ML20072N596

From kanterella
Jump to navigation Jump to search
Second Interim Deficiency Rept Re Improper Use of Alternate Analysis Elbolets.Initially Reported on 821118.Analysis Continuing.Next Rept Will Be Submitted by 831216
ML20072N596
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 03/22/1983
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8304010569
Download: ML20072N596 (2)


Text

~ -

TENNESSEE VALLEY AUTHORITY

,j

  • I, CHATTANOOGA TENNESSEE 374o1 400 Chestnut Street Tower II g

sn March 22, 1983 59 p

7 oo BLRD-50-438/82-78 m

BLRD-50-439/82-72 U.S. Nuclear Regulatory Comission Region II Attn: Mr. James P. O'Reilly, Regional Administrator 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - IMPROPER USE OF ALTERNATE ANALYSIS ELBOLETS - BLRD-50-438/82-78, BLRD-50-439/82 SECOND INTERIM REPORT The subject deficiency was initially reported to NRC-0IE Inspector P. E. Fredrickson on November 18, 1982 in accordance with 10 CFR 50.55(e) as NCR BLN BLP 8231. This was followed by our first interim report dated December 17, 1982. Enclosed is our second interim report. We expect to submit our next report by December 16, 1983 If you have any questions concerning this matter, please get in touch with R. H. Shell at FTS 858-2688.

Very truly yours, TENNESSEE VALLEY AUTHORITY C1bt.

L. M. Mills, nager Nuclear Licensing Enclosure oc:

Mr. Richard C. DeYoung, Director (Enclosure)

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555 3304010569 830322 PDR ADDCK 05000438 S

PDR

[OFFICp COPY An Equal Opportunity Employe.

-A7

w.

s.

ENCLOSURE BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 IMPROPER USE OF ALTERNATE ANALYSIS FOR ELBOLETS NCR BLN BLP 8231 BLRD-50-438/82-78, BLRD-50-439/82-72 10 CFR 50.55(e)

SECOND INTERIM REPORT Description of Deficiency During design review, it was discovered that Bellefonte alternate analysis calculation BLN-KC-D053-11, which concerns the Component Cooling System, contains an elbolet. The Ballefonte Nuclear Plant Alternate Criteria for Piping Ar.alysis and Support (CEB 76-11), which is the basis for this calculation, excludes any component from its scope which is not specifically listed in appendix E (Stress Intensification Factors).

Elbolets are not listed.

Interim Progress The determination has been made that elbolet installations must be rigorously analyzed. All cases where piping containing an-~elbolet were qualified by the Bellefonte Nuclear Plant Alternate Criteria for Piping Analysis and Support are being identified. Once identified, ellolets involved will be either eliminated or included in rigorous analysis.

4 L.

s l

1

~.

-