MONTHYEARML20217G0361999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20212E7451999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Hcgs,Unit 1.With Summary of Changes,Tests & Experiments Implemented During Aug 1999.With ML20216E4941999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Jmfnp.With ML20210R6031999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With L-99-267, Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20209G0661999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With L-99-023, Monthly Operating Repts for May 1999 for Jfnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Jfnp Units 1 & 2. with L-99-020, Monthly Operating Repts for Apr 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With L-99-161, Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20205N0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20207M6421999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20203A2651999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20199E6591998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20198B2561998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20195C9681998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20154H6001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20197C8991998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20237B1891998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20236M5981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20248M3121998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20247F3631998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20216D5941998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Joseph M Farley Nuclear Plant,Units 1 & 2 ML20216D9811998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20202G4211998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20198L6191997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Jm Farley Nuclear Plant,Units 1 & 2 ML20203F6391997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Jm Farley Nuclear Plant,Units 1 & 2 ML20198T4151997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Jm Farley Nuclear Plant ML20211N7221997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Jm Farley Nuclear Plant Units 1 & 2 ML20216J3151997-08-31031 August 1997 Monthly Operating Repts for August 1997 for Jfnp ML20210K5981997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Jm Farley Nuclear Plant,Units 1 & 2 ML20141H3191997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Joseph M Farley Nuclear Plant Units 1 & 2 ML20148K6081997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Joseph M Farley Nuclear Plant ML20141E3121997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Jm Farley Nuclear Plant Units 1 & 2 ML20137T1841997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Jm Farley Nuclear Plant Units 1 & 2 ML20136G4731997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Jm Farley Plant Units 1 & 2 ML20138K5881997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Jm Farley Nuclear Plant Units 1 & 2 ML20133F4791996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20132C0631996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20134K7141996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20128Q1161996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Jm Farley Nuclear Plant,Units 1 & 2 ML20117M1291996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20116J6421996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20115D6821996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20117M2721996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Jm Farley Nuclear Plant Units 1 & 2 ML20111D1401996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for Jm Farley Plant Units 1 & 2 ML20101R6271996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Jm Farley Nuclear Plant ML20106H0791996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Jm Farley Nuclear Plant ML20097D5651996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Jm Farley Nuclear Plant ML20096C0921995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Jm Farley Nuclear Plant Units 1 & 2 ML20095E9451995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Joseph M Farley Nuclear Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217P0761999-10-0606 October 1999 Non-proprietary, Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs ML20217G0361999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20212E7451999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Hcgs,Unit 1.With Summary of Changes,Tests & Experiments Implemented During Aug 1999.With ML20216E4941999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Jmfnp.With ML20210T2161999-08-0606 August 1999 Draft SE Supporting Proposed Conversion of Current TS to ITS for Plant ML20211B2011999-08-0404 August 1999 Informs Commission About Results of NRC Staff Review of Kaowool Fire Barriers at Farley Nuclear Plant,Units 1 & 2 & Staff Plans to Address Technical Issues with Kaowool & FP-60 Barriers ML20210R6031999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20196J3791999-06-30030 June 1999 Safety Evaluation of TR WCAP-14750, RCS Flow Verification Using