MONTHYEARML20217F1041999-10-14014 October 1999 Proposed Tech Specs Pages,Revising TS Sections 2.2 & 3.0/4.0,necessary to Support Mod P000224 Which Will Install New Power Range Neutron Monitoring Sys & Incorporate long- Term thermal-hydraulic Stability Solution Hardware ML20216J3471999-09-27027 September 1999 Corrected Tech Specs Page,Modifying Appearance of TS Page 3/4 4-8 as Typo Identified in Section 3.4.3.1 ML20212H5681999-09-27027 September 1999 Proposed Tech Specs Pages,Revising TS to Clarify Several Administrative Requirements,Delete Redundant Requirements & Correct Typos ML20196F5551999-06-22022 June 1999 Proposed Tech Specs Pages to Delete Surveillance Requirement 4.4.1.1.2 & Associated TS Administrative Controls Section 6.9.1.9.h,removing Recirculation Sys MG Set Stop ML20195H0651999-06-0909 June 1999 Revised Bases Pages B 3/4 10-2 & B 3/4 2-4 for LGS Units 1 & 2,in Order to Clarify That Requirements for Reactor Enclosure Secondary Containment Apply to Extended Area Encompassing Both Reactor Enclosure & Refueling Area ML20195E7611999-06-0707 June 1999 Proposed Tech Specs Table 3.6.3-1 & Associated Notations, Reflecting Permanently Deactivated Instrument Reference Leg Isolation Valve HV-61-102 ML20195G0481999-06-0707 June 1999 Proposed Tech Specs Section 3/4.4.3, RCS Leakage,Leakage Detection Systems, Clarifying Action Statement Re Inoperative Reactor Coolant Leakage Detection Systems ML20195B8431999-05-26026 May 1999 Proposed Tech Specs Section 4.1.3.5.b,removing & Relocating Control Rod Scram Accumulators Alarm Instrumentation to UFSAR & TS Section 3.1.3.5,allowing Alternate Method for Determining Whether Control Rod Drive Pump Is Operating ML20207L6591999-03-11011 March 1999 Proposed Tech Specs Section 2.1, Safety Limits, Revising MCPR Safety Limit ML20199G2021999-01-12012 January 1999 Proposed Tech Specs Section 3/4.4.2 & TS Bases Sections B 3/4.4.2,B 3/4.5.1 & B 3/4.5.2 to Increase Allowable as-found Main Steam SRV Code Safety Function Lift Setpoint Tolerance from +1% to +3% ML20199A7271999-01-0404 January 1999 Proposed Tech Specs Revising Administrative Section of TS Re Controlled Access to High Radiation Areas & Rept Dates for Annual Ore Rept & Annual Rer Rept ML20155H6401998-10-30030 October 1998 Proposed Tech Specs Pages Revising TS SRs 4.8.4.3.b.1, 4.8.4.3.b.2 & 4.8.4.3.b.3 in Order to Reflect Relay Setpoint Calculation Methodology ML20154Q8941998-10-15015 October 1998 Proposed Tech Specs Re Addition of Special Test Exception for IST & Hydrostatic Testing ML20154L3971998-10-13013 October 1998 Revised Tech Spec Bases Pages,Clarifying Thermal Overload Operation for Motor Operated Valves with Maintained Contact Control Switches ML20151Z4721998-09-14014 September 1998 Proposed Tech Specs Revising Table 4.4.6.1.3-1,re Withdrawal Schedule for Reactor Pressure Vessel Matl Surveillance Program Capsules ML20151V0951998-09-0404 September 1998 Proposed Tech Specs Ensuring Fidelity Between TS Pages & 970324 Submittal ML20236M1221998-07-0202 July 1998 Proposed Tech Specs Change Request 96-06-0,modifying FOL Page 8 ML20217K5291998-04-24024 April 1998 Proposed Tech Specs Page 6-18a Revising MCPR Safety Limit for Lgs,Unit 1,cycle 8 ML20202G7871998-02-0909 February 1998 Proposed TS Section 2.1, Safety Limits, Revising MCPR Safety Limit.Nonproprietary Supporting Info Encl ML20199G7771998-01-27027 January 1998 Proposed Tech Specs Pages,Removing Maximum Isolation Time for HPCI Turbine Exhaust Containment Isolation Valve HV-055-1(2)F072 from TS ML20198M7861998-01-12012 January 1998 