ML20071H535
| ML20071H535 | |
| Person / Time | |
|---|---|
| Site: | Bellefonte |
| Issue date: | 02/19/1982 |
| From: | Mills L TENNESSEE VALLEY AUTHORITY |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, NUDOCS 8203080449 | |
| Download: ML20071H535 (2) | |
Text
TENNESSEE VALLEY AUTHORITY CH ATT ANOOG A. TE N N ESSE E 37401 400 Chestnut Street Tower II February 19,1932 3 <g-3m A f g
RECElyED U.S. Nuclear Regulatory Commission i
Region II
'iig g,$ 7gg2h gy Attn:
Mr. James P. O'Reilly, Regional Administrator
,D gg.,.,,iN6fy f4
\\
sa 101 Marietta Street, Suite 3100
,;A
'~;
Atlanta, Georgia 30303
Dear Mr. O'Reilly:
/
g BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - NAMEPLATES ON WESTINGHOUSE MOTORS
- NCR 1191 - FINAL REPORT The subject nonconformance was initially reported to NRC-0IE Inspector B. Cochran on July 9, 1980 in accordance with 10 CFR 50.55(e). This was followed by our interim reports dated August 8 and October 22, 1980 and January 9, April 27, August 18, November 5, and November 20, 1981. As discussed with R. V. Crlenjak by telephone on February 3, 1982. this response was delayed. Enclosed is our final report.
If you have any questions concerning this matter, please get in touch with R. H. Shell at FTS 858-2688.
Very truly yours, TENNESSEE VALLEY AUTHORITY Sk /A L AM W L. M. Mil Manager
~
Nuclear Re lation and a ety Enclosure cc:
Mr. Richard C. EeYoung, Direntor (Enclosure)
Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 F203090449 820219
,y g,ytc1 AL ggi, j
S
==='= b bl An Equal Oppor tunity Employer
)>
ENCLOSURE BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 NAMEPLATES ON WESTINGHOUSE MOTORS NCR 1191 10 CFR 50.55(e)
FINAL REPORT Description of Deficiency Nameplate data on Westinghouse motors for Auxiliary Building air handling unita (AHU), furnished under contract 76K38-86925-1 by the Trane Company gives the service factors as 1.0.
TVA's specification requires a service factor of 1.15.
TVA's research into the problem indicates that no documentation exists in TVA files in the form of test reports or certifications from the vendor te substantiate that the motors have a 1.15 service factor as required by contract. TVA has therefore assumed that the motor manufacturer's nameplate data is correct and the motors have a service factor of 1.0.
Moreover, TVA has found that these motors are among 62 Class IE motors for which TVA lacks environmental qualification documentation. The motors require nuclear grade qualifications per IEEE 334-1974 and in accordance with the environmental parameters in the contract.
Safety Implication The incorrect information on the nameplate could not, in itself, affect the motors as the motors were provided with a service factor of 1.15.
- Also, the environmental qualification of this equipment has been provided.
Therefore, the safe operation of the plant was not affected by this deficiency.
Corrective Action TVA has received documentation from the Trane Company which certifies that the mo, tors are built with a 1.15 service factor in accordance with the contract specifications.
New motor nameplates were provided by the Trane Company in June and sent to Bellefonte Nuclear Plant.
The Trano Company has submitted Westinghouse Technical Report MM-9112, Qualification Document, Class IE Medium A.C. Motors to verify that these motors meet the requirements of IEEE Standards 323 and 334, and.therefore, meet the contract requirements and are qualified for their working environ-ment. TVA has reviewed this document relative to the FSAR environmental tables and found it acceptable for its intended use and location. The Trane Company has also submitted Westinghouse Certificates of Conformance certifying that the motors supplied are identical to those analyzed in the approved report, and TVA has " Accepted for Use" these documents.
Therefore, the nonconforming conditions (discrepant motor nameplates and lack of environmental qualification documentation) have been corrected.
To prevent recurrence, TVA's Division of Engineering Design Quality Engineering Branch inspectors have been instructed by memorandum to review equipment in greater detail to assure that requirements are met before release for delivery to TVA.
i