ML20071J540

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs,Reflecting Removal of Surveillance Frequency Details Governing 10CFR50,App J B & C Type Testing
ML20071J540
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 07/22/1994
From:
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20071J538 List:
References
NUDOCS 9407280248
Download: ML20071J540 (8)


Text

,

.l d

l t

i l

ATTACHMENT 2 LIMERICK GENERATING STATION UNIT 1 AND UNIT 2 i

Docket Nos.

50-352 l

50-353 i

Ucense Nos.

l NPF-39 i

NPF-85 i

l TECHNICAL SPECIFICATIONS CHANGE REQUEST NO. 94-26-0 i

t AFFECTED PAGES

-I f

UNIT 1 UNIT 2 3/46-4 3/46-4 l

4 i

(

9407280249 940722

)

PDR ADOCK 05000352 p

PDR

.)

CONTAINMENT SYSTEMS SURVEILLANCE RE0VIREMENTS (Continued) d.

Type B and C tests shall be conducted with gas at P., 44.0 psig*, at a frequency in accordance with 10 CFR 50, Appendix J, as modified by approved exemptions, except for tests involving:

1.

Air locks, 2.

Main steam line isolation valves, i

3.

Containment isolation valves in hydrostatically tested lines which penetrate the primary containment, and Air locks shall be tested and demonstrated OPERABLE per Surveillance e.

Requirement 4.6.1.3.

f.

Main steam line isolation valves shall be leak tested at a frequency J

in accordance with 10 CFR 50, Appendix J, as modified by approved exemptions.

Containment isolation valves in hydrostatically tested lines which g.

penetrate the primary containment shall be leak tested at least once i

per 24 months, not to exceed the requirements of 10 CFR 50, Appendix J.

The provisions of Specification 4.0.2 are not applicable to Specifica-i h.

tions4.6.1.2a.,4.6.1.2b.,4.6.1.2c.,4.6.1.2d.,4.6.1.2e.,and4.6.1.2fl i

i

  • Unless a hydrostatic test is required per Table 3.6.3-1.

f 6

LIMERICK - UNIT 1 3/4 6-4

CONTAfNMENT SYSTEMS i

SURVEILLANCE RE0VIREMENTS-(Continued)

.d.

Type B and C tests shall be conducted with gas at P, 44.0 psig*, at a frequency in accordance with 10 CFR 50, Appendix J, as modified by approved exemptions, except for tests involving:

j 1.

Air locks, 2.

Main steam line isolation valves, 3.

Containment isolation valves in hydrostatically tested lines i

which penetrate the primary containment, and Air locks shall be tested and demonstrated OPERABLE per Surveillance e.

Requirement 4.6.1.3.

l f.

Main steam line isolation valves shall be leak tested at a frequency I

in accordance with 10 CFR 50, Appendix J, as modified by approved l

exemptions.

g.

Containment isolation valves in hydrostatically tested lines which

[

penetrate the primary containment shall be leak tested at least once l

per 24 months, not to exceed the requirements of 10CFR50, Appendix J.

I h.

The provisions of Specification 4.0.2 are not applicable to Specifica-ti ons 4. 6.1.2a., 4. 6.1. 2b., 4. 6.1. 2c., 4. 6.1.2d., 4. 6.1.2e., and 4. 6.1.2 f.

i i

r i

?

1

  • Unless -a hydrostatic test is required per Table 3.6.3-1.

l.IMERICK - UNIT 2 3/4 6-4 i

i

ATTACHMENT 3 LIMERICK GENERATING STATION UNIT 1 AND UNIT 2 Docket Nos.

50-352 50-353 License Nos.

NPF-39 NPF-85 TECHNICAL SPECIFICATIONS CHANGE REQUEST NO. 94 26-0 AND EXEMPTION SPECIFIED UNIT 2 LOCAL LEAK RATE TEST TABLES

PAGE 1 TABLE 1 2R03 Surveillance Tests - Expire on/before 01-28-95 TEST #

PEN.#

PENETRATION DESCRIPTION EXPIRATION DATE ST-4-LLR-805-2 X-4 Head Access Manhole 01-24-95 ST-4-LLR-011-2 X-3B PCIG Supply Header

'B' 01-27-95 ST-4-LLR-021-2 X-3D PCIG Supply to ADS Valves E&K 01-26-95 ST-4 LLR-041-2 X-7B Main Steam Line 'B' 01-24-95 ST-4-LLR-092-2 X-9B Feedwater 01-28-95 ST-4 LLR-191-2 X-21 Service Air System 01-25-95 ST-4-LLR-201-2 X-23 RECW Supply 01-28-95 ST-4-LLR-222-2 X-25 Drywell Purge Supply 01-27-95 ST-4-LLR-281-2 X-35B instrument Gas to Tip Indexing Mech.