Proposed Tech Specs Table 4.4.6.1.3-1 Re Surveillance Specimen Program Evaluation for Limerick Generating Station, Unit 1 ML20199H5971997-11-18018 November 1997 Proposed Tech Specs Re Affected Unit 1 FOL Page 8 ML20212D1851997-10-24024 October 1997 Proposed Tech Specs Revising Section 3/4.1.3.6 to Exempt Control Rod 50-27 from Coupling Test for Remainder for Cycle 7 at LGS Unit 1,provided Certain Conditions Are Met ML20216H1101997-09-0808 September 1997 Proposed Tech Specs,Supplementing Change Request 96-06-0 by Adding Three Addl TS Pages Containing Typos Discovered Since 970225 Submittal ML20210T9231997-09-0202 September 1997 Proposed Tech Specs,Revising TS Section 4.0.5 & Bases Sections B 4.0.5 & B 3/4.4.8 Re SRs Associated W/Isi & IST of ASME Code Class 1,2 & 3 Components ML20138A2311997-04-21021 April 1997 Proposed Tech Specs,Providing New Pp B 3/4 8-2a to Accomodate Overflow of Text from TS Bases Pp B 3/4 8-2 ML20137X8101997-04-0909 April 1997 Proposed Tech Specs Re Battery Specific Gravity Changes ML20137G6751997-03-24024 March 1997 Proposed Tech Specs Deleting Drywell & Suppression Chamber Purge Sys Operational Time Limit & Add SR to Ensure Purge Sys Large Supply & Exhaust Valves Are Closed as Required ML20135D0961997-02-25025 February 1997 Proposed Tech Specs Changing Corporate Name from PA Electric Co to PECO Energy Co & Removing Obsolete Info & Correcting Typos ML20133L2141997-01-15015 January 1997 Proposed Tech Specs Pp 3/4 5-5 mark-up Rev for Unit 1 Revising TS by Eliminating in-situ Functional Testing of ADS Valves Requirement as Part of start-up Testing Activities ML20135F0961996-12-0606 December 1996 Proposed Tech Specs 2.1 Re Safety Limits ML20135A4491996-11-25025 November 1996 Proposed Tech Specs Change Request 96-22-0,revising TS SR 4.8.1.1.2.e.2 & Supporting TS Bases Section 3/4.8,to Clarify Requirements Associated W/Single Load Rejection Testing of EDGs ML20134L7571996-11-0505 November 1996 Proposed Tech Specs Revising Same Pp Contained in TS Change Request 95-14-0 Re Adoption of Performance Based 10CFR50, App J,Option B Testing ML20128N7761996-09-27027 September 1996 Proposed Tech Specs 3/4.6.5 Re Secondary Containment & 4.6.5.1.1 Re Surveillance Requirements ML20116L2701996-08-0808 August 1996 Proposed Tech Specs,Revising TS Sections 3/4.3.1,3/4.3.2, 3/4.3.3 & Associated TS Bases Sections 3/4.3.1 & 3/4.3.2 to Eliminate Selected Response Time Testing Requirements ML20116H6511996-08-0505 August 1996 Proposed Tech Specs Section 2.1, Safety Limits, to Revise Min Critical Power Ratio Safety Limit ML20116E6191996-08-0101 August 1996 Proposed Tech Specs 3/4.4.6 Re Addition of Two Hydroset Curves,Effective for 6.5 & 8.5 Efpy,To Existing Ptol Curves ML20115A9111996-06-28028 June 1996 Proposed Tech Specs,Performing Containment leakage-rate Testing Per 10CFR50,App J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors, Option B ML20117H2621996-05-20020 May 1996 Proposed Tech Specs Sections 3/4.4.9.2,3/4.9.11.1,3/4.9.11.2 & Associated TS Bases 3/4.4.9 & 3/4.9.11 to More Clearly Described RHR Sys Shutdown Cooling Mode Operation ML20117D7801996-05-0303 May 1996 Proposed Tech Specs,Revising TS SRs to Change Surveillance Test Frequency for Performing Flow Testing of SGTS & RERS from Monthly to Quarterly ML20107M5141996-04-25025 April 1996 Proposed Tech Specs 3/4.3.7.7 Re Relocation of Traversing in-core Probe LCO ML20101L9211996-03-29029 March 1996 Proposed Tech Specs,Revising TS SR 4.5.1.d.2.b to Delete Requirement to Perform Functional Testing of ADS Valves as Part of