ML20072S687

From kanterella
Jump to navigation Jump to search
Amend 67 to License DPR-16,changing Tech Specs to Require Audit of Emergency Preparedness Programs & Safeguards Contingency Plans at Least Once Per Yr
ML20072S687
Person / Time
Site: Oyster Creek
Issue date: 03/31/1983
From: Crutchfield D
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20072S690 List:
References
NUDOCS 8304070292
Download: ML20072S687 (4)


Text

.

'c, UNITED STATES

! $.,g j NUCLEAR REGULATORY COMMISSION

,y,,g[f

.p WASHINGTON, D. C. 20555 o, !+RK c

%ms

+....

GPU NUCLEAR CORPORATION AND JERSEY CENTRAL POWER & LIGHT COMPANY DOCKET N0. 50-219 OYSTER CREEK NUCLEAR GENERATING STATION AMENDMENT TO AMENDED PROVISIONAL OPERATING LICENSE Amendment No. 67 License No. DPR-16 1.

The Nuclear Regulatory Commission (the Ccmmission) has found that:

A.

The application for amendment by GPU Nuclear Corporation and Jersey Central Power and Light Company (the licensees) dated March 18, 1983 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the appli. cation, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activ.ities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

9 0504070292 830331 DR ADOCK 05000219 p

PDR

7-n 2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and Paragraph 2.C(2) of Provisional Operating License No. DPR-16 is hereby amended to read as follows:

(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 67, are hereby incorporated in.the license. GPU Nuclear Corporation shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuanc?.

FOR THE NUCLEAR REGULATORY COMMISSION

~

ennis M.

utch iel Chief Operating Reactors ranch #5 Division of Licensing

Attachment:

Changes to the Technical Specifications Date of Issuance: March 31, 1983 e

9 e

e 6

A n

0

ATTACHMEf!T TO LICEf:SE AMEf:DMEl!T NO. 67 PROVISIONAL OPERATING LICENSE-NO. OPR-16 DOCKET NO. 50-219 Replace the following page 6-11 of the Appendix "A" Technical Specifications with the enclosed page 6-11. This revised page contains the captioned amendment number and vertical lines indicating the area of change.

h e

e I

9 e

b e

O 6

e G

m a.

ihe egnformance of f ac!!!ty operction to all provisions contained wirnin Tne Technical Specifications and applicacia license conditions a7 least once per year.

b.

The performance training and qualifications of the entire facility staff at least once per year.

.i c.

The results of all actions Taken to coi rect deficiences occurring In facit ly equipment, structures, systems or method of operation that affect nuclear safety at least once per six months.

d.

The Facility Emergency Plan and Implementing procedures every 12 l

~ conths.

e.

The Facility Security Plan and implementing procedures every 12

. months.

~

f.

Any other area of facility operation considered appropriate by the GORS cr the Vice President & Director.

'6.5.3.6 RECORDS docum'ntation of all independent safety reviews and Written e

investigations will be forwarded to the Vice President & Director and the Chairman of the General Office Review Board.' In addition, any reportable occurrence or item involving an unreviewed saf ety questien. which is identified by the ISRG will be documented and reported innedlately to the above mentioned persons.-

(

ec-The audit f]ndings which result from all auditsconduchedin accordance with Section 6.5.3.5 shall be documented and reported to the above mentioned persons within 30 days after completing the audit. Reports documenting corrective action will receive the same d i str i b uti.on and they w i ll also be forwarded to the ISRG Cocrdinator.

6.5.4 GENERAL CFFICE REVIEW BOARD (GORS) 6.5.4.1. FUNCTION The technical and administrative function of the GORB is' to provide Independent review of major safety Issues, to fo' resee potentially significant nuclear and radiation safety problems, and to advise the Office of the President on these matters.

6.5.4.2 CDMPOSITION l

Members of the General Office Review Board shall possess extensive I

experience In their Individual specialities and collectively have the c::mpetence in the following areas:

I a.

Nuclear Power Plant Operations b.

Nuclear Engineering c.

Chemistry and Radiochsmistry 6-11 Amendment flo. %%)Kf, N,65J67 L

1. -