ML20072C305

From kanterella
Jump to navigation Jump to search
First Interim Deficiency Rept Re B&W Plant Internal Bolt Failures.Initially Reported on 830513.B&W & B&W Owners Group Assessing Situation to Determine Scope of Problem & Corrective Actions.Next Rept to Be Submitted by 831206
ML20072C305
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 06/13/1983
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, NCR-R-30, NUDOCS 8306210018
Download: ML20072C305 (2)


Text

.

7 TENNESSEE VALLEY AUTHOER Qkgg [O//,

q CHATTANOOGA TENNESSEE 374ot 400 Chestnut Street Tower I

' ' O Ag)

/8 p8'Sg June 13, 1983 BLRD-50-438/83-35 BLRD-50-439/83-31 U.S. Nuclear Regulatory Conmission Region II Attn:

Mr. James P. O'Reilly, Regional Administrator 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - B&W PLANT INTERNAL BOLT FAILURES

- BLRD-50-438/83-35, BLRD-50-439/83 FIRST INTERIM REPORT The subject deficiency was initially reported to NRC-0IE Inspector Linda Watson on May 13, 1983 in accordance with 10 CFR 50.55(e) as NCR R-30.

Enclosed is our first interim report. We expect to submit our next report by December 6,1983 If you have any questions, please get in touch with R. H. Shell at FTS 858-2688.

Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills, nager Nuclear Licensing l

Enclosure cc: Mr. Richard C. DeYoung, Director (Enclosure)

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Records Center (Enclosure)

Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 i

4Is Q1ptp }

.. i 8306210018 830613

/[2

/

PDR ADOCK 05000438 y

l S

pm

\\

\\

An Equal Opportunity Employer

1 c -

ENCLOSURE l

BELLEFONTE NUCLEAR PLANT UNITS 1 AND.2 B&W PLANT INTERNAL BOLT FAILURES BLRD-50-438/83-35, BLRD-50-439/83-31 l

10 CFR 50.55(e)

NCR R-30 FIRST INTERIM REPORT Description of Deficiency The Babcock and Wilcox (B&W) Owners Group has opened issue R-30 " Internals Bolting Failures" documenting a potential safety concern with B&W plants.

Specifically, there have been failures or A-286 bolts used in various reactor internals applications at Oconee-1, Rancho Seco and Crystal River-3 Although B&W contends that the problem is not applicable to Bellefonte, TVA has questioned B&W's determination and is awaiting a reply from B&W. Until such time that R-30 is determined to not be a concern at Bellefonte, TVA considers the condition to be a potentially reportable nonconformance. Consequently, this NCR is intended to track the potential concern for Bellefonte.

Interim Progress B&W and the B&W Owners Group are assessing the situation to determine the scope of the problem and recommended corrective actions. TVA will provide additional details upon conclusion of this review.