SOUTH CAROLINA ELECTRIC & GAS COMPANY pCS, OWWICE 784 CotuustA. SouTM CAnoLINA 29218
- Ca.i*ndr"-
NUCLEAR Openarious fA March 14, 1983 yJ
'70 6
v$
o sg A
.m D
Mr. James P.
O'Reilly Regional Administrator Ty U.
S. Nuclear Regulatory Commission Suite 2900
/,
101 Marietta Street, NW Atlanta, GA 30303
SUBJECT:
Virgil C. Summer Nuclear Station Docket No. 50/395 Operating License No. NPF-12 Notice of Violation NRC Report 83-04
" Radiation Area Posting"
Dear Mr. O'Reilly:
Please find attached South Carolina Electric and Gas Company's response to the Notice of Violation as addressed in Appendix A of NRC Inspection Report 83-04.
If there are any questions, please call us at your convenience.
Very truly your O.
W.
Di n
l HCF:0WD:dwr i
Attadhments cc:
V.
C.
Summer A.
R.
Koon T.
C. Nichols, Jr. -
G.
D. Moffatt E.
C.
Roberts Site QA O.
W.
Dixon, Jr.
C. L. Ligon (NSRC)
H. N. Cyrus G. J. Braddick l
-H.
T.
Babb J.
C. Miller i
D.
A. Nauman J. L.
Skolds l
M.
B. Whitaker, Jr.
J.
B.
Knotts, Jr.
l W.
A.
Williams, Jr.
B.
A.
Bursey O.
S. Bradham I&E (Washington)
R.
B.
Clary Document Management Branch C.
A.
Price NFCP File i
0 g$
F Mr. James P. O'Reilly NRC Notice of Violation Page Two March 14, 1983 RESPONSE TO NOTICE OF VIOLATION INSPECTION REPORT 83-04 I.
ADMISSION OR DENIAL OF THE ALLEGED VIOLATION South Carolina ' Electric and Gas Company is in agreement with the alleged violation.
II.
REASON (S) FOR THE VIOLATION The area outside the containment equipment hatch on the 472 '
elevation had been surveyed and posted by health physics.
Documented surveys show that the area had been surveyed and the posting updated on January-14, 1983.
The inspector identified the area as not being posted on January 19, 1983.
During the inspection, it was determined that high winds through the area had blown the sign down.
III.
CORRECTIVE STEPS TAKEN AND RESULTS ACHIEVED Upon discovering that the wind had blown down the initial sign, the area was reposted.
The initial posting had been suspended on a rope barricade across the containment equipment hatch entrance.
Subsequent action was taken to rigidly mount the posting on the concrete wall adjacent more to the entrance.
IV.
CORRECTIVE ACTION TAKEN TO AVOID FURTHER VIOLATION This more rigid posting for the containment equipment hatch area should prevent further problems' associated with the winds in the area.
The applicable health physics procedure has been revised to include precautions that when posting signs in outside areas to assure that the signs will not be degraded due to weather elements.
V.
DATE OF FULL COMPLIANCE The above mentioned items have been implemented.