPARNIOR 2PC526/D POWER SUPPLY. FUNCTIONAL SAT.
930816 P
2 CONT. PERS. AIR LOCK EL. 100 FAILURE DESCRIPTION: SFAL LEAK ON INNT:R DOOR 100 EL AIR LOCK.
CORRDCTIVE ACTION:
REPOSITIONTD DOOR SEAL IN RETAINING GROOVE.
Page 8 of 11
PSE&G SAIB1 GENEPATING STATION SiWETY RELATED FORK OFDER IDG SALDi UNIT to. 2 NO NO DEPP UNIT EQUIPMEt7f IDDTTIFICATION 930840 P
2 PUMP, 23 AUX. FEED FAIIUPE DESCRIPTION: EXCESSIVE IlUITTING AT 3500 RPM.
CORRECTIVE PCTION:
INSTAT.TFD MLW STFFVE BUSHING ON IJNKAGE. ADJUSTED NOOD(@SD GOVERIOR.
930845 P
2 VALVE, 21AF21 FAILURE DESCRIPTION: STROKE TIME IS EXCESSIVE FOR T/S SURVEILIRJCE. PREVIOUS TIME 13 SEC. PRESDTT TIME 19 SEC.
CORRECTIVE ACTION:
PACKING HAD BEEN TIGTTENED DOI.W, SIIMING ACTION OF VALVE. ADJUSTED LIMIT SWI'IGI 'IO OBTAIN PROPER ACTION OF INDICA'IOR.
l Page 9 of 11
SALEM UNIT 2 OPERATIONS
SUMMARY
REPORT MARCII 1983 The First Refueling Outage of Salem Unit No. 2 commenced on January 21st, and has continued through the months of February and March.
t i
l I
Page 10 of 11
REFUELING INFORMATION DOCKET NO.:
50-311 COMPLETED BY:
L.K. Miller UNIT NAME:
Salem 2 DATE:
April 10, 1983 TELEPHONE:
609/935-6000 EXTENSION:
4455 Month April 1983 1.
Refueling information has changed from last month:
YES X
NO 2.
Scheduled date for next refueling:
March 31, 1984 3.
Scheduled date for restart following refueling:
June 10, 1984 4.
A)
Will Technical Specification changes or other license amendments be required?
YES NO NOT DETERMINED TO DATE 4/1/83 B)
Has the reload fuel design been reveiwed by the Station Operating Review Committee?
YES NO X
If no, when is it scheduled? February 1984 5.
Scheduled date(s) for submitting proposed licensing action:
March 1984 (if required) 6.
Important licensing considerations associated with refueling:
NONE 7.
Number of Fuel Assemblies:
A)
Incore 193 B)
In Spent Fuel Storage 72 8.
Present licensed spent fuel storage capacity:
1170 Future spent fuel storage capacity:
1170 1
9.
Date of last refueling that can be discharged to spent fuel pool assuming the present licensed capacity:
March 2000 8-1-7.R4 j