ML20071H796

From kanterella
Jump to navigation Jump to search
Ro:On 820123,reactor Feed Pump (RFP) B Tripped During Weekly Surveillance Test While RFP a Isolated for Maint. Reactor Vessel Level Decreased Causing Reactor Scram & Isolation.Hpci Auto Initiated & Injected Into Reactor
ML20071H796
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 02/16/1982
From: Manry M
GEORGIA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
PM-82-11, NUDOCS 8203080540
Download: ML20071H796 (2)


Text

-

Georgia Power Company Post Othce Box 442

. O Baxley, Georgia 31513 Telephonc 912 367-7781 912 537-9444 jlIE C E T il ' ii L

Edwin I. Hatch Nuclear Plant Georgia Power C2 FEa 25 Pl: 5t ~ ~~~" ewrave,"

  • o>

c '

February 16, 1982 O PM-82-111 i nECEiVED ,

4 \

g tal\R 051982>

PLANT E. I. HATCH "NkcNI$u"

/p Special Report q Docket No. 50-366 .e Co td United States Nuclear Regulatory Commission Office of Inspection and Enforcement Region II Suite 3100 101 Marietta Street Atlanta, Georgia 30303 ATTENTION: Mr. James P. O'Reilly Pursuant to Section 6.9.2 and 3.5.1 action: c. of Hatch Unit 2 Technical Specifications, please find attached Special Report.

th

/1 M. Manry Plant Manager MM/SXB/bje xc: G. F. Head J. T. Beckham, Jr.

T. V. Greene C. T. Jones S. X. Baxley Control Room File M-58 Document Control l

  • <-}'{,yI f,QOPk 8203080540 820216 yDRADOCK 05000366 /

PDR Ul l l

L.

. .o Special Report Georgia Power Company Plant E. I. Hatch Docket No. 50-366 HPCI INJECTION INTO REACTOR On 1-23-82 at 20:41, reactor feed pump (RFP) "B" tripped while per-forming the weekly RFP surveilance test. RFP "A" was isolated for maintenance. Reactor vessel level decreased causing a reactor scram and isolation. HPCI auto. initiated and injected into the reactor to restore and maintain level.

As of the date of this report, there have been twenty-two (22) incidents with HPCI injections into the reactor vessel.

l