start-up Testing Activities ML20095K5681995-12-22022 December 1995 Proposed Tech Specs Re Increase of Drywell & Suppression Chamber Purge Sys Operating Time Limit from 90 H Each 365 Days to 180 H Each 365 Days ML20094D2381995-10-27027 October 1995 Proposed TS Pages 1-6 & 1-7,revising Definitions 1.33, Reactor Enclosure Secondary Containment Integrity & 1.35, Refueling Floor Secondary Containment Integrity.' ML20093E5711995-10-10010 October 1995 Revised TS Page Re Primary Containment Isolation Valves ML20092J3961995-09-18018 September 1995 Proposed TS Table 4.3.1.1-1, RPS Instrumentation SRs & TS Bases 3/4.3.1,changing Calibr Frequency for LPRM Signal from Every 1,000 EFPH to Every 2,000 Megawatt Days Per Std Ton ML20092J3281995-09-14014 September 1995 Proposed Tech Specs,Removing Secondary Containment Isolation Valve Tables ML20087F9611995-08-10010 August 1995 Revised TS Pages 6-6 & 6-7 ML20087C9531995-08-0101 August 1995 Proposed Tech Specs in Order to Provide Alternate Actions to Allow Continuation of Core Alterations in Event Certain RMCS & Refueling Interlocks Are Inoperable ML20086S6131995-07-28028 July 1995 Proposed Tech Specs Reflecting Changes to Surveillance Test Frequency Requirements for Various RPS Instrumentation 1999-09-27
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217F1041999-10-14014 October 1999 Proposed Tech Specs Pages,Revising TS Sections 2.2 & 3.0/4.0,necessary to Support Mod P000224 Which Will Install New Power Range Neutron Monitoring Sys & Incorporate long- Term thermal-hydraulic Stability Solution Hardware ML20212H5681999-09-27027 September 1999 Proposed Tech Specs Pages,Revising TS to Clarify Several Administrative Requirements,Delete Redundant Requirements & Correct Typos ML20216J3471999-09-27027 September 1999 Corrected Tech Specs Page,Modifying Appearance of TS Page 3/4 4-8 as Typo Identified in Section 3.4.3.1 ML20196F5551999-06-22022 June 1999 Proposed Tech Specs Pages to Delete Surveillance Requirement 4.4.1.1.2 & Associated TS Administrative Controls Section 6.9.1.9.h,removing Recirculation Sys MG Set Stop ML20195H0651999-06-0909 June 1999 Revised Bases Pages B 3/4 10-2 & B 3/4 2-4 for LGS Units 1 & 2,in Order to Clarify That Requirements for Reactor Enclosure Secondary Containment Apply to Extended Area Encompassing Both Reactor Enclosure & Refueling Area ML20195E7611999-06-0707 June 1999 Proposed Tech Specs Table 3.6.3-1 & Associated Notations, Reflecting Permanently Deactivated Instrument Reference Leg Isolation Valve HV-61-102 ML20195G0481999-06-0707 June 1999 Proposed Tech Specs Section 3/4.4.3, RCS Leakage,Leakage Detection Systems, Clarifying Action Statement Re Inoperative Reactor Coolant Leakage Detection Systems ML20195B8431999-05-26026 May 1999 Proposed Tech Specs Section 4.1.3.5.b,removing & Relocating Control Rod Scram Accumulators Alarm Instrumentation to UFSAR & TS Section 3.1.3.5,allowing Alternate Method for Determining Whether Control Rod Drive Pump Is Operating ML20207L6591999-03-11011 March 1999 Proposed Tech Specs Section 2.1, Safety Limits, Revising MCPR Safety Limit ML20199G2021999-01-12012 January 1999 Proposed Tech Specs Section 3/4.4.2 & TS Bases Sections B 3/4.4.2,B 3/4.5.1 & B 3/4.5.2 to Increase Allowable as-found Main Steam SRV Code Safety Function Lift Setpoint Tolerance from +1% to +3% ML20199A7271999-01-0404 January 1999 Proposed Tech Specs Revising Administrative Section of TS Re Controlled Access to High Radiation Areas & Rept Dates for Annual Ore Rept & Annual Rer Rept ML20195J1651998-11-16016 November 