ML20072Q695
| ML20072Q695 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 09/06/1994 |
| From: | Berkow H Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20072Q697 | List: |
| References | |
| NUDOCS 9409120170 | |
| Download: ML20072Q695 (6) | |
Text
-..
eau p
a i
UNITED STATES l
5 NUCLEAR REGULATORY COMMISSION f*
WASHINGTON, D.C. 2055M001 DUKE POWER COMPANY DOCKET NO. 50-369 McGUIRE NUCLEAR STATION. UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.147 License No. NPF-9 1.
The Nuclear Regulatory Commission (the Commission) has found that:
The application for amendment to the McGuire Nuclear Station, A.
Unit 1 (the facility), Facility Operating License No. NPF-9 filed by the Duke Power Company (licensee) dated July 13, 1994, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations as set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
9409120170 94o906 PDR ADOCK 05000369 P
(
2.
Accordingly, the license is hereby~ amended by page changes to the l
Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 2.C.(2) of Facility Operating License No. NPF-9 is hereby amended to read as follows:
Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No.147
, are hereby incorporated into this l
license. The licensee shall operate the facility in accordance l
with the Technical Specifications and the Environmental Protection i
Plan.
3.
This license amendment is effective as of its date of issuance and shall be implemented within 30 days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION In-l f Mert N. Ber ow, Director roject Directorate II-3 l
Division of Reactor Projects - I/II i
Office of Nuclear Reactor Regulation
Attachment:
Technical Specification l
Changes Date of Issuance: September 6, 1994 l
I
p* "ch p
s
~
-t 8
S UNITED STATES i
NUCLEAR REGULATORY COMMISSION j
%,.....,/
WASHINGTON, D.C. 20555-0001 DUKE POWER COMPANY DOCKET N0. 50-370 McGUIRE NUCLEAR STATION. UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.129 License No. NPF-17 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment to the McGuire Nuclear Station, Unit 2 (the facility), Facility Operating License No. NPF-17 filed by the Duke Power Company (licensee) dated July 13, 1994, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations as set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized i
by this amendment can be conducted without endangering the heal +h and safety of the public, and (ii) that such activities will be conducted in compliance with the-Commission's regulations _ set i
forth in 10 CFR Chapter I; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
I l
l l
l
. j 2.
Accordingly, the license is hereby amended by page changes to the i
Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 2.C.(2) of Facility Operating License No.
NPF-17 is hereby amended to read as follows:
Technical Specifications l
The Technical Specifications contained in Appendix A, as revised through Amendment No. 129, are hereby incorporated into this license. The licensee shall operate the facility in accordance i
l with the Technical Specifications and the Environmental Protection l
Pl an.
3.
This license amendment is effective as of its date of issuance and shall be implemented within 30 days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION i
l l
He bert N. Berkow, Director l
Project Directorate 11-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation 3
Attachment:
Technical Specification Changes Date of Issuance: September 6, 1994 l
I l
i
ATTACHMENT TO LICENSE AMENDMENT NO.147 l
FACILITY OPERATING LICENSE NO. NPF-9 DOCKET NO. 50-369 AND TO LICENSE AMENDMENT NO. 129 FACILITY OPERATING LICENSE NO. NPF-17 DOCKET NO. 50-370 Replace the following page of the Appendix "A" Technical Specifications with the enclosed page. The revised page is identified by Amendment number and contains vertical lines indicating the areas of change.
Remove Pace J_nsert Pace 3/4 6-21 3/4 6-21 l
l l
i
CONTAINMENT SYSTEMS i
I SURVEILLANCE REQUIREMENTS (Continued) i 3)
Verifying that the Containment Pressure Control System functions within the setpoint limits specified in Table 3.3-4, Item 6.
d.
At least once per 10 years by performing an air or smoke flow test l
through each spray header and verifying each spray nozzle is unobstructed.
l J
l l
t t
l McGUIRE - UNITS 1 AND 2 3/4 6-21 Amendment No. 147 (Unit 1) l Amendment No. 129 (J7it 2) l
. -. _