ML20073C162

From kanterella
Jump to navigation Jump to search
Fifth Interim Rept Re Omissions to Auxiliary Feedwater Pump Drawings.Initially Reported on 820225.Analysis of Turbine Bearing Cooling Water Piping Continuing.Next Rept Will Be Submitted by 831206
ML20073C162
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 04/06/1983
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8304130059
Download: ML20073C162 (1)


Text

,

TENNESSEE VALLEY AUTHORITY CH ATTANOOGA. TENNESSEE 37401 s

400 Chestnut Street Tower II

,hpp e

n vm..

r

' ' 'I c ' '

April 6, 1983

~

bsdgp0 8

BLRD-50-438/82-20

'I BLRD-50-439/82-18

8. g o n

U.S. Nuclear Regulatory Commission Region II Attn:

Mr. James P. O'Reilly, Regional Administrator 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - OMISSIONS TO AUXILIARY FEEDWATER PUMP DRAWINGS - BLRD-50-438/82-20, BLRD-50-439/82 FIFTH INTERIM REPORT The subject deficiency was initially reported to NRC-0IE Inspector R. V. Crlenjak on February 25, 1982 in accordance with 10 CFR 50.55(e) as NCR BLN BLP 8207. This was followed by our interim reports dated March 25, July 20, September 7, and December 14, 1982. This is our fifth interim report. TVA is still conducting its rigorous analysis of the turbine bearing cooling water piping. We expect to submit our next report by December 6, 1983 If you have any questions, please get in touch with R. H. Shell at FTS 858-2688.

Very truly yours, TENNESSEE VALLEY AUTHORITY L.

. Mills, Ma ger Nuclear Licensing oc:

Mr. Richard C. DeYoung, Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 rfyFICIAL f-8304130059 830406 DR ADOCK 05000 38 An Equal Opportunity Employer