1998 Rev D to LGS Emergency Preparedness NUMARC Eals ML20155H6401998-10-30030 October 1998 Proposed Tech Specs Pages Revising TS SRs 4.8.4.3.b.1, 4.8.4.3.b.2 & 4.8.4.3.b.3 in Order to Reflect Relay Setpoint Calculation Methodology ML20154Q8941998-10-15015 October 1998 Proposed Tech Specs Re Addition of Special Test Exception for IST & Hydrostatic Testing ML20154L3971998-10-13013 October 1998 Revised Tech Spec Bases Pages,Clarifying Thermal Overload Operation for Motor Operated Valves with Maintained Contact Control Switches ML20151Z4721998-09-14014 September 1998 Proposed Tech Specs Revising Table 4.4.6.1.3-1,re Withdrawal Schedule for Reactor Pressure Vessel Matl Surveillance Program Capsules ML20151V0951998-09-0404 September 1998 Proposed Tech Specs Ensuring Fidelity Between TS Pages & 970324 Submittal ML20236M1221998-07-0202 July 1998 Proposed Tech Specs Change Request 96-06-0,modifying FOL Page 8 ML20217K5291998-04-24024 April 1998 Proposed Tech Specs Page 6-18a Revising MCPR Safety Limit for Lgs,Unit 1,cycle 8 ML20202G7871998-02-0909 February 1998 Proposed TS Section 2.1, Safety Limits, Revising MCPR Safety Limit.Nonproprietary Supporting Info Encl ML20199G7771998-01-27027 January 1998 Proposed Tech Specs Pages,Removing Maximum Isolation Time for HPCI Turbine Exhaust Containment Isolation Valve HV-055-1(2)F072 from TS ML20198M7861998-01-12012 January 1998 Proposed Tech Specs Table 4.4.6.1.3-1 Re Surveillance Specimen Program Evaluation for Limerick Generating Station, Unit 1 ML20203H2501997-12-31031 December 1997 Rev 19 to Odcm ML20198N8061997-12-31031 December 1997 NPDES Permit PA-0052221 Study Plan for Fecal Coliform Bacteria in Pont Pleasant Water Diversion Sys During May- Sept 1998 ML20199H5971997-11-18018 November 1997 Proposed Tech Specs Re Affected Unit 1 FOL Page 8 ML20212D1851997-10-24024 October 1997 Proposed Tech Specs Revising Section 3/4.1.3.6 to Exempt Control Rod 50-27 from Coupling Test for Remainder for Cycle 7 at LGS Unit 1,provided Certain Conditions Are Met ML20211P9471997-10-15015 October 1997 Revised MSRV Tailpipe Temp Action Plan ML20216H1101997-09-0808 September 1997 Proposed Tech Specs,Supplementing Change Request 96-06-0 by Adding Three Addl TS Pages Containing Typos Discovered Since 970225 Submittal ML20210T9231997-09-0202 September 1997 Proposed Tech Specs,Revising TS Section 4.0.5 & Bases Sections B 4.0.5 & B 3/4.4.8 Re SRs Associated W/Isi & IST of ASME Code Class 1,2 & 3 Components ML20141K9461997-05-27027 May 1997 PECO Nuclear Limerick Generating Station Unit 2 Startup Test Rept Cycle 5 ML20203H2701997-04-30030 April 1997 Rev 18 to Odcm ML20138A2311997-04-21021 April 1997 Proposed Tech Specs,Providing New Pp B 3/4 8-2a to Accomodate Overflow of Text from TS Bases Pp B 3/4 8-2 ML20137X8101997-04-0909 April 1997 Proposed Tech Specs Re Battery Specific Gravity Changes ML20137G6751997-03-24024 March 1997 Proposed Tech Specs Deleting Drywell & Suppression Chamber Purge Sys Operational Time Limit & Add SR to Ensure Purge Sys Large Supply & Exhaust Valves Are Closed as Required ML20135D0961997-02-25025 February 1997 Proposed Tech Specs Changing Corporate Name from PA Electric Co to PECO Energy Co & Removing Obsolete Info & Correcting Typos ML20133L2141997-01-15015 January 1997 Proposed Tech Specs Pp 3/4 5-5 mark-up Rev for Unit 1 Revising TS by Eliminating in-situ Functional Testing of ADS Valves Requirement as Part of start-up Testing Activities ML20135F0961996-12-0606 December 1996 Proposed Tech Specs 2.1 Re Safety Limits ML20135A4491996-11-25025 