ML20071H796
| ML20071H796 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 02/16/1982 |
| From: | Manry M GEORGIA POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| PM-82-11, NUDOCS 8203080540 | |
| Download: ML20071H796 (2) | |
Text
-
Georgia Power Company Post Othce Box 442 O
Baxley, Georgia 31513 Telephonc 912 367-7781 912 537-9444 jlIE C E T il ' ii L
Georgia Power Edwin I. Hatch Nuclear Plant C2 FEa 25 Pl: 5t
~ ~~~" ewrave,"
o>
c February 16, 1982 O
nECEiVED
\\
tal\\R 051982> 4 g
PLANT E. I. HATCH "NkcNI$u
/p Special Report q
Docket No. 50-366
.e Co td United States Nuclear Regulatory Commission Office of Inspection and Enforcement Region II Suite 3100 101 Marietta Street Atlanta, Georgia 30303 ATTENTION:
Mr. James P. O'Reilly Pursuant to Section 6.9.2 and 3.5.1 action: c. of Hatch Unit 2 Technical Specifications, please find attached Special Report.
th
/1 M. Manry Plant Manager MM/SXB/bje xc:
G. F. Head J. T. Beckham, Jr.
T. V. Greene C. T. Jones S. X. Baxley Control Room File M-58 Document Control l
- <-}'{,yI,QOPk f
8203080540 820216 yDRADOCK 05000366
/
PDR Ul l l
L.
.o Special Report Georgia Power Company Plant E. I. Hatch Docket No. 50-366 HPCI INJECTION INTO REACTOR On 1-23-82 at 20:41, reactor feed pump (RFP) "B" tripped while per-forming the weekly RFP surveilance test.
RFP "A" was isolated for maintenance. Reactor vessel level decreased causing a reactor scram and isolation. HPCI auto. initiated and injected into the reactor to restore and maintain level.
As of the date of this report, there have been twenty-two (22) incidents with HPCI injections into the reactor vessel.