Text
..
l.. ~,
OPERATING DATA REPORT
(
DOCKET NO.
50-302 DATE 6 /1/n COMPLETED BY D.S. Bogart TELEPHONE (904) 70s-6486 OPERATING STATUS
- 1. Unit Name:
Crystal River Unit 3 Notes
- 2. Reporting Period:
5/1/83 - 5/31/83
- 3. Licensed Thermal Power (MWt):
2544 890
- 4. Nameplate Rating (Gross MWe):
825
- 5. Design Electrical Rating (Net MWe):
850
- 6. Maximum Dependable Capacity (Grom MWe):
811
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
N/A
- 9. Power Level To Which Restricted,If Any (Net MWe):
N/A
- 10. Reasons For Restrictions,If Any:
N/A This Month Yr.-to Date Cumulative l
744 3623 54503 f
- 11. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical 0
1859.3 34066.5
- 13. Reactor Reserve Shutdown Hours 0
0 1280.-3
- 14. Hours Generator On-Line 0
1859.3 33326.2
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gmss Thermal Energy Generated (MWH) 0 4488404 75013359
- 17. Gross Electrical Energy Generated (MWH) 0 1573896 25540513 0
1502253 24247133 3
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor 0%
51.3%
61.1%
0%
51.3%
61.1%
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (Using MDC Net) -
0%
51.1%
56.4%
- 22. Unit Capacity Factor (Using DER Net) 0%
50.3%
53.9%
- 23. Unit Forced Outage Rate 0%
0%
25.0%-
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date and Duration of Each):
Raftial Outnee which henan 3/19/83. scheduled to last 16 weeks.
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
7/9/83
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY 1/14 /77
([
INITI AL ELECTRICITY I/30/77 COMMERCIAL OPERATION 3/13/77 I'07) r306230449 830601 PDR ADOCK 05000302 R
L AVERAGE DAILY UNIT POWER LEVEL t
DOCKET NO.
50-302 UNIT FLCRP-3 DATE 6/1/83 COMPLETED BY D.S. Bogart TELEPHONE (904) 795-6486 MONTH Mav 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe Net)
I O
0 37 0
2 is 3
0 39 o
0 0
4 20 5
0 21 0
6 0
0 22 7
0 0
y 0
8 24 0
9 0
25 0
0 0
10 26 l
11 0
27 0
12 0
0 28 0
13 29 0
14 0
30 0
l 15 0
o 3,
1 16 0
INS 1RUCT10NS On this format, list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
(
(9/771
DOCKET NO.
sn in?
UNIT SHUIDOWNS AND POWER REDUCTIONS UNIT NAME FifRP ~4 DATE 6/6/83 COMPLETED BY
- n. Ff,,1a.
REPORT MONTH 5/83 1TLEPHONE (904) 795-6486 "i
c rs 3 =a 5*
b.,
8.,
Cause & Corrective
.2 _e E
2g5 Event r, ?
a.1 Action to No.
Date h
gg g
,;g
$5 5
j di g Report #
rN 0 0
Prevent Recurrence H
6 83-07 830501 S
744 C
4 N/A RC FUELXX Refueling Outage. During manual shutdown of the reactor for the refueling outage, the plant exper-ieaced a feedwater pump trip which initiated an automatic scram.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G-Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C Refueling 3 Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination F-Administrative 5
G-Operational Error (Explain)
Exhibit I - Same Source (9/77) llother (Explain)
/
3
,% 4 o
MONTHLY OPERATIONAL
SUMMARY
STATEMENT
?
DOCKET NO. 50-302 UNIT FLCRP-3 DATE 6/6/83 COMPLETED BY D. Fields TELEPHONE (904) 795-6486 MONTH May 1983
~
SUMMARY
STATEMENT:
Shutdown all month for Refuel IV.
l l
oe.
Power C 0 m P O a a t e o as June 13,1983 3F-0683-04 Mr. Richard C. DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555
Subject:
Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Monthly Operating Report
Dear Mr. DeYoung:
Attached are twelve (12) copies of the Crystal River Unit 3, May 1983, Monthly Operating Report.
This report is submitted in accordance with Technical Specification 6.9.l.6.
Sincerely,
/
2 W
7 Gary R. Westafer Manager Nuclear Licensing and Fuel Management AEF:mm cc: