P OFEFATING DATA FEFORT k
DOCLET N3 50-369 DATE Avaust 15. 1974 CPERAi!NG STATUS COMPLETED BY R.A. Williams TELEFHONE 704-382-5346
- 1. Unit Nase: McGuire 1
- 2. ffeporting Period: 3uly 1, 1994-July 31, 1974
- 3. Licensed Thersal Power (Nth 3411
- 4. Naseplate Rating (Gross MWe):
1305*
Notes *Naaeplate Rating
- 5. Design Electrical Rating (Net MWel:
!!B0 (Gross MWel calculated as
- 6. Finleva Dependable Capacity (Gross MWe h 1171 1450.000 MVA x.90 power
- 7. Martaus Dependable Capac>ty (Net MWe);
1129 factor per Page iii,
- 8. If Changes Dctur in Capacity Ratings (!tess Nesber 3 Through 7) Since last NUREB-0020.
feport. Give Reasons:
- 9. Power Level To Which Restricted, if Any (Net MWeh 10.ReasonforFestrictions,ifany:
This Month ir.-to-Date Cusulative
- 11. Hours In Reporting Feriod 744.0 5067.0 111023.0
- 12. Nuaber Of hours Reactor Was Critical 7%.0 4287.1 78307.6
- 13. Reattor Reserve Shutdown Hours
- - --0--
- 14. Hours Generator On-Line 744.0.
4291.0 77500.5
- 15. Unit Peserve Shutdown Hours
~0- -
--0--
- 16. Eross Thereal Energy Benerated (MWH) 2533930 14373400 241110236
- 17. Bross Electrical Energy Senerated (MWH) 837648 4091054 62853209
- 18. Net Electrical Energy Benerated (MWH)
B04676 4587867 79122017
- 19. Unit Service factor 100.0 B4.2 69.0 t
- 20. Unit Availability factor 100.0 24,2 69.0
- 21. Unit Capacity Factor (using MEC Net) 95 8 81.6 6?.0
- 22. Unit Capacity fatter (Using DER Net) 91.7 78.1 60.4
- 23. Unit forced Outage Rate 0.0 15.9 14.4
- 24. Shutdown Scheduled Dyer Next 6 Mocths (Type, Date, and Duration of Each):
Refueling - August 19, 199,4 - 57 days
- 25. If Shut Down At End Of Feport Period. Estimated Date of Startup:
- 26. Units In test Status (Frier to Consercial Cperationh Forecast Achieved INiilAL CRiflCALITY INIT!AL ELECTRICITY h
COMERCIAL OPERATION e
9408250237 9408i5 PDR ADOCK 05000369 R
. - ~.
-+
OFEFATIN3 DATA FEFORT DOCKET N3 50-369 Utill McGuire 1 DATE Auoust 15,1994 COMPLETED BY R. A. Willijtes TELEPHONE 704-382-5346 MONTH July,1994
]
l C$
AVERAGE DAILt f0WER LEVEL DE AVERAGE DALLY FCWER LEVEL (NWe-Net)
(N'de-Ne t )
1 1007 17 1077 1
2 1097 18 1076 1
3 109B 19 1075 4
1083 20 1072 5
10B1 21 1076 6
108!
22 1082 7
1084 23 1081 8
1099 24 1079 9
1088 25 1080 10 1084 26 1083 1080 27 1093
)
12 1012 28 1081 13 1082 29 1080 14 1004 30 1032 15 1081 31 1091 16 1078
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-369 UNIT NAME McGulut 1 DATE u s/13/ 94 REPORT MONTH July 1994 COMPLETED BY K.
A.
WILLIAMS TELEPHONE
(/u4)-382-3346 (1)
A) $ET-(2 (3)
(4)
(5)
E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S
(1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent W Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER (NUREG-0161))
D-Regulatory Restriction 4-Other (Explain)
File E-Operator Training & License Examination F-Administrative (5)
G-Operator Error (Explain)
Exhibit I - Same Source H-Other (Explain)
+
8 DOCKET: 50-369 UlTIT: McGuire 1 Date:
08/15/94 NARRATIVE
SUMMARY
MOffIH: July 1994 McGuire Unit 1 began the month of July operating at 100% full power. 'Ihe unit operated at or near 100% full power for the entire month.
I i
1 l
Prepared by: R. A. Williams Telephone: (704)-382-5346 i
i l
4 MONTHLY REFUELING INFORMATION REQUEST 1.
Facility name: McGuire, Unit 1 2.
Scheduled next refueling shutdown: Auaust 1994 3.
Scheduled restart following refueling: October 1994 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S.
CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4
THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4.
Will refueling or resumption of operation thereafter require a technical specification change or other licence amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by safety Review Committee regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, i
significant changes in design or new operating procedures).
7.
Number of Fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 583 8.
Present licensed fuel pool capacity: 1463 Size of requested or planned increase:
9.
Projected date of last refueling which can be accommodated by present licensed capacity: March 2006 DUKE POWER COMPANY DATE:
Auaust 15. 1994 Name of
Contact:
R.
A.
