Interim Deficiency Rept 83-02 Re Westinghouse Motor Operated Gate Valves.Initially Reported on 830222.Wiring Will Be Added to Alternate Rotor of Geared Limit Switch within Valve Operator So Close Signal Obtained Independently
ML20072P394
Person / Time
Site: Byron, Braidwood, 05000000
Issue date: 03/28/1983
From: Tramm T
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, 6276N, 83-02, 83-2, NUDOCS 8304040239
Download: ML20072P394 (2)


Text

.

Commonwealth Edison i

/ One Firo N;tional Plat Chic]O. Illmois i

7 Addr:ss R; ply to: Post Ot.ics Box 767

/ Chicago. Illinois 60690

-s March 28, 1983 Mr. James G. Keppler, Regional AcministratGr

... f f

Directorate of Inspecticn and

- x U.S. Nuclear Regulatory Commission 21-

,, ' y--

Enforcement - Region.Ill

~y

~ '

799 Roosevelt Road Glen Ellyn, IL 60137

' u,

'o

Subject:

Byron Generating Station-Units 1 and 2 Braidwood: Generating Station Units 1 gridz2 Westinghouse Gata Valve Mater 0perators. 7

~

z NRC Occket Nos. 50-454, 50-435, SG.-45f, and 50--457

'f

.,~

'~

Dear Mr. KeppInt:

On February 22, 1903, Commonwealth;Edisati notified Mr.

J.'M.

Hinds of your of fice of a cotential significant deficiency'perated gute

~

reportable pursuant to lj_CFR 50.5jiled regarding Westinghouse moto_r c valves at Byron and Braidwood su tions.

This is the-30-day ~ report:On that deficiency.

For your tracking purposes it has_bben' numbered 63-02 for Byron and 83-02 for Braidwood.

Our delay in submittal of, this 30-day report. until March 28, o

1983, was discussed with'Pr. R.,C. knop on' Parch 2 5.- 1l963.

Description of the Deficiency Westingnouse has inf ormed us o'f the( pdtentie,1;f6r,'certain' Westinghouse manuf actured gate valves to indicate they are " Closed'.' prior to the valva disc fully isolating floi..

Should tiie valve' stall or bind t

following the premature indication, the' operator'would have an inac@ rd a indication of true valve position.

l A geared limit switch rotor as pet _to provide an electrical bypass of the OPEN torque switch at the beginniog of the 6pening stroke.

On a closing stroke, this switch changes st. ate befor'e, the. flow path ;is completely blocked.

As a result, it is likely-that monitor and/or.

indicator lights also operated by that rotor will in'dicMe val've closure'

~

slightly before the flow path is completely shut off.

If the valve were to stop between this setpoint and the full shut of f position, a flow path. -

through the valve could exist even though a CLOSE indication had been achieved.

m 8304040239 830320 PDR ADOCK 05000454 S

PDR ft

J. G. Keppler March 28, 1983 The following valves are affected by this deficiency and must be modified to provide positive indication of full closure:

6 SI8802A,B SI8807A,8 SI8835 SI8923A,B e

7

/,.i N SI8809A,8 SI8924 SI8840 CV112D,E

~

CV8105 SI8806 CV8106 RH8716A,8 RY8000A,B SI8808A,B,C,0 4

e~

SI8821A,B RH8701A,8

' 'r %

SI8801A,B RH8702A,B

' k.

SI8803A,B

" Analysis Of Safety Implications

'Il-N> Incorrect valve indication by itself or in combination with f

V [",I' 9nother single failure could cause unacceptable operation of a safety

'related system.

For example, an undetected failure of a SI valve to i

fully close could allow a flow distribution in the ECCS that has not been s,

analyzed in the FSAR.

y

.y e c

~ Corrective Action _

,r For'411 the affected valves, wiring will be added to an alternate rotor t f the geared limit switch within the valve operator so that! the close s'..gnal can be obtained independent of the OPEN torque s

switgh bypepp setpoint.

's

{

py j%

These' changes will be completed prior to fuel load on each unit.

6

's yah/

,Please' direct any questions you may have regarding this matter to thi.s, office.

~

2 Very truly yours

/

,, 5 f-

~'

.a w __

T. R. Tramm f

uclear Licensing Administrator 1m 6276N

- -