01-27-95 ST-4-LLR-291-2 X-35C Tip Drives 01-28-95 ST-4-LLR-311-2 X-35E Tip Drives 01-28-95 ST-4-LLR-321-2 X-35F Tip Drives 01-28-95 ST-4-LLR-331-2 X-35G Tip Drives 01-28-95 ST-4-LLR-391-2 X-40F instrument Gas Suction 01-28-95 ST-4-LLR-411-2 X-40H Instrument Gas Supply 01-27-95 ST-4-LLR-431-2 X-43B Main Steam Sample 01-25-95 ST-4-LLR-491-2 X-53 D/W Chilled Water Supply 01-26-95 ST-4-LLR-501-2 X-54 D/W Chilled Water Return 01-26-95 ST-4-LLR-531-2 X-61 A Recirc Pump A Seal Purge 01-24-95 ST-4-LLR 761-2 X-212 HPCI Pump Test Flush 01-26-95 ST-4-LLR-811-2 X-218 Inst Gas to Vac Relief Valves 01-27-95 ST-4-LLR-891 2 X-228D HPCI Vac Relief 01-27-95

PAGE 2 TABLE 2 2R03 Surveillance Tests - Expiration after 01/28/95 and on/before 02/04/95 TEST #

PEN.#

PENETRATION DESCRIPTION EXPIRATION DATE ST-4-LLR B12-2 X-26 Viv O-rings /pkg -D/W Purge Exhaust 02-03-95 ST-4-LLR-B22-2 X-26 Test Connection 02-03-95 ST-4-LLR-003-2 X202,X-26

'A' Hydrogen Recombiner 02-03-95 ST-4-LLR-004-2 X-201 A,X-25

'B' Hydrogen Recombiner 02-03-95 ST-4-LLR-071-2 X-8 Main Steam Line Drain 02-03-95 ST-4 LLR-084-2 X-9A Feedwater 01-30 ST-4-LLR-161-2 X-16A CS Injection 02-03-95 ST-4-LLR 211-2 X 24 RECW Return 01-29-95 ST-4-LLR 241-2 X-27A Instrument Gas Supply 01-29-95 ST-4-LLR-371-2 X-39A Drywell Spray 02-02-95 ST-4-LLR-451-2 X-45A LPCI Injection 02-02-95 ST-4-LLR-471-2 X-45C LPCI Injection 02-01-95 ST-4 LLR 541-2 X-62/X-220A H /0 Sample Return 02-04 95 i

2 2

ST-4-LLR 561-2 X-117B D/W Rad Monitor Supply & Return 02-03-95 I

ST-4-LLR 572-2 X-201 A,X-25 S/P Purge Supply 02-03-95 ST-4-LLR-581-2 X-202 S/P Purge Exhaust 02-03-95 ST-4-LLR 591-2 X-203A RHR Pump 'A' Suction 01-31-95 ST-4-LLR-611-2 X-203C RHR Pump 'C' Suction 01-31-95 ST-4-LLR-631-2 X 204A RHR Pump Test Line 01-31-95 ST-4-LLR-651-2 X-205A RHR S/P Spray 02-02-95 l

ST-4-LLR-771-2 X-214 RCIC Pump Suction 02-03-95 ST-4-LLR-801-2 X-217 RCIC Vacuum Pump Discharge 02-02-95 ST-4-LLR 971-2 X-239

'A' RHR Heat Exch Shell Vent 02-01-95

PAGE 3 TABLE 3 2R03 Surveillance Tests - Expiration after 02/04/95 and on/before 02/11/95 TEST #

PEN.#

PENETRATION DESCRIPTION EXPIRATION DATE ST-4-LLR-231-2 X-26 D/W Purge Exhaust 02-06-95 ST-4-LLR-232-2 X-26 D/W Purge Exhaust 02-05-95 ST-4-LLR-262-2 X-28A D/W H 0, 02-06-95 2

ST-4-LLR-271-2 X-28B D/W H 0, 02-06-95 2

ST-4 LLR-401-2 X-40G ILRT Data Acquisition 02-05-95 ST-4-LLR-421-2 X-42/116 SLC 02-11-95 ST-4-LLR-441-2 X-44 RWCU Alt. Return 02-10-95 ST-4-LLR-511-2 X-55 D/W Chilled Water Supply 02-09-95 ST-4 LLR-521-2 X-56 D/W Chilled Water Return 02-09-95 ST-4-LLR-532-2 X-61B Recirc Pump B Seal Purge 02-10-95 ST-4-LLR-571-2 X-201A S/P Purge Supply 02-09-95 ST-4-LLR-831-2 X-221 A Wetwell H /O, Sample 02-09-95 2

ST-4-LLR-841-2 X-221B Wetwell H /O, Sample 02-10-95 2

ST-4-LLR-881-2 X-227 ILRT Data Acquisition 02-05-95 ST-4-LLR-901-2 X-231A D/W Sump Drains 02-05-95 ST-4-LLR-981-2 X-240 RHR to RCIC Vent to S/P 02-09-95 i

l

I PAGE 4 TABLE 4 2R03 Surveillance Tests - Expire after 2/11/95 and on/before 02/18/95 TEST #

PEN.#

PENETRATION DESCRIPTION EXPlRATION DATE ST-4-LLR-031-2 X-7A Main Steam Une 'A' 02-13-95 ST-4-LLR-051-2 X-7C Main Steam Une 'C' 02-13-95 ST-4-LLR-061-2 X-7D Main Steam Une 'D' 02-14-95 ST-4-LLR-101-2 X-10 Steam Supply RCIC Turbine 02-13-95 ST-4-LLR-110-2 X-11 Steam Supply HPCI Turbine 02-18-95 ST-4-LLR-131-2 X-13A

'A' RHR Shut-Down Cooling 02-12-95 ST-4-LLR-361-2 X-38A-D CRD Withdrawal 02-18-95 r

1 5

i