Proposed Tech Specs,Reflecting Removal of Surveillance Frequency Details Governing 10CFR50,App J 'B' & 'C' Type Testing
ML20071J540
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 07/22/1994
From:
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20071J538 List:
References
NUDOCS 9407280248
Download: ML20071J540 (8)


Text

, _ - . .-. - - . .

.l ,

d l

t i

ATTACHMENT 2 l LIMERICK GENERATING STATION UNIT 1 AND UNIT 2 i; Docket Nos.  !

50-352 l' 50-353 i

Ucense Nos. l NPF-39 i NPF-85 i l

TECHNICAL SPECIFICATIONS CHANGE REQUEST NO. 94-26-0  ;

i t

AFFECTED PAGES  !

-I f

UNIT 1 UNIT 2 .!

3/46-4 3/46-4 l 4

i

(

9407280249 940722 '

)

PDR ADOCK 05000352 p PDR  ;

- - - - -- . . , _ _ _ __ . _ , _ . _ _ _ _ _ . - - , .)

CONTAINMENT SYSTEMS SURVEILLANCE RE0VIREMENTS (Continued)

d. Type B and C tests shall be conducted with gas at P., 44.0 psig*, at -

a frequency in accordance with 10 CFR 50, Appendix J, as modified by approved exemptions, except for tests involving:

1. Air locks,
2. Main steam line isolation valves, ,

i

3. Containment isolation valves in hydrostatically tested lines which penetrate the primary containment, and
e. Air locks shall be tested and demonstrated OPERABLE per Surveillance Requirement 4.6.1.3. ,
f. Main steam line isolation valves shall be leak tested at a frequency J in accordance with 10 CFR 50, Appendix J, as modified by approved exemptions.  ;
g. Containment isolation valves in hydrostatically tested lines which  ;

penetrate the primary containment shall be leak tested at least once i per 24 months, not to exceed the requirements of 10 CFR 50, Appendix J.  ;

h. The provisions of Specification 4.0.2 are not applicable to Specifica- i tions4.6.1.2a.,4.6.1.2b.,4.6.1.2c.,4.6.1.2d.,4.6.1.2e.,and4.6.1.2fl i

i

  • Unless a hydrostatic test is required per Table 3.6.3-1.

f 6

LIMERICK - UNIT 1 3/4 6-4

l CONTAfNMENT SYSTEMS

. i SURVEILLANCE RE0VIREMENTS-(Continued)

.d. Type B and C tests shall be conducted with gas at P , 44.0 psig*, at -

a frequency in accordance with 10 CFR 50, Appendix J, as modified by  :

j approved exemptions, except for tests involving:  ;

1. Air locks,
2. Main steam line isolation valves,  ;
3. Containment isolation valves in hydrostatically tested lines  !

i which penetrate the primary containment, and

e. Air locks shall be tested and demonstrated OPERABLE per Surveillance  ;

Requirement 4.6.1.3. l

f. Main steam line isolation valves shall be leak tested at a frequency I in accordance with 10 CFR 50, Appendix J, as modified by approved l exemptions.
g. Containment isolation valves in hydrostatically tested lines which [

penetrate the primary containment shall be leak tested at least once l per 24 months, not to exceed the requirements of 10CFR50, Appendix J.

I

h. The provisions of Specification 4.0.2 are not applicable to Specifica-ti ons 4. 6.1.2a. , 4. 6.1. 2b. , 4. 6.1. 2c . , 4. 6.1.2d . , 4. 6.1.2e. , and 4. 6.1.2 f. ,

i i

r i

?

1

  • Unless -a hydrostatic test is required per Table 3.6.3-1.

l.IMERICK - UNIT 2 3/4 6-4 i

i

ATTACHMENT 3 LIMERICK GENERATING STATION UNIT 1 AND UNIT 2 Docket Nos.

50-352 50-353 License Nos.

NPF-39 NPF-85 TECHNICAL SPECIFICATIONS CHANGE REQUEST NO. 94 26-0 AND EXEMPTION SPECIFIED UNIT 2 LOCAL LEAK RATE TEST TABLES

PAGE 1 TABLE 1 2R03 Surveillance Tests - Expire on/before 01-28-95 TEST # PEN.# PENETRATION DESCRIPTION EXPIRATION DATE ST-4-LLR-805-2 X-4 Head Access Manhole 01-24-95 ST-4-LLR-011-2 X-3B PCIG Supply Header 'B' 01-27-95 ST-4-LLR-021-2 X-3D PCIG Supply to ADS Valves E&K 01-26-95 ST-4 LLR-041-2 X-7B Main Steam Line 'B' 01-24-95 ST-4-LLR-092-2 X-9B Feedwater 01-28-95 ST-4 LLR-191-2 X-21 Service Air System 01-25-95 ST-4-LLR-201-2 X-23 RECW Supply 01-28-95 ST-4-LLR-222-2 X-25 Drywell Purge Supply 01-27-95 ST-4-LLR-281-2 X-35B instrument Gas to Tip Indexing Mech. 01-27-95 ST-4-LLR-291-2 X-35C Tip Drives 01-28-95 ST-4-LLR-311-2 X-35E Tip Drives 01-28-95 ST-4-LLR-321-2 X-35F Tip Drives 01-28-95 ST-4-LLR-331-2 X-35G Tip Drives 01-28-95 ST-4-LLR-391-2 X-40F instrument Gas Suction 01-28-95 ST-4-LLR-411-2 X-40H Instrument Gas Supply 01-27-95 ST-4-LLR-431-2 X-43B Main Steam Sample 01-25-95 ST-4-LLR-491-2 X-53 D/W Chilled Water Supply 01-26-95 ST-4-LLR-501-2 X-54 ,

