p rag y%,,
UNITED 8%TES NUCLEAR REGULAT DY COMMISSION 5
- E WAhMINGTON. D. 20666
'+,.....,o NORTHEAST NUCLEAR ENERGY COMPANY THE CONNECTICUT LIGHT AND POWER COMPANY
_THE HARTFORD ELECTRIC LIGHT COMPANY THE WESTERN MASSACHUSETTS ELECTRIC COMPANY DOCKET NO. 50-336 MILLSTONE NUCLEAR POWER STATION, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 83 License No. DPR-65 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Northeast Nuclear Energy Company, et al. (the licensee) dated March 14, 1983, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and 'all applicable require-ments have been satisfied.
8303300256 830316 PDR ADOCK 05000336 P
. 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-65 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 83 are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment was effective on March 15, 1983.
FOR THE NUCLEAR REGULATORY COMMISSION s
h n
R bert A. Clark, Chief Operating Reactors Branch #3 Division of Licensing
Attachment:
Changes to the Technical Specifications Date of Issuance: March 16, 1983
/
1 l
ATTACHMENT TO LICENSE AMENDMENT NO. 83 FACILITY OPERATING LICENSE NO. DPR-65 DOCKET NO. 50-336 Replace the following pages of the Appendix A Technical Specifications with the enclosed pages. The revised pages are identified by amendment number and contain vertical lines indicating the area of change. The corresponding overl'.af pages are also provided to maintain document compl eteness.
Pages 3/4 4-7 3/4 4-9
/*
0
~
REACTOR COOLANT SYSTEM SURVEILLANCE REQUIREMENTS (Continued) 4.4.5.1.3 Inspection Frequencies - The above required inservice inspections of steam generator tubes shall be performed at the following frequencies:
a.
The first inservice inspection shall be performed after 6 Effective Full Power Months but within 24 calendar months of initial criticality.
Subsequent inservice inspections shall be performed at intervals of not less than 12 nor more than 24 calendar months after the previous inspection.
If two consecutive inspections following service under AVT conditions, not including the preservice inspection, result in all inspec-tion results falling into the C-1 category or if two consecu-tive inspections demonstrate that previously observed degrada-tion has not continued and no additional degradation: has occurred, the inspection interval may be extended to a maximum of once per 40 months.
b.
If the results of the inservice inspection of a steam generator conducted in accordance with Table 4.4-6 at 40 month intervals fall into Category C-3, the inspection frequency shall be increased to at least once per 20 months. The increase in inspection frequency shall apply until the subsequent inspec-tions satisfy the criteria of Specification 4.4.5.1.3.a; the interval may then be extended to a maximum of once per 40 months.
Additional, unscheduled inservice inspections shall be per-formed c.
on each steam generator in accordance with the first sample inspection specified in Table 4.4-6 during the shutdown subse-quent to any of the following conditions:
1.
Primary-to-secondary tubes leaks (not including leaks originating from tube-to-tube sheet welds) in excess of the limits of Specification 3.4.6.2.*
l 2.
A seismic occurrence greater than the Operating Basis Earthquake.
3.
A loss-of-coolant accident requiring actuation of the engineered safeguards; 4.
A main steam line or feedwater line break.
- For the outage commencing on March 1,1983 only, the inservice inspection requirements of Category C-1 of Table 4.4-6 are deferred to the 1983 refueling outage.
Amendr at No. 22,3//, 83 MILLSTONE - UNIT 2 3/4 4-7 n
REACTOR COOLANT SYSTEM SURVEILLANCE REQUIREMENTS (Continued) 4.4. 5.1.4 Acceptance Criteria a.
As used in this Specification 1.
Imperfection means an exception to the dimensions, finish or contour of a tube from that required by fabrication drawings or specifications. Eddy-current testing indications below 20% of the nominal tube wall thickness, if detectable, may be considered as imperfections.
2.
Degradation _ means a service-induced cracking, wastage, wear or general corrosion occurring on either inside or outside of a tube.
3.
