O l
j ATTACKMENT 2 TECHNICAL SPECIFICATION PAGES WITH PEN AND INK CHANGES LICENSE AMENDMENT APPLICATION REVISION AND RELOCATION OF EDG FUEL OIL SURVEILLANCE REQUIREMENTS FACILITY OPERATING LICENSE NPF-57 HOPE CREEK GENERATING STATION NLR-N94110 DOCKET NO. 50-354 LCR 94-16 The following Technical Specifications for Facility Operating License No. NPF-57 are affected by this License Amendment Request:
Technical Specification Paaes 4.8.1.1.2.f 3/4 8-5 and 3/4 8-6 940eo4005e 94o72a PDR ADOCK 05000354 P
PDR i
e k
ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) 6.
Verifying the diesel generator is aligned to provide standby power to the associated emergency busses.
7.
Verifying the pressure in all diesel generator air start receivers to be greater than or equal to 325 psig.
8.
Verifying the lube oil pressure, temperature and differential pressure across the lube oil filters to be within manufac-turer's specifications.
b'.
At least once per 31 days by visually examining a sample of lube oil from the diesel engine to verify absence of water.
At least once per 31 days and after each operation of the diesel where c.
the period of operation was greater than or equal to I hour by checking for and removing accumulated water from the fuel oil day tank.
d.
At least once per 92 days by removing accumulated water from the fuel oil storage tanks.
e.
At least once per 31 days by perfoming a functional test on the emergency load sequencer to verify operability.
[At least once pe/92 days /and frop/new f 1' oil prior to add t' ion to V
i the storage tanks by obta'ining 4 sample n accordance with
/
ASTfD4057 and by ver (ying tt}at the s le see ( the fol)ime chg finits:j/q61 resents )and is ing
]
j minimum re ested w in the pecified 7g g g}
1.
s soon as samp taken r from fuel pp or to i ton to the storage k, as Ifcable, verify ja acco with the te(ts spec fied in,TM-0975r77 that the sample s:
a A we and s ment c nt of I s than or equal 0.0$ volume rcent.
/
b) kineasti viscosi y 9 40*Cf f greate than or equal to
- 1. 9 c
- 1 stokes, tiut less 3Aan or to4.Jcontistoes or a $
It ond Univgesal (550) iscosi y at 100* of reefer than r equal ts'32 SSU but less or 1 to
'.1 55U.
,/-
c)
A specif c g*ravity as speci by manufac rer as I
or 1 to
' degree but gravi,ty 9 60 F of greater j'
j 1est than or 1 to 4 s.
- spurJ[d 2
Within na week fter oct i ing the'saeple, v6rify f
y levelofless'w$an2og
/
t insoludies per al.
tape in'accordance ith AS 02274-7AI.
/
/
/
F HOPE CREEK 3/4 8-5 himdeant No. 22
El.ECTRICAL POWER SYSTEMS U
SURVEllthNrF REQUIREMENTS (Continuedi weeks a ter bt;ning he samp e, ver fy tha the pfher -
3 Wi in oper es spec'fied 't Table of AS -D975-7 aid egul (ory uide
.137. P sitio 2.a, a e met w en tes ed in a cord ce wit ASTM-D9) -77.
/
/
g.
Deleted h.
At least once per 18 months #, during shutdown, by:
l 1.
Subjecting the diesel to an inspection in accordance with procede es prepared in conjunction with its manufacturer's recommendations for this class of standby service.
2.
Verifying the diesel generator capability to reject a load of greater than or equal to that of the RHR pump motor (1003 kW) for each diesel generator while maintaining voltage at 4160 420 volts and frequency at 60 1.2 Hz.
3.
Verifying the diesel generator capability to reject a load of 4430 kW without tripping. The generator voltage shall not exceed 4785 volts during and following the load rejection.
4.
Simulating a loss of offsite power by itself, and:
a)
Verifying loss of power is detected and deenergization of the emergency busses and load shedding from the emergency busses.
b)
Verifying the diesel generator starts
- on the auto-start signal, energizes the emergency busses with permanently connected laads within 10 seconds after receipt of the start signal, energizes the autoconnected shutdown loads through the load sequencer and operates for greater than or equal to 5 minutes while its generator is loaded with the shutdown loads. After energization, the steady state voltage and frequency of the emergency busses shall be maintained at 4160 420 volts and 60 1.2 Hz during this test.
- This diesel generator start (10 sec) and subsequent loading (130 sec) from ambient conditions may be preceded by an engine prelube period and/or other warmup procedures recommended by the manufacturer so that mechanical stress and wear on the diesel engine is minimized.
- For any start of a diesel generator, the diesel must be loaded in accordance with the manufacturer's recommendations.
Amendment No. 65 HOPE CREEK 3/4 8-6
INSERT In accordance with the surveillance interval specified in the Diesel Fuel Oil Testing Program and prior to the addition of new fuel oil to the storage tank, samples shall be taken to ver' fy fuel oil quality.
Sampling and testing of new and stored fuel o2. shall be in accordance with the Diesel Fuel Oil Testing Program to maintain fuel oil properties within established limits.
, _ - -