Docket No. 50-423 B14943 Millstone Nuclear Power Station, Unit No. 3 Proposed Revision to Technical Specifications Ultimate Heat Sink Marked-up Page August 1994 9409020276 940819 PDR ADOCK 05000423 P
PLANT SYSTEMS gg,.,,,
3,,,7
]
n ua evow 3/4.7.5 ULTIMATE HEAT SINK
.~
LIMI.ING CONDITION FOR OPERATION l
3.7.5 The ultimate heat sink shall be OPERABLE with an average water tempera-ture of less than or equal to 75*F at the Unit 3 intake structure.
APPLICABILITY:
MODES 1, 2, 3, and 4.
ACTION:
With the requirement o the abov specification not satisfied, be in at least HOT STANDBY within 6 COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
SURVEILLANCE REQUIREMENTS i
4.7.5 The ultimate heat sink shall be determined OPERABLL:
At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by verifying the average water temperature a.
at the Unit 3 intake structure to be within limits.
At least once per 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> by verifying the average water temperature b.
at the Unit 3 intake structure to be within limits when the average water temperature exceeds 70*F.
4 g citua w
- L o pen =4 b- %r aq q, 40 m q iq, H 01 ST*@H cond.hb J.Il be 24 %vs h.k W.s p elod,
3
+o nach a
'rf 4h 4cmpencbre m creme <- abwe U "F, be in N OT % O 6y w M n Hlu v'ief + (o hou<s,
j MILLSTONE - UNIT 3 3/4 7-13 b WULM*^4 Mo.
Docket No. 50-423 B14943 Millstone Nuclear Power Station, Unit No. 3 Proposed Revision to Technical Specifications Ultimate Heat Sink Retyped Page August 1994 1
l l
PLANT SYSTEMS 3/4.7.5 ULTIMATE HEAT SINK LIMITING CONDITION FOR OPERATION 3.7.5 The ultimate heat sink shall be OPERABLE with an average water tempera-ture of less than or equal to 75'F at the Unit 3 intake structure.
l APPLICABILITY:
MODES 1, 2, 3, and 4.
ACTION:
With the requirement of the above specification not satisfied, be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />
- and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
i SURVEILLANCE REQUIREMENTS i
4.7.5 The ultimate heat sink shall be determined OPERABLE:
a.
At least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> by verifying the average water temperature
~;
at the Unit 3 intake structure to be within limits.
f b.
At least once per 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> by verifying the average water temperature at the Unit 3 intake structure to be within limits when the average water temperature exceeds 70'F.
I i
- For a period from August 1994 to October 1,1994, the allowed time to reach a H0T STANDBY condition wfTT,be 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. During this period, if the temperature increases above 77'F, be in HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
MILLSTONE - UNIT 3 3/4 7-13 Amendment No.
-0278 I