Elbow Taps at Westinghouse 3-Loop Pwrs. Rept Acceptable ML20209G0661999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With L-99-267, Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With L-99-023, Monthly Operating Repts for May 1999 for Jfnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Jfnp Units 1 & 2. with ML20206G7471999-05-0404 May 1999 Safety Evaluation Accepting Corrective Actions Taken by SNC to Ensure That Valves Perform Intended Safety Functions & Concluding That SNC Adequately Addressed Requested Actions in GL 95-07 L-99-020, Monthly Operating Repts for Apr 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20206C9461999-04-30030 April 1999 1:Final Cycle 16 Freespan ODSCC Operational Assessment L-99-161, Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20205N0961999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20204D7271999-03-15015 March 1999 ISI Refueling 15,Interval 2,Period 3,Outage 3 for Jm Farley Nuclear Generating Plant,Unit 1 ML20207M6421999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20203A2651999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20199D8611999-01-12012 January 1999 SER Accepting Relief Request for Inservice Insp Program for Plant,Units 1 & 2 ML20199E6591998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20206C8081998-12-31031 December 1998 Alabama Power 1998 Annual Rept ML20198K4091998-12-18018 December 1998 COLR for Jm Farley,Unit 1 Cycle 16 ML20198B2561998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20195E2281998-11-16016 November 1998 Safety Evaluation Authorizing Relief Request for Second 10-year ISI Program Relief Request 56 for Plant,Unit 1 ML20195C9681998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20155E0271998-10-29029 October 1998 SER Approving & Denying in Part Inservice Testing Program Relief Requests for Plant.Relief Requests Q1P16-RR-V-3 & Q2P16-RR-V Denied Since Requests Do Not Meet Size Requirement of GL 89-04 ML20154B6121998-10-0101 October 1998 Safety Evaluation Granting Second 10-year ISI Requests for Relief RR-13 & RR-49 Through RR-55 for Jm Farley NPP Unit 1 ML20151V8341998-09-30030 September 1998 Non-proprietary Rev 2 to NSA-SSO-96-525, Jm Farley Nuclear Plant Safety Analysis IR Neutron Flux Reactor Trip Setpoint Change ML20154H6001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20154H0121998-09-30030 September 1998 Submittal-Only Screening Review of Farley Nuclear Plant IPEEE (Seismic Portion) ML20197C8991998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With ML20237C5471998-08-20020 August 1998 Suppl to SE Re Amends 137 & 129 to Licenses NPF-2 & NPF-8, Respectively.Se Being Supplemented to Incorporate Clarifications/Changes & Revise Commitment for Insp of SG U-bends in Rows 1 & 2 for Unit 2 Only ML20236Y1121998-07-31031 July 1998 Voltage-Based Repair Criteria 90-Day Rept ML20237B1891998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20237A2181998-07-24024 July 1998 Jm Farley Unit 2 ISI Rept Interval 2,Period 3 Outage 1, Refueling Outage 12 ML20236U6141998-07-23023 July 1998 Safety Evaluation Authorizing Use of Alternative Alloy 690 Welds (Inco 52 & 152) as Substitute for Other Weld Metal ML20236R8671998-07-0909 July 1998 Safety Evaluation Concluding That Southern Nuclear Operating Co USI A-46 Implementation Program Has Met Purpose & Intent of Criteria in GIP-2 & Staff SSER-2 on GIP-2 for Resolution of USI A-46 ML20236M5981998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20154H0461998-06-30030 June 1998 Technical Evaluation Rept on Review of Farley Nuclear Plant IPEEE Submittal on High Winds,Flood & Other External Events (Hfo) ML20248M3121998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20247F3631998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Jm Farley Nuclear Plant,Units 1 & 2 ML20217D2591998-04-21021 April 1998 Safety Evaluation Accepting Licensee Proposed Alternative Re Augmented Exam of Reactor Vessel Shell Welds for Plant ML20247E8851998-03-31031 March 1998 FNP Unit 2 Cycle 13 Colr ML20217H3191998-03-31031 March 1998 Safety Evaluation Accepting Proposed Changes to Plant Matl Surveillance Programs ML20216D5941998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Joseph M Farley Nuclear Plant,Units 1 & 2 ML20217D4081998-03-24024 March 1998 Safety Evaluation Accepting Proposed Changes to Maintain Calibration Info Required by ANSI N45.2.4-1972 ML20216H6731998-03-17017 March 1998 SER Accepting Quality Assurance Program Description Change for Joseph M Farley Nuclear Plant,Units 1 & 2 ML20216J6851998-03-16016 March 1998 Revised Pages 58 & 59 to Fnp,Units 1 & 2,Power Uprate Project BOP Licensing Rept ML20216D9811998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Jm Farley Nuclear Plant,Units 1 & 2 1999-09-30
[Table view] |
Text
_ . _ ._ _ , _ . - _ _
OPERATING DATA REPORT DOCKET NO. 50-348-DATE September 7,1994
, COMPLETED BY R. D. Ilill TELEPHONE' (205) 899-5156 e
OPERKf1MG3TAIUS
- 1. Unit Name: Joseph M. Farley - Unit 1 Notes
' 2. Reporting Period: _
August 1994 1) Cumulative data since 12-01-77, date
. 3. . Licensed Thermal Power (MWt): 2,652 ' of commercial operation.
4; ' Nameplate Rating (Gross MWe): 860 .