Williams Phone:
(704)-382-5346
OPERATING DATA FEPORT DOCKET NG 50-370 DATE Acoust 15. 1994 OPERATING STATUS COMPLETED BV R.A. Williass_
TELEPHONE 704-392-5346
- 1. Unit Nase: Nc5uire 2
- 2. Reporting Period: July 1, 1994-July 31, 1994
- 3. Licensed thermal Power (MWt) 3411
- 4. Nameplate Rating (Gross FWe):
1305e Notes
- Nameplate Rating
- 5. Design Electrical Rating (het MWel:
!!B0 (Gross MWe) calculated as
- 6. Maxinus Dependable Capacity (Eross MWe):
1171 1450.000 MVA x.90 power
- 7. Maxleus Dependable Capacity (Net MWe):
1129 factor per Page iii,
- 8. If Changes Occur in Capacity Ratings (Iteas Number 3 Through 71 Since Last NURE6-0020.
Report. Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
10.ReasonforPestrictions,ifany:
This Month-Yr.-to-Date Cumulative
!!. Hours in Reporting Feriod 744.0 5087,0 91319,0
- 12. Number Of Hours Peactor Was Critical 7%.0 4944.4 70766.4
- 13. Reactor Reserve Shutdown Hours
--0--
--0--
--0--
- 14. Hours Generator On-Line 744.0 4%2.1 69219.3
- 15. Unit Reserve Shutdown Hours
--0--
--0--
--0--
- 16. Gross Thermal Energy Benerated (MWH) 2535315 16799159 228671146
- 17. Gross Electrical Energy Generated (MWH) 854321 5833549 798B2484 IB. Het Electrical Energy Generated (MWH) 622253 5619679 76585799
- 19. Unit Service fattor 100.0 97.2 76.5
- 20. Unit Availabil:ty factor 100.0 97.2 76.5
- 21. Unit Capacity fa:ter (Using MCC het!
97.9 97.8 73A
- 22. Unit Capacity f actor (Using DER Net) 93.7 93.6 71.1 E3, Unit Forced Outage Rate 0.0 2.9 6.9
- 24. Shutdt.wn Scheduled Over Next 6 Months (Type, Date, and Duration of Enth):
Refuelitm - November 24. 1994 - 61 days
- 25. If Shut Down At End Of Report Feriod. Estisated Date of Startup:
- 26. Units In Test Status (Prior to Coseercial Operation):
Forecast Achieved INITIAL CRiflCALITY INITIAL ELECTRICliY C0'mERCIAL OPERAilDN l
r
.,--.my
,,y c
y.
....... =..
. - - - - - - -.. - = ~ ~
i
)
4 OPEFATING DMA FEFORT i
00CFET NO 50-370 (INIT McGuire 2 DATE Acoust 15,1994 COMPLETED BY R.A. Williaes TELEPHONE 704-382-5346 MONIH July, 1994 E
AVE MGE DAILY F0WER LEVEL E
A'iERASE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1
!115 17 1102 2
1!!5 10 1100 3
1115 19 1100 i
4 1113 20 1097 5
!!!2 21 1099 j
6 1111 22 1103 7
1111 23 1102 i
0 1114 24 1101 9
1112 25 1100 10
!!08 26 1102 11 1104 27
!!02 12 1104 28 1102 13 1104 29
!!00 14 1106 30 1101 15 1105 31 1100 1101
1; r
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-370 4:
UNIT NAME Mcuulxt z DATE us/lo/94 REPORT MONTH July 1994 COMPLETED BY H.
A.
WILLIAMS TELEPHONE (1u4)-J62-3346 (1) d)
flEt-(2 (3)
(4)
(5)
E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S i
I i
i l
(1)
(2)
(3)
(4)
F Forced Reason
- Method:
Exhibit G - Instructions A-Equi ment FailureB-Main enance or test (Explain) 1-Manual for Preparation of, Data S Scheduled 2-Manual Scram Ent W Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER (NUEG-0161) )
D-Regulato n Restriction 4-Other (Explain)
File E-Operator Training & License Examination F-Administrative (S)
G-Operator Error (Explain)
Exhibit I - Same Source H-Other (Explain) k
- - - =. - -
v e-r.
-. - ~.
DOCKET: 50-370 UNIT: McG11re 2 Date:
08/15/94 IUGPATIVE
SUMMARY
MOl m I: July 1994 McGlire Unit 2 bcgan the month of July operating at 100% full pwer. The unit operated at or near 100% full pwer for the entire nonth.
Prepared by: R. A. Williams
'Iblephone: (704)-332-5346
MONTHLY REFUELING INFORMATION REOUEST 1.
Facility name: McGuire.
Unit 2 2.
Scheduled next refueling shutdown: November 1994 3.
Scheduled restart following refueling: January 1995 THE PROJECT MANAGER HAS DEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S.
CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4
THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4.
Will refueling or resumption of operation thereafter require a technical specification change or other licence amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
6.
Important licensing considerations (now or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of Fuel assemblies (a) in the core: 121 (b) in the spent fuel pool: all 8.
Present licensed fuel pool capacity: 1463 j
Size of requested or planned increase:
9.
Projected date of last refueling which can be accommodated by present licensed capacity: December 2003 DUKE POWER COMPANY DATE:
August 15. 1994 Name of
Contact:
R.
A.
Williams Phone:
(704)-382-5346 r