ATTACHMENT 1 LIMERICK GENERATING STATION UNITS 1 AND 2 Docket Nos. 50-352 50-353 License Nos. NPF-39 NPF-85 REVISED TECHNICAL SPECIFICATIONS PAGES SUPPORTING TECHNICAL SPECIFICATIONS CHANGE REQUEST No. 90-13-0 LIST OF AFFECTED PAGES UNIT 1 UNIT 2 6-3 6-3 9408160305 DR 940so4 ADOCK 05000352 PDR

AbAINIS'TRATIVECONTROLS U. NIT STAFF (Continued)

Any deviation from the above guidelines shall be authorized by the Plant Manager or personnel designated in administrative procedures or higher levels of management, in accordance with established procedures and with documentation of the basis for granting the deviation. Controls shall be included in the procedures such that individual overtime shall be reviewed i monthly by the Plant Manager, or the appropriate designated  :

personnel to assure that excessive hours have not been assigned. i Routine deviation from the above guidelines is not authorized;  !

and j

g. The Superintendent Operations or the Assistant Superintendent Operations shall hold a Senior Reactor Operator License.

1 i

t LIMERICK - UNIT 1 6-3

i

- 1 AbNINIS'TRATIVE' CONTROLS I i

6.2.2 UNIT STAFF (Continued)

3. A break of at least 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> should be allowed between work periods, including shift turnover time.
4. Except during extended shutdown periods, the use of overtime should be considered on an individual basis and not for the entire staff on a shift.

Any_ deviation from the above guidelines shall be authorized by the Plant Manager or personnel designated in administrative procedures' or higher levels of management, in accordance with established pro-cedures and with documentation of the basis for granting the devia-tion. Controls shall be included in the procedures such that individual overtime shall be reviewed monthly by the Plant Manager, or the appropriate designated personnel to assure that excessive hours have not been assigned. Routine deviation from the above guidelines is not authorized; and

g. The Superintendent Operations or the Assistant Superintendent Operations shall hold a Senior Reactor Operator License, i

1 LIMERICK - UNIT 2 6-3 i