November 1996 Proposed Tech Specs Change Request 96-22-0,revising TS SR 4.8.1.1.2.e.2 & Supporting TS Bases Section 3/4.8,to Clarify Requirements Associated W/Single Load Rejection Testing of EDGs ML20134L7571996-11-0505 November 1996 Proposed Tech Specs Revising Same Pp Contained in TS Change Request 95-14-0 Re Adoption of Performance Based 10CFR50, App J,Option B Testing ML20128N7761996-09-27027 September 1996 Proposed Tech Specs 3/4.6.5 Re Secondary Containment & 4.6.5.1.1 Re Surveillance Requirements ML20116L2701996-08-0808 August 1996 Proposed Tech Specs,Revising TS Sections 3/4.3.1,3/4.3.2, 3/4.3.3 & Associated TS Bases Sections 3/4.3.1 & 3/4.3.2 to Eliminate Selected Response Time Testing Requirements ML20116H6511996-08-0505 August 1996 Proposed Tech Specs Section 2.1, Safety Limits, to Revise Min Critical Power Ratio Safety Limit ML20116E6191996-08-0101 August 1996 Proposed Tech Specs 3/4.4.6 Re Addition of Two Hydroset Curves,Effective for 6.5 & 8.5 Efpy,To Existing Ptol Curves ML20113E0491996-06-28028 June 1996 Technical Basis & Description of Approach for Review Method Selection ML20115A9111996-06-28028 June 1996 Proposed Tech Specs,Performing Containment leakage-rate Testing Per 10CFR50,App J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors, Option B ML20117H2621996-05-20020 May 1996 Proposed Tech Specs Sections 3/4.4.9.2,3/4.9.11.1,3/4.9.11.2 & Associated TS Bases 3/4.4.9 & 3/4.9.11 to More Clearly Described RHR Sys Shutdown Cooling Mode Operation ML20112C1691996-05-17017 May 1996 Startup Rept Cycle 7 ML20117D7801996-05-0303 May 1996 Proposed Tech Specs,Revising TS SRs to Change Surveillance Test Frequency for Performing Flow Testing of SGTS & RERS from Monthly to Quarterly ML20107M5141996-04-25025 April 1996 Proposed Tech Specs 3/4.3.7.7 Re Relocation of Traversing in-core Probe LCO ML20101L9211996-03-29029 March 1996 Proposed Tech Specs,Revising TS SR 4.5.1.d.2.b to Delete Requirement to Perform Functional Testing of ADS Valves as Part of start-up Testing Activities 1999-09-27
[Table view] |
Text
, _ - . .-. - - . .
.l ,
d l
t i
ATTACHMENT 2 l LIMERICK GENERATING STATION UNIT 1 AND UNIT 2 i; Docket Nos. !
50-352 l' 50-353 i
Ucense Nos. l NPF-39 i NPF-85 i l
TECHNICAL SPECIFICATIONS CHANGE REQUEST NO. 94-26-0 ;
i t
AFFECTED PAGES !
-I f
UNIT 1 UNIT 2 .!
3/46-4 3/46-4 l 4
i
(
9407280249 940722 '
)
PDR ADOCK 05000352 p PDR ;
- - - - -- . . , _ _ _ __ . _ , _ . _ _ _ _ _ . - - , .)
CONTAINMENT SYSTEMS SURVEILLANCE RE0VIREMENTS (Continued)
- d. Type B and C tests shall be conducted with gas at P., 44.0 psig*, at -
a frequency in accordance with 10 CFR 50, Appendix J, as modified by approved exemptions, except for tests involving:
- 1. Air locks,
- 2. Main steam line isolation valves, ,
i
- 3. Containment isolation valves in hydrostatically tested lines which penetrate the primary containment, and
- e. Air locks shall be tested and demonstrated OPERABLE per Surveillance Requirement 4.6.1.3. ,
- f. Main steam line isolation valves shall be leak tested at a frequency J in accordance with 10 CFR 50, Appendix J, as modified by approved exemptions. ;
- g. Containment isolation valves in hydrostatically tested lines which ;
penetrate the primary containment shall be leak tested at least once i per 24 months, not to exceed the requirements of 10 CFR 50, Appendix J. ;
- h. The provisions of Specification 4.0.2 are not applicable to Specifica- i tions4.6.1.2a.,4.6.1.2b.,4.6.1.2c.,4.6.1.2d.,4.6.1.2e.,and4.6.1.2fl i
i
- Unless a hydrostatic test is required per Table 3.6.3-1.
