ML20072J957

From kanterella
Jump to navigation Jump to search
Suppls 810513 Response to IE Bulletin 80-13 Re Core Spray Spargers & Associated Internal Piping.Visual Insp Found No Addl Indications.No Corrective Actions Required
ML20072J957
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 06/10/1983
From: Mangan C
NIAGARA MOHAWK POWER CORP.
To: Allan J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
REF-SSINS-6820, REF-SSINS-SSINS-6 IEB-80-13, NUDOCS 8307010102
Download: ML20072J957 (1)


Text

-

~

NUMOHAWK Y NIAGARA NIAGARA MOHAWK POWER CORPORATION /200 ERIE BOULEVARD WEST. SYRAOUSE. N.Y.13202/TELEPHCNE (315) 474-1511 June 10, 1983 Mr. James M. Allen Acting Regional Administrator U.S. Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, Pennsylvania 19406 Re:

Nine Mile Point Unit 1 Docket No. 50-220 IE Bulletin 80-13

Dear Mr. Allen:

In accordance with IE Bulletin 80-13, Niagara Mohawk visually inspected the Nine Mile Point Unit 1 core spray spargers and associated internal piping during the recent recirculation piping replacement outage.

The results of this inspection show that there are no additional indications. Also, there has been no growth in those indications previously reported in our May 13, 1981 submittal. Therefore, no corrective action is required at this time.

Niagara Mohawk will continue to monitor the previously reported indications.

Very truly yours, NIAGARA M0 HAWK POWER CORPORATION 9C.V.Ma 04\\

an Vice President i

Nuclear Engineering and Licensing TEL/PAM:bd xc: NRC Office of Inspection and Enforcement Division of Reactor Operations Inspection Washington, D.C. 20555 Director Nuclear Reactor Re5ulation Attention: Mr. Domenic B. Vassallo Chief, Operating Reactors Branch #2 Washingtca, D.C. 20555 k [ 0d N O

G U

lO

.-