ML20071M242

From kanterella
Jump to navigation Jump to search
Amends 49 & 74 to Licenses DPR-71 & DPR-62,respectively, Permitting Continued Operation Until Certain Surveillances Performed,But No Later than 820715
ML20071M242
Person / Time
Site: Brunswick  
Issue date: 09/09/1982
From: Vassallo D
Office of Nuclear Reactor Regulation
To:
Carolina Power & Light Co
Shared Package
ML20071M245 List:
References
DPR-62-A-074, DPR-71-A-049 NUDOCS 8209240525
Download: ML20071M242 (4)


Text

+ pen:

l ff UNITED STATES e

g NUCLEAR REGULATORY COMMISSION I

E WAEMNGTON, D. C. 20555

)

o 1

%...* /

CAROLINA POWER & LIGHT COMPANY DOCKET NO. 50-325 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NO.1 AMENDMENT TO FACILITY OPERATING LICENSE

- Amendment No. 49 License No. DPR-71 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Carolina Power & Light Company dated July 1, 1982 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in conpliance viith the Commission's regulations; D.

The issuance of this anendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendtrent is in accordance with 10 CFR Part 51 of the Cormission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by adding paragraph 2.C.(2)(a) to Facility Operating License No. DPR-71 as follows:

(a) Effective June 30, 1982, the surveillance requirements listed below need not be completed until July 15, 1982. Upon' accomplishment of the surveillances, the provisions of Technical Specification 4.0.2 shall apply.

Specification 4.3.3.1, Table 4.3.3-1, Items 5.a an.1 5.b G209240525 820909 PDR ADOCK 05000324 P

PDR

2 l

3.

This license amendment is effective as of July 1,1982.

11 FOR THE NUCLEAR REGULATORY COMMISSION i

i.

Donenic B. Vassallo, Chief Operating Reactors Branch #2 Division of Licensing Date of Issuance:

September 9, 1982 i

l i

a i

t l

=

i 1

i 4,f p

UMTED STATES g

p'*/

E y

,, ( 3 g NUCLEAR REGULATORY COMMISSION WASHINGTON. D. C. 20555 5

i CAROLINA POWER & LIGHT COMPANY DOCKET N0. 50-324 BRUNSWICK STEAM ELECTRIC PLANT, UNIT M0. 2 AMENC!ENT TO FACILITY CPERATING LICENSE Amendment h'o.

74 License No. DPR-62 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Carolina Power & Light Company dated July 1, 1982, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; S.

The facility will operate in conformity with the application, the L. cVisions of the Act, and the rules anc regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this areadment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliar.ce with the Commission's regulations; D.

The issuance of this amendment will. not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by adding paragraph 2.C.(2)(b) to Facility Operating License No. DPR-62 as follows:

(b) Effective June 30, 1982, the surveillance requirements listed below need not be completed until restart for Cycle 5 or July 15, 1982, whichever occurs first. The unit shall not be operated in Conditions 1, 2 or 3 until the surveillance requirements listed below have been nnpleted. Upon accomplishment of the surveillances, the provisions of Technical Specifi-cation 4.0.2 shall apply.

Specification 4.3.3.1, Table 4.3.3-1, Items 5.a and 5.b.

1 2

3.

This license amendment is effective as of July 1,1982.

FOR THE NUCLEAR REGULATORY COMMISSION

~

p Domenic B. Vassallo, Chief Operating Reactors Branch #2 Division of Licensing Date of Issuance: September 9, 1982 i

i w

d 1

i

-