Change Notice 94-04 to Operating QA Manaul,Sections 15.7 & 16.4,enabling Reporting of 10CFR21 Via Other Reporting MechanismsML20073G275 |
Person / Time |
---|
Site: |
Callaway |
---|
Issue date: |
09/21/1994 |
---|
From: |
UNION ELECTRIC CO. |
---|
To: |
|
---|
Shared Package |
---|
ML20073G263 |
List: |
---|
References |
---|
NUDOCS 9410040078 |
Download: ML20073G275 (5) |
|
|
---|
Category:QUALITY ASSURANCE PROGRAM
MONTHYEARML20195C8341998-11-10010 November 1998 Rev 20 to Operating QA Manual ML20195C8181998-11-0909 November 1998 Rev 19 marked-up Changes to Operating QA Manual ML20140J1641997-05-31031 May 1997 Rev 19 to Operating QA Manual ML20140J1591995-11-30030 November 1995 Rev 18 to Operating QA Manual, mark-up,identifying Changes Through Use of Strikeover & Inserts ML20094M5511995-11-30030 November 1995 Rev 18 to Operating QA Manual ML20073G2751994-09-21021 September 1994 Change Notice 94-04 to Operating QA Manaul,Sections 15.7 & 16.4,enabling Reporting of 10CFR21 Via Other Reporting Mechanisms ML20069L7041994-06-30030 June 1994 Rev 17 to Operating QA Manual ML20069N2511994-06-0707 June 1994 Change Notice 94-03 to Rev 16 to Operating QA Manual ML20045C1121993-06-30030 June 1993 Rev 16 to Operating QA Manual. ML20097D8001992-06-30030 June 1992 Rev 15 to Operating QA Manual ML20113H7031992-06-30030 June 1992 Change Notice 92-03 to Operating QA Manual,Rev 15,App a Re Regulatory Guide 1.37 Paragraph C.4 ML20091J3191992-01-0303 January 1992 Change Notice 90-10 to Rev 14 to Operating QA Manual ML20082J9121991-08-31031 August 1991 Rev 14 to Operational QA Manual ML20098D9931991-06-30030 June 1991 Change Notice 90-10 to Callaway Plant Operating QA Manual ML20081H8471991-06-11011 June 1991 Rev 14 to Operating QA Manual ML20043G9361990-06-30030 June 1990 Rev 13 to Operating QA Manual. ML20244D6621989-06-0909 June 1989 Rev 12 to Operating QA Manual ML20214X3981987-06-30030 June 1987 Rev 10 to Operating QA Manual for Facility ML20072S9841983-02-28028 February 1983 Rev 6 to QA Program for Design & Const ML20079J4951982-12-22022 December 1982 to QA Programs for Design & Const 1998-11-09
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217E2691999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Callaway Plant,Unit 1.With ML20212D0711999-09-14014 September 1999 Safety Evaluation Re GL 88-20, Individual Plant Exam for Severe Accident Vulnerabilities ML20212A3361999-09-14014 September 1999 1999 Biennial RERP Exercise, for Callaway Plant. Pages 7,8 & 9 (of 9) in Mini Scenario 1 Section of Incoming Submittal Not Included ML20211N0451999-09-0202 September 1999 Safety Evaluation Concluding That Util Has Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves at Plant That Are Susceptible to Pressure Locking & Binding ML20212A0201999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Callaway Plant,Unit 1.With ML20210P0441999-08-10010 August 1999 Safety Evaluation Granting Licensee Requests for Relief (ISI-13 - ISI-18) from Requirements of Section XI of 1989 Edition of ASME B&PV Code,For Second 10-year Interval ISI at Plant,Unit 1 ML20210Q8331999-08-0505 August 1999 Rev 4 to Callaway Cycle 10 Colr ML20210T9481999-08-0303 August 1999 Informs Commission Re Status of Issues Related to Risk Informed Decision Making That Were Raised During Staff Review of License Amend Approving Electrosleeve SG Tube Repair Method for Ue Callaway Plant,Unit 1 ML20216D8791999-07-31031 July 1999 Rev 3 to Callaway Cycle 10 Colr ML20210T4451999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Callaway Plant,Unit 1.With ML20210H6531999-07-30030 July 1999 SER Accepting Relief Request to Second Ten Year Inservice Insp Plant for Plant,Unit 1 ML20209H0881999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Callaway Plant,Unit 1.With ML20195H4831999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Callaway Plant,Unit 1.With ML20206R7111999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Callaway Plant Unit 1.With ML20205Q5561999-04-19019 April 1999 Safety Evaluation Accepting Relief for Request from Certain ASME Section Requirements for Containment Insp ML20205S5791999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Callaway Plant Unit 1.With ML20207A7401999-03-30030 March 1999 Draft, Evaluation of Risk of Induced Steam Generator Tube Rupture, for Callaway Plant ML20205G4071999-03-25025 March 1999 Security Event Rept:On 990304,failure to Properly Compensate for Loss of Safeguards Equipment That Could Have Resulted in Undetected Intrusion Into Protected or Vital Area,Was Discovered.Caused by Msk 325 Failure.Replaced Msk 325 ML20204B6741999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Callaway Plant,Unit 1.With ML20199E7011998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Callaway Plant.With ULNRC-03990, 1998 Annual Rept for Ameren Corp/Union Electric Co. with1998-12-31031 December 1998 1998 