l OPERATING DATA REPORT
~
O DOCKET NO.
50-302 DATE 7/1/83 COMPLETED BY D. Bonart TELEPHONE (904) 795-6486 OPERATING STATUS
- 1. Unit Name:
Crystal River Unit #3 Notes
. 2. Reporting Period:
6/1/83 - 6/30/83
- 3. Licensed Thermal Power (MWt):
2544
- 4. Nameplate Rating (Gross MWe):
890
- 5. Design Electrical Rating (Net MWe):
825 850
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
811
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A
- 9. Power Level To which Restricted,If Any (Net MWe):
N/A
- 10. Reasons For Restrictions,If Any:
N/A This Month Yr.-to-Date Cumulative i
- 11. Hours In Reporting Period 720 4343 55223
- 12. Number Of Hours Reactor Was Critical 0
1859.3 34066.5
- 13. Reactor Reserve Shutdown Hours 0
0 1280.3
- 14. Hours Generator On-Line 0
1859.3 33326.2~
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 0 4488404 75013359
- 17. Gross Electrical Energy Generated (MWH) 0 1573896 25540513
- 18. Net Electrical Energy Generated (MWH) 0 1502253 24247133 i
- 19. Unit Service Factor 0%
42.8%
60.3%
- 20. Unit Availability Factor 0%
42.8%
60.3%
- 21. Unit Capacity Factor (Using MDC Net) 0%
42.7%
55.7%
- 22. Unit Capacity Factor (Using DER Net) 0%
41.9%
53.2%
- 23. Unit Forced Outage Rate 0%
0%
24.96%
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date and Duration of Each):
Refuel Outage which began 3/19/83,' scheduled to last 16 weeks.
t-
- 25. If Shut Down At End Of Report Period. Estimated Date cf Startup:
7/16/83 i
l
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Actiieved INITIAL CRITICALITY 1/1 & /7-7,
INITIAL ELECTRICITY l/30/77-COMMERCIAL OPERATION 3/13/77 i.
8307150088 830711 h, p (9/77).,
PDR ADOCK 05000302 R
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-302 UNIT FLCRP-3 DATE 7/1/83 COMPLETED BY D. Bogart TELEPHONE (904) 795-6486 MONTH June 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 0 1
17 0
2 0
gg 0
0 3
19 0
4 0
20 0
5 0
0 21 0
6 22 0
7 0
23 0
8 0
0 24 9
25 0
10 0
26 0
O 0
1I 27 12 28 0
13 0
0 29 0
14 30 15 0
3g 16 0
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77)
~
o o
o DOCKET NO.
50-102 UNIT SHUTDOWNS AND POWER REDUC %NS UNIT NAME FTPRP-1 DATE 7/5/83 COMPLETED BY D-Rngner REPORT MONTH 6/83 TELEPHONE (904) 795-6486 w.
E c
.$ ?
3
- Y]
Licensee gg go.
Cause A Corrective No.
D. ate g
3g s
jg5 Event g
g3 Action to H
$E E
35g Report #
mO O
Prevent Recurrence o
c l
C 83-07 830601 S
720 C
4 N/A RC FUELXX Refueling outage. During manual shutdown of the reactor for the refueling outage, the plant exper-ienced a feedwater pump trip which 1
initiated an automatic scram.
f b
i i
l i
2 3
4 F: Forced Reason:
Method:
Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination F-Administrative G-Operational Error (Explain) 5 Exhibit I - Same Source (9/77)
Il-Other (Explain) 9
i HONTHLY OPERATIONAL
SUMMARY
STATEMENT
- O DOCKET NO. 50-302 UNIT FLCRP-3 DATE 7/5/83 i
COMPLETED BY n. Bozart i
TELEPHONE (904) 795-6486 MONTH June 1983
SUMMARY
STATEMENT: The unit was shutdown all month for Refuel IV.
i i
- O s
f
- O
.. _,. _ _. _. - _.. _.. ~... _ _ _. _ _......,... _ _...., _.,, _ _ _. _.,...
c
/
- j. -
,/ cf?ges;ag s
6
/p$$;A ;n,*O,gQ&~Q n 2
i g:j.t*) Rig p 3,[Q?
- );
Q e: [.,)f35l
- @(Qi?!
'mye l
l Power C 0 m P o a a f : o se i
i July 11,1983 3F-0783-13 Mr. Richard C. DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555
Subject:
Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report
Dear Mr. DeYoung:
Attached are twelve (12) copies of the Crystal River Unit 3, June,1983, Monthly Operating Report.
This report is submitted in accordance with Technical Soccification 6.9.1.6.
Sincerely, Gary R. Westafer Manager Nuclear Licensing and Fuel Management AEF:mm cc:
Mr. 3. P. O'Reilly, Regional Administrator Office of Inspection & Enforcement j
U.S. Nuclear Regulatory Commission 9
l 101 Marietta Street N.W., Suite 2900 t
!j l
Atlanta, GA 30303
\\
\\
l l
l l
General Office 3201 Thirty-fourth Street South e P O. Box 14042. St Petersburg. Florda 33733 e 813--866-5151 l