Forwards Overpressure Protection Rept for Catawba Nuclear Power Plant,Units 1 & 2 as Required by ASME Boiler & Pressure Vessel Code,Section Iii,Article NB-7300 & Response to SER Open Item 7 & Confirmatory Item 24
ML20071N707
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 05/27/1983
From: Tucker H
DUKE POWER CO.
To: Adensam E, Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20071N713 List:
References
NUDOCS 8306070206
Download: ML20071N707 (2)


Text

DUKE POWER GOMPANY P.O. IBOx 33180 CHARLOTTE, N.C. 28242 HAL B. TUCKER TE1EPHONE vaca raremmen, (704) 373-4538 wistaAe amonoceron May 27, 1983 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Ms. E. G. Adensam, Chief Licensing Branch No. 4 Re: Catawba Nuclear Station Docket Nos. 50-413 and 50-414

Dear Mr. Denton:

The purpose of this letter is to provide follcw-up information in response to two items discussed in the Catawba Safety Evaluation Report.

Open Item 7 - Pressurizer safety valve sizing - As noted in Section 5.2.2.1 of the SER, the Staff has requested additional information on the details of this calculation. Information on pressurizer safety valve sizing has been provided in response to Questions 440.11, 124 and 130. This item was also discussed in detail at the ACRS Meeting on Catawba (275th General Meeting, March 11, 1983, transcript pages 206-220). In addition, please find attached the Overpressure Protection Report for Catawba which is required by Section III of the ASME Code. This report shows that the overpressure protection provided is sufficient to maintain peak Reactor Coolant System pressure below the code limit of 110% of system design pressure.

Confirmatory Item 24 - LOCA sensitivity analysis - As requested by Question 440.147 a:d as discussed in SER Section 6.3.5.1, additional DECLG break cases have been analyzed. The results confirm that the previously identified limiting i break remains the limiting case. The response to Question 440.147 is attached.

Very truly yours, l

C h A, 6-a% </ ^

Hal B. Tucker ROS/php Attachment cc: Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30303 k

KO E PM 3 l!

11

Mr. Harold R. Denton, Diractor May 27, 1983 Page 2 cc: Mr. P. K. Van Doorn NRC Resident Inspector Catawba Nuclear Station Mr. Robert Guild, Esq.

Attorney-at-Law -

P.O. Box 12097 Charleston, South Carolina 29412 Palmetto Alliance 2135 Devine Street Columbia, South Carolina 29205 Mr. Jesse L. Riley Carolina Environmental Study Group 854 Henley Place Charlotte, North Carolina 28207 Mr. Henry A. Presler, Chairman