Annual Rept for Ameren Corp/Union Electric Co. with ML20198D9811998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Callaway Plant,Unit 1.With ML20195C8341998-11-10010 November 1998 Rev 20 to Operating QA Manual ML20195C8181998-11-0909 November 1998 Rev 19 marked-up Changes to Operating QA Manual ML20195D6931998-10-31031 October 1998 Non-proprietary Rev 3 to Electrosleeving Qualification for PWR Recirculating SG Tube Repair ML20195D3581998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Callaway Plant,Unit 1.With ML20154L4931998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Callaway Plant Unit 1.With ML20151Y5151998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Callaway Plant,Unit 1.With ML20155B5871998-08-28028 August 1998 Non-proprietary Rev 1 to 51-5001925-01, Risk Assessment for Installation of Electrosleeves at BVPS & Callaway Plant ML20237B8421998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Callaway Plant,Unit 1 ML20155H7381998-06-30030 June 1998 10CFR50.59 Summary Rept for Jan-June 1998. with ML20236Q9991998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Callaway Plant,Unit 1 ML20249C5851998-06-30030 June 1998 Rev 1 to Callaway Cycle 10,COLR ML20248M0501998-06-0808 June 1998 Special Rept 98-02:on 980502,Channel 3 of loose-part Detection Sys Was Declared to Be Inoperable.Caused by Failure of Component Inaccessible at Power.Addl Troubleshooting Will Be Performed ML20249A7681998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Callaway Plant,Unit 1 ML20249B2451998-05-18018 May 1998 Nonproprietary Version of Revised Chapters 4 & 5 to Rev 4 of HI-971769, Licensing Rept for Reracking of Callaway & Wolf Creek Nuclear Plants for Ue & Wcnoc. Chapters 4 & 5 Reflect Editorial Revs ML20248C3681998-05-18018 May 1998 Non-proprietary Version of Rev 4 to HI-971769, Licensing Rept for Reracking of Callaway & Wolf Creek Nuclear Plants ML20247G0811998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Callaway Plant Unit 1 ML20217R2031998-04-27027 April 1998 Cycle 10 Colr ML20216H0651998-04-15015 April 1998 SER Approving Licensee Proposed Alternative to Use Code Case N-508-1 for Rotation of Serviced Snubbers & Prvs for Purpose of Testing in Lieu of ASME B&PV Code,Section Xi,Article IWA-7000 Requirements ML20216K0531998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Callaway Plant,Unit 1 ML20217F3181998-03-24024 March 1998 SER Accepting Relief Request for Approval for Use of Alternate Exam Requirements for Plant Inservice Insp Program ML20216G3551998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Callaway Plant, Unit 1 ML20203M0101998-02-25025 February 1998 Rev 11 to Callaway Cycle 9 Colr ML20203A7951998-02-0909 February 1998 Rev 10 to Callaway Cycle 9 Colr ML20202D4821998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Callaway Plant ML20198S6361998-01-22022 January 1998 Ro:On 980121,determined That Plant Shutdown Would Be Required IAW TS 3.8.1.1,Action D.Caused by 'B' Train EES Charcoal Absorber Being Determined Inoperable.Requested 24 Hour Extension to Allow Restoration of EDG & ESW Train ULNRC-03775, 1997 Annual Rept for Union Electric1997-12-31031 December 1997 1997 Annual Rept for Union Electric ML20198Q0631997-12-31031 December 1997 Rev 9 to Callaway Cycle 9 Colr ML20198J6791997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Callaway Plant,Unit 1 1999-09-30
[Table view] |
Text
_ _ _ _ _ _ _ _
l A T T A C II M E N T 1
////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////
OQAM, CN 94-04 aaa IDENTIFICATION OF CIIANGES
////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////
941004o078 940921 )
PDR ADOCK 05000483 P PDR
cal #44-o4- i ODAN
~
1904 15.4 Material nonconformances shall be processed in 1905 accordance with documented procedures and shall 1907 identify the specifics of the nonconformance
. stating the particular drawing, specification or other requirement; shall record the disposition; and shall register the signature of an approval authority. Procedures shall prescribe the individ-uals or groups assigned the responsibility and authority to approve and verify the implementation of the disposition of material nonconformance.
1907 15.5 Material nonconformance disposition categories 2334 shall include:
- 1. "Use-as-is" or " acceptable" (including condi-tional releases)
- 2. " Reject" or "not acceptable, scrap, Or return to vendor"
- 3. " Rework" in accordance with approved procedures
- 4. " Repair" in accordance with approved procedures Material nonconformances shall be reviewed and accepted, rejected, repaired, reworked, or condi-tionally. released in accordance with documented procedures. An approved disposition of a nonconfor-mance which allows a reduction in the requirements of a safety-related structure, system, or compo-nent, shall be treated as a design change subject to the controls prescribed in Section 3.