f 6
LIMERICK - UNIT 1 3/4 6-4
l CONTAfNMENT SYSTEMS
. i SURVEILLANCE RE0VIREMENTS-(Continued)
.d. Type B and C tests shall be conducted with gas at P , 44.0 psig*, at -
a frequency in accordance with 10 CFR 50, Appendix J, as modified by :
j approved exemptions, except for tests involving: ;
- 1. Air locks,
- 2. Main steam line isolation valves, ;
- 3. Containment isolation valves in hydrostatically tested lines !
i which penetrate the primary containment, and
- e. Air locks shall be tested and demonstrated OPERABLE per Surveillance ;
Requirement 4.6.1.3. l
- f. Main steam line isolation valves shall be leak tested at a frequency I in accordance with 10 CFR 50, Appendix J, as modified by approved l exemptions.
- g. Containment isolation valves in hydrostatically tested lines which [
penetrate the primary containment shall be leak tested at least once l per 24 months, not to exceed the requirements of 10CFR50, Appendix J.
I
- h. The provisions of Specification 4.0.2 are not applicable to Specifica-ti ons 4. 6.1.2a. , 4. 6.1. 2b. , 4. 6.1. 2c . , 4. 6.1.2d . , 4. 6.1.2e. , and 4. 6.1.2 f. ,
i i
r i
?
1
- Unless -a hydrostatic test is required per Table 3.6.3-1.
l.IMERICK - UNIT 2 3/4 6-4 i
i
ATTACHMENT 3 LIMERICK GENERATING STATION UNIT 1 AND UNIT 2 Docket Nos.
50-352 50-353 License Nos.
NPF-39 NPF-85 TECHNICAL SPECIFICATIONS CHANGE REQUEST NO. 94 26-0 AND EXEMPTION SPECIFIED UNIT 2 LOCAL LEAK RATE TEST TABLES
PAGE 1 TABLE 1 2R03 Surveillance Tests - Expire on/before 01-28-95 TEST # PEN.# PENETRATION DESCRIPTION EXPIRATION DATE ST-4-LLR-805-2 X-4 Head Access Manhole 01-24-95 ST-4-LLR-011-2 X-3B PCIG Supply Header 'B' 01-27-95 ST-4-LLR-021-2 X-3D PCIG Supply to ADS Valves E&K 01-26-95 ST-4 LLR-041-2 X-7B Main Steam Line 'B' 01-24-95 ST-4-LLR-092-2 X-9B Feedwater 01-28-95 ST-4 LLR-191-2 X-21 Service Air System 01-25-95 ST-4-LLR-201-2 X-23 RECW Supply 01-28-95 ST-4-LLR-222-2 X-25 Drywell Purge Supply 01-27-95 ST-4-LLR-281-2 X-35B instrument Gas to Tip Indexing Mech. 01-27-95 ST-4-LLR-291-2 X-35C Tip Drives 01-28-95 ST-4-LLR-311-2 X-35E Tip Drives 01-28-95 ST-4-LLR-321-2 X-35F Tip Drives 01-28-95 ST-4-LLR-331-2 X-35G Tip Drives 01-28-95 ST-4-LLR-391-2 X-40F instrument Gas Suction 01-28-95 ST-4-LLR-411-2 X-40H Instrument Gas Supply 01-27-95 ST-4-LLR-431-2 X-43B Main Steam Sample 01-25-95 ST-4-LLR-491-2 X-53 D/W Chilled Water Supply 01-26-95 ST-4-LLR-501-2 X-54 ,
D/W Chilled Water Return 01-26-95 ST-4-LLR-531-2 X-61 A Recirc Pump A Seal Purge 01-24-95 ST-4-LLR 761-2 X-212 HPCI Pump Test Flush 01-26-95 ST-4-LLR-811-2 X-218 Inst Gas to Vac Relief Valves 01-27-95 ST-4-LLR-891 2 X-228D HPCI Vac Relief 01-27-95
PAGE 2 TABLE 2 2R03 Surveillance Tests - Expiration after 01/28/95 and on/before 02/04/95 TEST # PEN.# PENETRATION DESCRIPTION EXPIRATION DATE ST-4-LLR B12-2 X-26 Viv O-rings /pkg -D/W Purge Exhaust 02-03-95 ST-4-LLR-B22-2 X-26 Test Connection 02-03-95 ST-4-LLR-003-2 X202,X-26 'A' Hydrogen Recombiner 02-03-95 ST-4-LLR-004-2 X-201 A,X-25 'B' Hydrogen Recombiner 02-03-95 ST-4-LLR-071-2 X-8 Main Steam Line Drain 02-03-95 ST-4 LLR-084-2 X-9A Feedwater 01-30 ST-4-LLR-161-2 X-16A CS Injection 02-03-95 ST-4-LLR 211-2 X 24 RECW Return 01-29-95 ;
ST-4-LLR 241-2 X-27A Instrument Gas Supply 01-29-95 ST-4-LLR-371-2 X-39A Drywell Spray 02-02-95 ST-4-LLR-451-2 X-45A LPCI Injection 02-02-95 ST-4-LLR-471-2 X-45C LPCI Injection 02-01-95 ST-4 LLR 541-2 X-62/X-220A H2 /0 2Sample Return 02-04 95 i ST-4-LLR 561-2 X-117B D/W Rad Monitor Supply & Return 02-03-95 I
ST-4-LLR 572-2 X-201 A,X-25 S/P Purge Supply 02-03-95 ST-4-LLR-581-2 X-202 S/P Purge Exhaust 02-03-95 .
