ML20072D923

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for May 1983.W/830613
ML20072D923
Person / Time
Site: Crystal River 
Issue date: 06/13/1983
From: Bogart D, Westafer G
FLORIDA POWER CORP.
To: Deyoung R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
3F-0683-04, 3F-683-4, NUDOCS 8306230449
Download: ML20072D923 (5)


Text

..

l.. ~,

OPERATING DATA REPORT

(

DOCKET NO.

50-302 DATE 6 /1/n COMPLETED BY D.S. Bogart TELEPHONE (904) 70s-6486 OPERATING STATUS

1. Unit Name:

Crystal River Unit 3 Notes

2. Reporting Period:

5/1/83 - 5/31/83

3. Licensed Thermal Power (MWt):

2544 890

4. Nameplate Rating (Gross MWe):

825

5. Design Electrical Rating (Net MWe):

850

6. Maximum Dependable Capacity (Grom MWe):

811

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A

9. Power Level To Which Restricted,If Any (Net MWe):

N/A

10. Reasons For Restrictions,If Any:

N/A This Month Yr.-to Date Cumulative l

744 3623 54503 f

11. Hours In Reporting Period
12. Number Of Hours Reactor Was Critical 0

1859.3 34066.5

13. Reactor Reserve Shutdown Hours 0

0 1280.-3

14. Hours Generator On-Line 0

1859.3 33326.2

15. Unit Reserve Shutdown Hours 0

0 0

16. Gmss Thermal Energy Generated (MWH) 0 4488404 75013359
17. Gross Electrical Energy Generated (MWH) 0 1573896 25540513 0

1502253 24247133 3

18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor 0%

51.3%

61.1%

0%

51.3%

61.1%

20. Unit Availability Factor
21. Unit Capacity Factor (Using MDC Net) -

0%

51.1%

56.4%

22. Unit Capacity Factor (Using DER Net) 0%

50.3%

53.9%

23. Unit Forced Outage Rate 0%

0%

25.0%-

24. Shutdowns Scheduled Over Next 6 Months (Type. Date and Duration of Each):

Raftial Outnee which henan 3/19/83. scheduled to last 16 weeks.

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

7/9/83

26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 1/14 /77

([

INITI AL ELECTRICITY I/30/77 COMMERCIAL OPERATION 3/13/77 I'07) r306230449 830601 PDR ADOCK 05000302 R

PDR

L AVERAGE DAILY UNIT POWER LEVEL t

DOCKET NO.

50-302 UNIT FLCRP-3 DATE 6/1/83 COMPLETED BY D.S. Bogart TELEPHONE (904) 795-6486 MONTH Mav 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe Net)

I O

0 37 0

2 is 3

0 39 o

0 0

4 20 5

0 21 0

6 0

0 22 7

0 0

y 0

8 24 0

9 0

25 0

0 0

10 26 l

11 0

27 0

12 0

0 28 0

13 29 0

14 0

30 0

l 15 0

o 3,

1 16 0

INS 1RUCT10NS On this format, list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

(

(9/771

DOCKET NO.

sn in?

UNIT SHUIDOWNS AND POWER REDUCTIONS UNIT NAME FifRP ~4 DATE 6/6/83 COMPLETED BY

n. Ff,,1a.

REPORT MONTH 5/83 1TLEPHONE (904) 795-6486 "i

c rs 3 =a 5*

ES LI"S*'

b.,

8.,

Cause & Corrective

.2 _e E

2g5 Event r, ?

a.1 Action to No.

Date h

gg g

,;g

$5 5

j di g Report #

rN 0 0

Prevent Recurrence H

6 83-07 830501 S

744 C

4 N/A RC FUELXX Refueling Outage. During manual shutdown of the reactor for the refueling outage, the plant exper-ieaced a feedwater pump trip which initiated an automatic scram.

I 2

3 4

F: Forced Reason:

Method:

Exhibit G-Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C Refueling 3 Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination F-Administrative 5

G-Operational Error (Explain)

Exhibit I - Same Source (9/77) llother (Explain)

/

3

,% 4 o

MONTHLY OPERATIONAL

SUMMARY

STATEMENT

?

DOCKET NO. 50-302 UNIT FLCRP-3 DATE 6/6/83 COMPLETED BY D. Fields TELEPHONE (904) 795-6486 MONTH May 1983

~

SUMMARY

STATEMENT:

Shutdown all month for Refuel IV.

l l

oe.

Power C 0 m P O a a t e o as June 13,1983 3F-0683-04 Mr. Richard C. DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555

Subject:

Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report

Dear Mr. DeYoung:

Attached are twelve (12) copies of the Crystal River Unit 3, May 1983, Monthly Operating Report.

This report is submitted in accordance with Technical Specification 6.9.l.6.

Sincerely,

/

2 W

7 Gary R. Westafer Manager Nuclear Licensing and Fuel Management AEF:mm cc:

Mr. J. P. O'Reilly Regional Administrator, Region 11 Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanto, GA 30303

>M 1)

General Office 3201 TNrty-fourin street soutn. P O. Box 14042, st. Petersburg. Florda 33733 813-866-5151