Final Deficiency Rept Re Incorrectly Wired Main Control Room Switch Module Supplied by Consolidated Controls Corp. Initially Reported on 830218.Switch Module Rewired & Vendor Qa/Qc Program Will Be Corrected.Also Reportable Per Part 21
ML20072Q731
Person / Time
Site: Bellefonte 
Issue date: 03/21/1983
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
REF-PT21-83 10CFR-050.55E, 10CFR-50.55E, NCR-2243, NUDOCS 8304050299
Download: ML20072Q731 (2)


Text

-

e,,.

.; :% y c

-TENNESSEE (VALLEY AUTHORITY

/

4 CHATTANOOGA' TENNESSEE 374ot h<j flg.

400 Chestnut Street Tower II co j

.g Eyo -

]

' March 21,11983

-7, no.

BLRD-50-439/83-18 ie,.

U.S. Nuclear Regulatory Comunission

.E Q

p g,j -

- Region II Attn: : Mr. James P. O'Reilly, Regional Administrator

-.~

y 101_Marietta Street, NW, Suite 2900 ML

. Atlanta, Georgia 30303

Dear Mr.'0'Reilly:

O

'BELLEFONTE NUCLEAR PLANT UNIT 2 - CONSOLIDATED CONTROLS MAIN CONTROL ROOM t:

SWITCH MODULE' INCORRECTLY WIRED - BLRD 39/83 FINAL REPORT-4 A

The subject' deficiency lwas initially reported to NRC-0IE~ Inspector Linda Watson on: February 18, 1983 in accordance with 10 CFR 50.55(e) as 7

~ NCR 2243 Enclosed is our. final report. We consider 10 CFR Part 21 applicable' to this deficiency.

s If you have any questions concerning this matter, ' please get in -touch with R. H. Shell at FTS 858-2688.

Very'truly yours, TENNESSEE VALLEY AUTHORITY.

[

Q $ h =m

?

Art. L. M. Mills, Manager

/ ' Nuclear Licensing.

Enclosure cc: Mr. Richard C.-DeYoung, Director (Enclosure)

J Office of Inspection and Enforcement U.S; Nuclear Regulatory Comunission

+-

~

Washington,.D.C. '20555

~

q

._.J s.

lT C t-a

(.

+

4 4

L -

@g 8304050299 930321

'9A 2

s PDR ADOCK 05000439-g PDR C -- " e' An Equal. Opportunity Employer -

/

[^;^,,. p,-

.y

~ q~ - 'i -

'-"?""

>r Nu y,

,b

~

=

m.

ENCLOSURE BELLEFONTE NUCLEAR PLANT UNIT 2 CONSOLIDATED CONTROLS MAIN CONTROL ROOM SWITCH

-MODULE INCORRECTLY WIRED NCR 2343 BLRD-50-439/83-18 i

10 CFR 50.55(e)

FINAL REPORT Description of Deficiency Main Control Room Switch Module SN3-15B, S/N 2536, in panel 2IM0204, slot 2CM-IHIS-001A, had two station wires connected incorrectly (station A, point 5 connected to station B, point 14, instead of to station B, point 5, and station A, point 6, connected to station B, point 5, instead of to station B, point 14).

These switches were supplied to TVA by the Consolidated Controls Corporation (CCC), Bethel, Connecticut.

TVA considers this deficiency to be a random wiring ers or on the part of the vendor. TVA' believes that the deficient Consolidated Controls QA program was the cause for TVA receiving this defective switch. NCR 1950 was reported earlier by TVA to cover the Consolidated Controls QA program deficiency.

Safety Implications The subject ' switch could have been randomly installed in the Main-i Control Room to control a safety-related system / component.. Failure of the switch to provide-proper control could adversely affect the safe operation of the plant.

Corrective Action i

The Division of Construction has completed rewiring the switch module to fully conform to all TVA and' vendor standards and drawings. This rewiring consisted of swapping the station B connection points of two

. wires,.which.were in close proximity.

The switch module was manufactured and shipped to TVA prior to--the identification of generic QA/QC concerns by TVA in CDRs 438/82-68 and 439/82-61, the NRC audit'of the vendor in July 1982, and the TVA~

audit of the vendor in October 1982., The. vendor's responses to the two audits noted above.have been approved by both the NRC and TVA.

Completion of actions to prevent recurrence concerning the consolidated controls QA program is contingent upon TVA's approval of.