_.
f Saau UNITED STATES 5
=i NUCLEAR REGULATORY COMMISSION k
,/
wasuiworow. o.c. noss5.o e.
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO.14R TO FACILITY OPERATING LICENSE NPF-9 r
AND AMENDMENT NO.130 TO FACILITY OPERATING LICENSE NPF-17 DUKE POWER COMPANY MCGUIRE NUCLEAR STATION. UNITS 1 AND 2 i
DOCKET NOS. 50-369 AND 50-370
1.0 INTRODUCTION
i By letter dated November 11, 1993, as supplemented February 23, April 12 and July 29, 1994, Duke Power Company (the licensee) submitted a request for changes to the McGuire Nuclear Station, Units 1 and 2, Technical Specifications (TS). The amendments reflect the consolidation of the Quality Verification Department with the Nuclear Generation Department that realigned the Nuclear Safety Review Board to report to the Senior Nuclear Officer, change a reference from Semi-Annual to Annual, change an organizational unit term from " group" to " division," modify titles of positions designated to approve modifications and clarify the responsibilities of the Safety Assurance i
Manager.
The February 23, April 12 and July 29, 1994, letters provided clarifying information that did not change the scope of the November 11, 1993, application and the initial proposed no significant hazards consideration determination.
2.0 EVALUATION CONS'0LIDATION OF DEPARTMENTS The consolidation of the Quality Verification Department with the Nuclear Generation Department is reflected on the subject TS pages in TS 6.5.2.8.i wherein Quality Verification Department audits are renamed Quality Assurance Program audits. The audit group is maintained as before with the exception that it is now moved into the Safety Assurance Group. The specification of the list of audits in TS 6.5.2.9 and the requirement that the NSRB review these audits are not changed by this amendment.
Since the envelope of the audits to be performed and the NSRB review requirement are unchanged, this change is acceptable.
REALIGNMENT OF NSRB REPORTING RELATIONSHIP-TS 6.5.2.2. 6.5.2.9.m & 6.5.2.10 The licensee requested changes in an earlier application and the staff approved TS changes in amendments numbered 132 and 114 that elevated certain TS listed reporting relationships to a licensee management level that is 9410040081 940922 7 PDR ADOCK 05000369 4
F PDR2 i
. 1 generally one level higher than the level addressed by NRC staff guidance including the Standard Technical Specification (STS).
Included in these changes was the elevation of the NSRB reporting level to the licensee's Executive Vice President. The licensee requests, in the current amendment application, to return this NSRB reporting rehtionship and associated responsibilities to the Senior Vice President, Nuclear Generation. This change is reflected in TS 6.5.2.2, 6.5.2.9.m and 6.5.?.10.
The Senior Vice President is the licensee's Senior Nuclear Officer and D.? ttaff concludes that this proposal is consistent with general staff guidance in the Standard Review Plan and the STS and is acceptable.
RECORDS OF NSRB ACTIVITIES - TS 6.5.2.11 Consistent with the change in the NSRB reporting relationship discussed above the Executive Vice President is removed from the list for receipt of NSRB meeting minutes, reports and audit reports and the Site Vice President is added to this list. This change provides comparable management levels as contained in the STS and is acceptable.
TECHNICAL REVIEW AND CONTROL ACTIVITIES - TS 6.5.1.3. 6.5.1.5 and 6.6.1 The licensee initially proposed to modify the authority for approval of modifications by deleting specifically named management positions and substituting a generalized delegation authority by the Station Manager.
This was subsequently revised in the submittal of July 29, 1994 to a more restrictive proposal to augment the Station Manager's authority for approving modifications by adding the Manager of Engineering and by revising the position titles in these TS to reflect the titles of these positions in the current licensee organization. The title of Mechanical Superintendent is revised to the Mechanical Maintenance Superintendent and the I and E Superintendent is revised to the I and E/ Maintenance Support Superintendent.
The staff finds these changes to be acceptable as they provide for approval by the appropriate division manager or superintendent level.
SAFETY ASSURANCE MANAGER RESPONSIBILITIES - TS 6.5.1.6 The Safety Assurance Manager's responsibilities are clarified to those of ensuring the development of TS 6.5.1.6 reports and to provide for a designee who may approve these reports from the prior requirement that the Safety Assurance Manager approve all such reports.
This change is acceptable, as the reports are approved and sent to appropriate management levels.
PROCEDVRE APPROVAL AND CHANGE AUTHORITY - TS 6.8.2 AND 6.8.3 The licensee proposed to change the approval authority from " group" manager to
" appropriate division" manager. This change reflects the retitling of comparable management positions due to the reorganization.
Either the former or the current title is consistent with the STS guidance for the appropriate level of management responsibility for this function and is acceptable.
.. SEMI-ANNUAL TO ANNUAL EFFLUENT REPORT-TS 3.11.1.4 The licensee proposes to change the reference from " Semiannual" to " Annual" Radioactive Effluent Release Report in the Radioactive Effluents section to provide consistency with reference to this report in other TS sections. The staff finds these changes acceptable, as the staff has approved the change from a semi-annual to an annual report in Amendments numbered 132 and 119 for McGuire Units 1 and 2, respectively.
ANNVAL INDEPENDENT FIRE PROTECTION AUDIT The reference in the licensee's joint application for all three of its nuclear facilities to delete the annual independent fire protection audit applies only to another facility and not to the McGuire Nuclear Station. Therefore, there is no change to the McGuire TS in this regard. This is acceptable.
3.0 OVERALL
SUMMARY
The staff finds the licensee's proposed changes acceptable, as they meet the appropriate acceptance criteria of Section 13.4 of NUREG-0800, the Standard Review Plan,'and are consistent with the Standard Technical Specifications.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the North Carolina State official was notified of the proposed issuance of the amendments.
The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendments change recordkeeping, reporting, or administrative procedures or requirements. Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(10).
Pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.
l
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that:
(1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.
Principal Contributor:
F. Allenspach R. Martin Date: September 22, 1994