- 5. Design Electrical Rating (Net MWe): 829 ;
' 6.~ Maximum Dependable Capacity (Gross MWe): 855.7
- 7. Maximum Dependable Capacity (Net MWe): 812 ,
- 3. If Changes Occur in Capacity Ratings (items Number 3 Threugh 7) Since Last Report, Give Reason . N/A
- 9. Power Level To Which Restricted, if Any (Net MWe N/A
- 10. Reasons For Restrictions, If Any: N/A .
t This Month Yr.to Date' Cumulative i i1. 11oursin Reporting Period 744.0 5,831.0 146,831.0
' 12. Number OfIlours Reactor Was Critical 744.0 4,663.9 116,327.8 '
- 13. Reactor Reserve Shutdown llours 0.0 - 0.0 ~ 3,650.0
- 14. llours Generator On-line 744.0 4,618.3 114,524.9 ,
- 15. Unit Reserve Shutdown flours 0.0 - 0.0 0.0
- 16. Gross Thermal Energy Generated (MWil) 1,972,995.2 11,884,803.4 294,377,208.6 j
- 17. Gross Electrical Energy Generated (MWil) 640,329.0 3,856,415.0 94,871,461.0 l
- 18. Net Electrical Energy Generated (MWil) 608,163.0 3,643,123.0 89,583,277.0
'19. - Unit Service Factor 100.0 79.2 78.4
- 20. Unit Availabilty Factor 100.0 79.2 78.4
- 21. Unit Capacity Factor (Using MDC Net) 100.7 76.9 74.9
- 22. Unit Capacity Factor (Using DER Net') 98.6 75.4 74.0
' 23. Unit Forced Outage Rate 0.0 0.0 6.1
. 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A
- 25. If Shut Down at End Of Report Period, Estimated Date of Startup: N/A'
,26; Units in Test Status.(Prior To Commercial Operation): Forecast Achieved - ;
Initial Criticality 08/06H2 03LQ9H2 Initial Electricity 08/20H2 08/1Ba2 Commercial Operation 12/0lH2 12/.01H2 9409200312 940913 PDR ADOCK 05000348 R_ . PDR
- if; - , . . . .- _ . .
'. DOCKET NO. 50-348 UNIT I DATE September 7,1994 C051PLETED BY R. D. Hill TELEPilONE (205) 899-5156 MONTli August DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 819 17 816 _
2 818 18 816 3 817 19 _
817 4 816 20 819 5 815 21 818 6 817 22 818 7 814 23 821 4 820 24 818 ,
9 821 25 822 10 820 26 821 11 819 27 817 12 816 28 819 13 816 29 816 14 816 30 816 15 814 31 818 16 815 __
INSTRUCIlONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt.
=
UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-348 UNIT NAME J. M. Farley - Unit 1 DATE September 7,1994 COMPLETED BY R. D. Ilill REPORT MONTH August TELEPilONE (205) 899-5156
'-- ~
METiiOD OF LICENSEE CAUSE ANDCORRECT1VE DURATION SilUTTING EVENT SYSTEM COMPONENT ACTION TO NO. DATE TYPE (I) !!OURS REASON (2) DOWN REACTOR (3) REPORT # CODE (4) CODE (5) PREVENT RECURRENCE l facre were no shutdowns or power reductions during the month.
1: 2: 3: 4: 5:
F: Forced Reason Method Exhibit G-Instructions for Exhibit I - Same Sourte S: Scheduled A - Equipment Failure (Explain) 1 - Manual Preparations of Date Entry B - Maintenance or Test 2 - Manual Scram Sheets for Licensee Event C - Refueling 3 - Automatk Scram Report (LER) File (NUREG-0161)
D - Regulatory Restrictwn 4 - Other (Explain)
E - Operator Training & License Examination F- Administrative G - Operational Error (Explain)
II- Other (Explain)
.~ ~_--. _ _ - _ _ . . _ _ _ _ _ _ _ _ . - - _ - _ - _ _ _ . _ - _ _ _ - - -
k
. Joseph M. Farley Nucicar Plant Unit 2 Narrative Summary of Operations
. August 1994 At 1459 on 940805, with the Unit in Mode 1 and operating at approximately 100 percent reactor power, the main turbine was manually tripped due to degrading condenser vacuum.
The manual trip of the main turbine from 100 percent power initiated a reactor trip as designed.
The Unit was retumed to 100 percent reactor power at approximately 2210 on 940806.
The following safety related maintenance was conducted during the month:
- 1. Performed preventive maintenance and repairs on the 1-2A diesel generator.
Included in the repairs were an intercooler heat exchanger leak and the overspeed trip device.
- 2. Repaired the automatic function on main steam atmospheric relief valve 3371B.
. OPERATING DATA REPORT ,
DOCKET NO. 50-364 4 DATE September 7,1994 -
. COMPLETED BY < R. D. Hill TELEPHONE (205) 899-5156 OPERAIINGSTAIUS t
.l. Unit Name: Joseph M. Farley - Unit 2 Notes
' . 2. Reporting Period: August 1994 1) Cumulative data since 07-30-81, date
. 3. Licensed Thermal Power (MWt): 2,652 of commercial operation.