1848 15.6 Nuclear Engineering shall be responsible for 1905 approving material nonconformance dispositions of 1907 "use-as-is" and " repair". Licensing and Fuels 733's shall be responsible for approving material noncon-formance dispositions of "use-as-is" and " repair" on nuclear fuel which are generated prior to the arrival of such fuel at the Callaway Plant.
Regarding material nonconformances identified on-site, QC personnel shall be responsible for verification that approved dispositions have been implemented and for the final sign-off.
15.7 Nonconformance documents which record defects '
in basic components er d:Jictirne frc= tc;..nical
-scquir;;;ata 43 precur ::t derr ::t:- shall be reviewed for reporting applicability under 10CFR21 y 4M4 and other Federal reporting requirements. Signifi-cant nonconforming conditionA involving a defect or NT PW aaterial. noncompliance in a 5clifered component or 4.
services which could create a substantial safety gr hazard shall be reported to the Nuclear Regulatory gQ Q Commission pursuant to the requirements of 10CFR21.
Co m ms,aA--
A 4
15-2 Rev. 14 6/91 I
l
GQ/\V1
. . OQAM c g gqq w y 16.2 Conditions adverse to quality which are classified as nonconformances shall be controlled in accor-dance with the additional requirements described in OQAM, Section 15.
16.3 Conditions adverse to quality which impede the implementation or reduce the effectiveness of the Operating QA Program shall be considered signifi-cant conditions adverse to quality. Significant conditions adverse to quality may include, but are not limited to, noncompliance with procedural requirements which impact nuclear or personnel safety; reportable occurrences required by regula-tions; adverse nonconformance trends; deficiencies identified in the OQAP; recurring conditions for which past corrective action has been ineffective; and managerial controls which could result in the failure of a plant system to perform it's intended function. Examples of such conditions include those which match the descriptions in Callaway Plant Technical Specification 6.5.1.6f, g, h, 1, m (potential hazards to nuclear safety) and NPDES violations. i 16.4 Conditions adverse to quality which involve defects in basic components or de/intienc frer technical !
- -rcquire=ent: ir prc urcacnt d o- me m a s shall be Cd l 44 Ob. reviewed for reporting applicability under 10CFR21
,,- and other Federal reporting requirements. Repor-table conditions adverse to quality are classified i as significant. I 16.5 The nature of the condition adverse to quality may be such that remedial actions must be taken imme-diately, whereas development and implementation of corrective action to preclude recurrence may take substantially longer.
1871 16.6 Nuclear Engineering personnel shall review condi- ,
tions adverse to quality which involve design defi- '
ciencies or which involve recommending design changes as corrective action. Licensing and Fuels should review conditions adverse to quality for fuel-related issues. The ORC shall review signifi-cant conditions adverse to quality.
16.7 Corrective action documents shall be closed by verifying the implementation and adequacy of corrective action. The closure of corrective action documents shall be accomplished as promptly as practicable after the corrective action taken has been verified.. Verification may be accomplished through direct observations, written communica-tions, re-audit, surveillances, or other approp-riate means.
16-2 Rev. 16 6/93
A TT A CII M E N T 2
//#//////NM//##//////#///M//////#//MM///////gg//////g///ggg//g//g//gy/jf/g/g//gffgggggg OQAM, CN 94-04
..n EXPLANATIONS OF AND JUSTIFICATIONS FOR PROPOSED CifANGES TO TIIE OQAM
////M##////////#//////////#/M///////////#///#/////////##/#/M/#/////#//////#///M////#//##/////#//////##
7
. . =
... q l
i OQAM !
CN 94-04 l
Description of Change: ,
Revise OQAM Sections 15.7 and 16.4 to enable reponing of10CFR Part 21 via other reporting mechanisms. ,
I Justification: i 3
10CFR Part 21.2(c), dated March 31,1994, allows persons operating under 10CFR Part 50 to evaluate and report potential defects under 10CFR50.72,10CFR50.73, or t 10CFR73.71. This satisfies the responsibility to report defects under section 206 of the Energy Reorganization Act of 1974. As discussed in Part 21, Proposed Rule Making dated April 30,1992, this change was made to eliminate potential duplicative evaluation j and reporting requirements.
In an effort to streamline reporting and clarify Union Electric's reporting process, Union Electric will report significant defects to basic components via part 21 for those components that have been receipt accepted by QC, but have not been installed in the system. For items installed in the system that have significant defects, the condition will !
be reported via plant LER procedures. For items that have not been installed in the system and have not been receipt accepted, reporting is the responsibility of the vendor. ;
UE will notify the vendor of such problems. The evaluation of material defects is performed as a part of plant corrective action programs. Since there is no change in reporting, only the reporting mechanism, for basic components with significant defects, this change does not result in any unreviewed safety question and the OQAM will ;
continue to satisfy the requirements of 10CFR50 Appendix B. -