Proposed Tech Specs Re Administrative Change
ML20071L895
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 07/29/1994
From:
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20071L890 List:
References
NUDOCS 9408030316
Download: ML20071L895 (2)


Text

ENCLOSURE 2 BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2 NRC DOCKET NOS. 50-325 & 50-324 OPERATING LICENSE NOS. DPR-71 & DPR-62 REQUEST FOR LICENSE AMENDMENT ADMINISTRATIVE CHANGE BRUNSWICK UNIT 2 PROPOSED TECHNICAL SPECIFICATION PAGE 9408030316 940729 PDR ADOCK 05000324 P

PDR

I

)

INSTRUMENTATION END-OF-CYCLE RECIRCULATION PUMP TRIP SYSTEM INSTRUMENTATION LIMITINC CONDITION FOR OPERATION 3.3.6.2 The end-of-cycle recirculation pump trip (EOC-RPT) system instrumentation channels shown in Table 3.3.6.2-1 shall be OPERABLE with their trip setpoints set consistent with the values shown in the Trip Setpoint column of Table 3.3.6.2-2 and with the END-OF-CYCLE RECIRCULATION PUMP TRIP SYSTEM RESPONSE TIME as shown in Table 3.3.6.2-3.

APPLICABILITY: OPERATIONAL CONDITION 1, when THERMAL POWER is greater than or equal to 30% of RATED THERMAL POWER.*

ACTION:

With an end-of-cycle recirculation pump trip system instrumentation a.

channel trip setpoint less conservative than the value shown in the l

Allowable Values Column of Table 3.3.6.2-2, declare'the channel inoperable until the channel is restored to OPERABLE status with the channel setpoint adjusted consistent with the Trip Setpoint value.

b.

With the number of OPERABLE channels one less than required by the

]

Minimum OPERABLE Channels per Trip $ystem requirement for one or both

../

trip systems, place the inoperable channel (s) in the tripped condition within one hour.-

With the number of OPERABLE channels two or more less than required c.

by the Minimum OPERABLE Channels per Trip System requirement for one trip system and:

1.

If the operable channels consist of one turbine control valve channel and one turbine stop valve channel, place both inoperable channels in the tripped condition within one hour.

2.

If the inoperable channels include two turbine control valve channels or two turbine stop valve channels, declare the trip system operable.

d.

With one trip system inoperable, restore the inoperable trip system to OPERABLE septus _within,J2,b urs or take the ACTION required by Specification -3.2.3.(3,,1, L j With both trip systems inoperable, restore at least one trip system e.

to OPE'lABLE status-withig one hog or take the ACT!0N required by Specificatiob 1

  • During the current cycle operation, the end-of-cycle recircelation pump trip (EOC-RPT) system will be inoperable (manually bypassed); therefore,

'T Specification 3.3.6.2 above does not apply. The provisions of

/

Specification 3.0.4 are not applicable.

BRUNSWICK - UNIT 2 3/4 3-93 Arendment No. 160 l

..