D/W Chilled Water Return 01-26-95 ST-4-LLR-531-2 X-61 A Recirc Pump A Seal Purge 01-24-95 ST-4-LLR 761-2 X-212 HPCI Pump Test Flush 01-26-95 ST-4-LLR-811-2 X-218 Inst Gas to Vac Relief Valves 01-27-95 ST-4-LLR-891 2 X-228D HPCI Vac Relief 01-27-95

PAGE 2 TABLE 2 2R03 Surveillance Tests - Expiration after 01/28/95 and on/before 02/04/95 TEST # PEN.# PENETRATION DESCRIPTION EXPIRATION DATE ST-4-LLR B12-2 X-26 Viv O-rings /pkg -D/W Purge Exhaust 02-03-95 ST-4-LLR-B22-2 X-26 Test Connection 02-03-95 ST-4-LLR-003-2 X202,X-26 'A' Hydrogen Recombiner 02-03-95 ST-4-LLR-004-2 X-201 A,X-25 'B' Hydrogen Recombiner 02-03-95 ST-4-LLR-071-2 X-8 Main Steam Line Drain 02-03-95 ST-4 LLR-084-2 X-9A Feedwater 01-30 ST-4-LLR-161-2 X-16A CS Injection 02-03-95 ST-4-LLR 211-2 X 24 RECW Return 01-29-95  ;

ST-4-LLR 241-2 X-27A Instrument Gas Supply 01-29-95 ST-4-LLR-371-2 X-39A Drywell Spray 02-02-95 ST-4-LLR-451-2 X-45A LPCI Injection 02-02-95 ST-4-LLR-471-2 X-45C LPCI Injection 02-01-95 ST-4 LLR 541-2 X-62/X-220A H2 /0 2Sample Return 02-04 95 i ST-4-LLR 561-2 X-117B D/W Rad Monitor Supply & Return 02-03-95 I

ST-4-LLR 572-2 X-201 A,X-25 S/P Purge Supply 02-03-95 ST-4-LLR-581-2 X-202 S/P Purge Exhaust 02-03-95 .

ST-4-LLR 591-2 X-203A RHR Pump 'A' Suction 01-31-95 ,

ST-4-LLR-611-2 X-203C RHR Pump 'C' Suction 01-31-95 ST-4-LLR-631-2 X 204A RHR Pump Test Line 01-31-95 ST-4-LLR-651-2 X-205A RHR S/P Spray 02-02-95 l ST-4-LLR-771-2 X-214 RCIC Pump Suction 02-03-95 ST-4-LLR-801-2 X-217 RCIC Vacuum Pump Discharge 02-02-95 ST-4-LLR 971-2 X-239 'A' RHR Heat Exch Shell Vent 02-01-95

l

. l PAGE 3 TABLE 3 2R03 Surveillance Tests - Expiration after 02/04/95 and on/before 02/11/95 TEST # PEN.# PENETRATION DESCRIPTION EXPIRATION DATE ST-4-LLR-231-2 X-26 D/W Purge Exhaust 02-06-95 ST-4-LLR-232-2 X-26 D/W Purge Exhaust 02-05-95 ST-4-LLR-262-2 X-28A D/W H2 0, 02-06-95 ST-4-LLR-271-2 X-28B D/W H2 0, 02-06-95 ST-4 LLR-401-2 X-40G ILRT Data Acquisition 02-05-95 ST-4-LLR-421-2 X-42/116 SLC 02-11-95 ST-4-LLR-441-2 X-44 RWCU Alt. Return 02-10-95 ST-4-LLR-511-2 X-55 D/W Chilled Water Supply 02-09-95 ST-4 LLR-521-2 X-56 D/W Chilled Water Return 02-09-95 ST-4-LLR-532-2 X-61B Recirc Pump B Seal Purge 02-10-95 ST-4-LLR-571-2 X-201A S/P Purge Supply 02-09-95 ST-4-LLR-831-2 X-221 A Wetwell H2 /O, Sample 02-09-95 ST-4-LLR-841-2 X-221B Wetwell H2 /O, Sample 02-10-95 ST-4-LLR-881-2 X-227 ILRT Data Acquisition 02-05-95 ST-4-LLR-901-2 X-231A D/W Sump Drains 02-05-95 ST-4-LLR-981-2 X-240 RHR to RCIC Vent to S/P 02-09-95 i

l

i I

PAGE 4 TABLE 4 2R03 Surveillance Tests - Expire after 2/11/95 and on/before 02/18/95 I

TEST # PEN.# PENETRATION DESCRIPTION EXPlRATION '

DATE ST-4-LLR-031-2 X-7A Main Steam Une 'A' 02-13-95 ST-4-LLR-051-2 X-7C Main Steam Une 'C' 02-13-95 _

ST-4-LLR-061-2 X-7D Main Steam Une 'D' 02-14-95 ST-4-LLR-101-2 X-10 Steam Supply RCIC Turbine 02-13-95 ST-4-LLR-110-2 X-11 Steam Supply HPCI Turbine 02-18-95 ST-4-LLR-131-2 X-13A 'A' RHR Shut-Down Cooling 02-12-95 ST-4-LLR-361-2 X-38A-D CRD Withdrawal 02-18-95 r

1 5

i l