- 4. Nameplate Rating (Gross MWe): 860
- 5. Design Electrical Rating (Net MWe): 829
- 6. Maximum Dependable Capacity (Gross MWe): 863.6
' 7.~ ' Maximum Dependable Capacity (Net MWe): 822
- 3. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason N/A
- 9. Power Level To Which Restricted, if Any (Net MWe N/A 10.- Reasons For Restrictions,if Any: N/A This Sionth Yr.to Date Cumulative 11.- Ilours in Reportm,.; Period 744.0 5,831.0 l14,744.0 ;
' 12. ' Number ofIlours Re .ctor Was Critical - 730.0 5,817.0 98,770.7 l
- 13. Reactor Reserve Shutdown Ilours 0.0 0.0 138.0 t
- 14. 1 lours Generator On-line 712.8 5,799.8 97,361.6 0.0 I
'15. Unit Reserve Shutdown llours 0.0 0.0
.16. Gross Thermal Energy Generated (MWH) 1,881.896.3 15,304,245.7 248,839,598.5 .i
' 17. Gross Electrical Energy Generated (MWil) 612,838.0 5,034,111.0 81,583,572.0 ,
. I 8. Net Electrical Energy Generated (MWil) 582,614.0- 4,795,119.0 77,370,208.0 19.- Unit Service Factor 95.8 99.5 84.9 >
.20. : Unit Availabilty Factor 95.8 99.5 84.9
- 21. Unit Capacity Factor (Using MDC Net) 95.3 100.0 82.2
- 22. Unit Capacity Factor (Using DER Net) 94.5 99.2 81.3
- 23. Unit Forced Outage Rate 4.2 0.5 4.0
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling /Maintena ce outage, March 10,1995. Approximately 44 days.
5
- 25. If Shut Down at End Of Report Period, Estimated Date of Startup: N/A
- 26. Units in Test Status (Prior To Commercial Operation): Forecast . Achieved !
Initial Criticality ' 05106Lu 05/08/81 Initial Elcetricity 01/24L81 05125281
' Commercial Operation 03101/H 07/30/81 I
. - _ , . _ . , ~ .
, l ix)CKET NO. 50-364 us:T 2 DATE September 7,1994
. COMPLETED BY R. D. Hill TELEPHONE (205) 899-5156 MONTH August DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 ,
827 17 824 2 _
827 18 824 3 825 19 825 4 824 20 824 5 500 21 824 6 0 22 828 7.- 677 23 831 8 824 24 828 9 829 25 831 10 828 26 831 11 828 27 831 12 825 28 825 13 824 29 824 14 824 30 824 15 822 31 826 16 823 .
1 INSTRUCIlONS l On this format, list the average daily unit power level in MWe-Net for each day in the reporting period. Compute to the nearest whole megawatt. j l
UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-364 ,
UNIT NAME 1 hl Farley - Unit 2 DATE September 7,1994 COMPLETED BY R. D. Ilill REPORT MONT11 Atigtist TELEPilONE (205) 899-5156 METilOD OF LICENSEE CAUSE AND CORRECTIVE DURATION SittJITING EVENT SYSTEM COMPONENT ACTION TO NO. DA TE gTYPE (1) IlOURS R EASON (2) tDOWN REACTOR (3) REPORT # CODE (4) CODE (5) PREVENT RECURRENCE F
[002 940805 F 31.2 G 2 94-001-00 TC PI At 1459 on 940805, with the Unit in Mode I and operating at approximately 100 percent power, the main turbine was manually tripped due to degrading condenser vacuum. The manual trip of the main turbine from 100 percent power initiated a reactor trip as designed.
Condenser vacuum degraded when personnel adjusted the gland seal steam pressure regulator. The Unit was returned to 100 percent power at approximately 2210 on 940806.
I: 2: 3: 4. 5:
F: Forced Reason Method Exhibit G- Instructums for Exhibit I - Same Source S: Scheduled A - Equipment failure (Explam) 1 - Manual Preparations of Date Entry B - Maintenance or Test 2 - Manual Scram Sheets for Licensee Event C - Refuelmg 3 - Automatic Scram Report (LER) File (NUREG-0161)
D - Regulatory Restriction 4 - Other (Explain)
E - Operator Trainmg & License Examination F - Admmistrative G - Operational Error (Explain)
II - Other (Explain)