Proposed Tech Specs Increasing AOT for One Motor Driven AFW Auxiliary Feedwater Pump & for Standby Emergency Power for Unit 1 Train B 4,160 Volt Safeguards Bus (A06) from 7 to 12 Days
ML20072C623
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 08/09/1994
From:
WISCONSIN ELECTRIC POWER CO.
To:
Shared Package
ML20072C604 List:
References
NUDOCS 9408180016
Download: ML20072C623 (3)


Text

. .

j i

1

. I

a. Four service water pumps are operable.*
b. All necessary valves, interlocks and piping required for the functioning of the Service Water System during accident conditions are also operable.
2. During power operation, the requirements of 15.3.3.D-1 may be modified to allow one of the following components to be inoperable at any one  ;

time. If the system is not restored to meet the conditions of 15.3.3.D-1 within the time period specified, both reactors will be placed in the hot shutdown condition. If the requirements of 15.3.3.D-1 are not satisfied within an additional 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />, both reactors shall be placed in the cold shutdown condition.

a. One of the four required service water pumps may be out of service provided a pump is restored to operable status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
b. One of the two loop headers may be out of service for a period of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
c. A valve or other passive component may be out of service provided repairs can be completed within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.

Basis The normal procedure for starting the reactor is, first, to heat the reactor coolant to near operating temperature, by running the reactor coolant pumps.

The reactor is then made critical by withdrawing control rods and/or diluting boron in the coolant.m With this mode of start-up, the energy stored in the reactor coolant during the approach to criticality is substantially equal to that during power operation and therefore to be conservative most engineered safety system components and auxiliary cooling systems, shall be fully operable.

During low temperature physics tests there is a negligible amount of stored energy in the reactor coolant, therefore an accident comparable in severity to the Design Basis Accident is not possible, and the engineered safety systems are not required.

[ ;Ddrin'gEthe Unio 2T1994Vefueliiif60 tag 6MneHFiin~B? SEW 1EejVitsrjipiiih operating:with:powerEsupplied by;the:' Alternate? Shutdown (Systemi B08/B09 480- voltibus'es',J mayl be . considered foperable4 fromfaf normali{dffif ts)'

powerf supply,i under the provisions;of TechnicaltSpecification;15.3.0ic?

Unit 1 - Amendment No. 15.3.3-6 Unit 2 - Amendment Nn 9408180016 940809 PDR ADOCK0500g6 P

e

'2. Single Unit Operation - One of the three operable auxiliary feedwater pumps associated with a unit may be out-of-service for the below specified times. The turbine driven auxiliary feedwater pump may be out-of-service for up to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. If the turbine driven auxiliary feedwater pump cannot be restored to service within that 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> time period, the reactor shall be in hot shutdown within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. Either one of the two motor driven auxiliary feedwater pumps may be out-of-service for up to 7 days.f If the motor driven auxiliary feedwater pump cannot be restored to service within that 7 day period the operating unit shall be in hot shutdown within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

D. The main steam stop valves (MS-2017 and MS-2018) and the non-return check valves (MS-2017A and MS-2018A) shall be operable. If one main steam stop valve or non-return check valve is inoperable but open, power operation may continue provided the inoperable valve is restored to operable status within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, otherwise the reactor shall be placed in a hot shutdown condition within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. With one or more main steam stop valves or non-return check valves inoperable, subsequent operation in the hot shutdown condition may proceed provided the inoperable valve or valves are maintained closed. An inoperable main steam stop valve or non-return check valve may however, be opened in the hot shutdown condition to cool down the affected unit and to perform testing to confirm operability.

E. The crossover steam dump system shall be operable. If the crossover steam dump system is determined to be inoperable, reduce power to less than 480 MWe (gross) within 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />.

F. During power operation, at least one of the turbine overspeed protection i systems that trip the turbine stop valves or shut the turbine governor valves shall be operable. If all three systems are determined to be i inoperable, isolate the turbine from the steam supply within the next six hours.

f

~

iDOHngTthfunifT1994 refuelingloutigeQPi388[the7TpiWfm 6f66%1)id auxiliary feedwater:p.umpc mayLbe ont-of-s_ervice::foriupjstoJ12idays; Unit 1 - Amendment No.

Unit 2 - Amendment No. 15.3.4-2a 1

F

e. With a unit defueled, one pair of buses for the defueled unit, A05 and A06 or 803 and B04, may be tied together through their cer. won tie-breaker in excess of 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> provided:
1) An evaluation is performed to show that the loads that remain or can be energized by the buses will not cause a potential overload of the associated diesel generator. The applicable Limiting Conditions for Operation of the equipment removed from service shall be entered for the operating unit.
2) A single train of spent fuel cooling is adequate to cool the spent fuel pool.
3) The required redundant shared engineered safety features for the other unit are operable.
f. The normal power supply or standby emergency power supply to Unit 1 A05/B03 or Unit 2 A06/B04 may be out of service for a period not exceeding 7 days provided the required redundant engineered safety features are operable and the required redundant standby emergency power supplies are started within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> before or after entry into this LC0 and every 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> thereafter. If the normal power supply is out of service, an operable emergency diesel generator is supplying the affected 4160/480 Volt buses. After 7 days, both units will be placed in hot shutdown within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and cold shutdown within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.
g. The normal power supply or standby emergency power supply to Unit 1 A06/B04 or Unit 2 A05/B03 or both may be out of service for a period not exceeding 7 days provided the required redundant engineered safety features are operable and the required redundant standby emergency power supplies are started within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> before or after entry into this LC0 and every 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> thereafter. If the normal power supply is out of service, an operable emergency diesel generator is supplying the affected 4160/480 Volt buses. After 7 days, the affected unit or units will be placed in hot shutdown within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and cold shutdown within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />.
h. The normal power supply or standby emergency power supply to Unit 1 A05/B03 and Unit 2 A05/B03, or Unit 1 A06/B04 and Unit 2 A06/B04 may be out of service for a period not exceeding 7 dayst provided the required redundant engineered safety features are operable and the required redundant standby emergency power supplies are started within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> before or after entry into this LC0 and every 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> thereafter. If the normal power supply is out of service, an f ,iDl@ihg[th510ditT2l99CrifEilinglbOpiiFMts6dbyysMifyispy3bileMib Units 1? A0QB04f ari(Unit}2] A.06[B04[fnayJAiostfoff sersiRf6Musto
                ]2Jsyg Unit 1 - Amendment No.                   15.3.7-4 Unit 2 - Amendment No.
                                                 -}}