Degraded Tube means a tube containing imperfections >20% of the nominal wall thickness caused by degradation.
4.
% Degradation means the percentage of the tube wall thick-ness affected or removed by degradation.
5.
Defect means an imperfection of such severity that it exceeds the plugging limit. A tube containing a defect is defective.
6.
Plugging Limit means the imperfection depth at or beyond which the tube shall be removed from service because it may become unserviceable prior to the next inspection and is equal to 40% of the nominal tube wall thickness.
7.
Unserviceable describes the condition of a tube if it leaks or contains a defect large enough to affect its structural integrity in the event of an Operating Basis Earthquake, a loss-of-coolet accident, or a steam line or feedwater line break as specified in 4.4.5.1.3.c, above.
8.
Tube Inspection means an inspection of the steam generator tube from the point of entry (hot leg side) empletely around the U - Bend to the top support of the cold leg, b.
The steam generator shall be determined OPERABLE after completing the corresponding actions (ping all tubes exceeding the plugging limit and all tubes containing through-wall cracks) required by Table 4.4-6.
MILLSTONE - UNIT 2 3/4 4-7a Amendment No. 4, 77,52
,~,
REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM LEAKAGE LIMITING CONDITION FOR OPERATION 3.4.6.2 Reactor Coolant System leakage shall be limited to:
a.
No PRESSURE B0UNDARY LEAKAGE, b.
1 GPM UNIDENTIFIED LEAKAGE, c.
1 GPM total primary-to-secondary leakage through both steam generators and 0.5 GPM through any one steam generator *, and d.
10 GPM IDENTIFIED LEAKAGE from the Reactor Coolant System.
APPLICABILITY: MODES 1, 2, 3 and 4.
ACTION:
a.
With any PRESSURE B0UNDARY LEAKAGE, be in COLD SHUTDOWN within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.
b.
With any Reactor Coolant System leakage greater than any one of the above limits, excluding PPESSURE BOUNDARY LEAKAGE, reduce the leakage rate to within limits within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> or be in COLD SHUT-DOWN within the next 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.
i
- For the period commencing on March 1,1983 until the end of operation under l
fuel Cycle 5, the leakage through ariy one steam generator shall be limited to 0.35'GPM.
l l
SURVEILLANCE REQUIREMENTS 4.4.6.2 Reactor Coolant System leakages shall be demonstrated to be within each of the above limits by:
a.
Monitoring the containment atmosphere particulate radioactivity at l
least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, b.
Monitoring the containment sump inventory at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, c.
Performance of a Reactor Coolant System water inventory balance at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> during steady state operation except when operating in the shutdown cooling mode.
l MILLSTONE - UNIT 2 3/4 4-9 Amendment No. 25, 37. R, 83 l
REACTOR COOLANT SYSTEM CHEMISTRY LIMITING CONDITION FOR OPERATION 3.4.7 The Reactor Coolant System chemistry shall be maintained within the limits specified in Table 3.4-1.
APPLICABILITY: ALL MODES.
ACTION:
MODES 1, 2, 3 and 4 a.
With any one or more chemistry parameter in excess of its Steady State Limit but within its Transient Limit, restore the parameter to within its Steady State Limit within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in COLD SHUTDOWN within the next 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.
b.
With any one or more chemistry parameter in excess of its Transient Limit, be in COLD SHUTDOWN within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.
MODES 5 and 6 With the concentration of either chloride or fluoride in the Reactor Coolant System in excess of its Steady State Limit for more than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or in excess of its Transient Limit, reduce the pressurizer pressure to < 500 psia, if applicable, and perform an analysis to determine the effects of the out-of-limit condition on the structural integrity of the Reactor Coolant System; determine that the Reactor Coolant System remains acceptable for continued operations prior to increasing the pressurizer pressure above 500 psia or prior to proceeding to MODE 4.
SURVEILLANCE REQUIREMENTS 4.4.7 The Reactor Coolant System chemistry shall be' determined to be within the limits by analysis of those parameters at the frequencies specified in Table 4.4-1.