ST-4-LLR 591-2 X-203A RHR Pump 'A' Suction 01-31-95 ,
ST-4-LLR-611-2 X-203C RHR Pump 'C' Suction 01-31-95 ST-4-LLR-631-2 X 204A RHR Pump Test Line 01-31-95 ST-4-LLR-651-2 X-205A RHR S/P Spray 02-02-95 l ST-4-LLR-771-2 X-214 RCIC Pump Suction 02-03-95 ST-4-LLR-801-2 X-217 RCIC Vacuum Pump Discharge 02-02-95 ST-4-LLR 971-2 X-239 'A' RHR Heat Exch Shell Vent 02-01-95
l
. l PAGE 3 TABLE 3 2R03 Surveillance Tests - Expiration after 02/04/95 and on/before 02/11/95 TEST # PEN.# PENETRATION DESCRIPTION EXPIRATION DATE ST-4-LLR-231-2 X-26 D/W Purge Exhaust 02-06-95 ST-4-LLR-232-2 X-26 D/W Purge Exhaust 02-05-95 ST-4-LLR-262-2 X-28A D/W H2 0, 02-06-95 ST-4-LLR-271-2 X-28B D/W H2 0, 02-06-95 ST-4 LLR-401-2 X-40G ILRT Data Acquisition 02-05-95 ST-4-LLR-421-2 X-42/116 SLC 02-11-95 ST-4-LLR-441-2 X-44 RWCU Alt. Return 02-10-95 ST-4-LLR-511-2 X-55 D/W Chilled Water Supply 02-09-95 ST-4 LLR-521-2 X-56 D/W Chilled Water Return 02-09-95 ST-4-LLR-532-2 X-61B Recirc Pump B Seal Purge 02-10-95 ST-4-LLR-571-2 X-201A S/P Purge Supply 02-09-95 ST-4-LLR-831-2 X-221 A Wetwell H2 /O, Sample 02-09-95 ST-4-LLR-841-2 X-221B Wetwell H2 /O, Sample 02-10-95 ST-4-LLR-881-2 X-227 ILRT Data Acquisition 02-05-95 ST-4-LLR-901-2 X-231A D/W Sump Drains 02-05-95 ST-4-LLR-981-2 X-240 RHR to RCIC Vent to S/P 02-09-95 i
l
i I
PAGE 4 TABLE 4 2R03 Surveillance Tests - Expire after 2/11/95 and on/before 02/18/95 I
TEST # PEN.# PENETRATION DESCRIPTION EXPlRATION '
DATE ST-4-LLR-031-2 X-7A Main Steam Une 'A' 02-13-95 ST-4-LLR-051-2 X-7C Main Steam Une 'C' 02-13-95 _
ST-4-LLR-061-2 X-7D Main Steam Une 'D' 02-14-95 ST-4-LLR-101-2 X-10 Steam Supply RCIC Turbine 02-13-95 ST-4-LLR-110-2 X-11 Steam Supply HPCI Turbine 02-18-95 ST-4-LLR-131-2 X-13A 'A' RHR Shut-Down Cooling 02-12-95 ST-4-LLR-361-2 X-38A-D CRD Withdrawal 02-18-95 r
1 5
i l
l l
i