MONTHYEARML20217F1041999-10-14014 October 1999 Proposed Tech Specs Pages,Revising TS Sections 2.2 & 3.0/4.0,necessary to Support Mod P000224 Which Will Install New Power Range Neutron Monitoring Sys & Incorporate long- Term thermal-hydraulic Stability Solution Hardware ML20216J3471999-09-27027 September 1999 Corrected Tech Specs Page,Modifying Appearance of TS Page 3/4 4-8 as Typo Identified in Section 3.4.3.1 ML20212H5681999-09-27027 September 1999 Proposed Tech Specs Pages,Revising TS to Clarify Several Administrative Requirements,Delete Redundant Requirements & Correct Typos ML20196F5551999-06-22022 June 1999 Proposed Tech Specs Pages to Delete Surveillance Requirement 4.4.1.1.2 & Associated TS Administrative Controls Section 6.9.1.9.h,removing Recirculation Sys MG Set Stop ML20195H0651999-06-0909 June 1999 Revised Bases Pages B 3/4 10-2 & B 3/4 2-4 for LGS Units 1 & 2,in Order to Clarify That Requirements for Reactor Enclosure Secondary Containment Apply to Extended Area Encompassing Both Reactor Enclosure & Refueling Area ML20195E7611999-06-0707 June 1999 Proposed Tech Specs Table 3.6.3-1 & Associated Notations, Reflecting Permanently Deactivated Instrument Reference Leg Isolation Valve HV-61-102 ML20195G0481999-06-0707 June 1999 Proposed Tech Specs Section 3/4.4.3, RCS Leakage,Leakage Detection Systems, Clarifying Action Statement Re Inoperative Reactor Coolant Leakage Detection Systems ML20195B8431999-05-26026 May 1999 Proposed Tech Specs Section 4.1.3.5.b,removing & Relocating Control Rod Scram Accumulators Alarm Instrumentation to UFSAR & TS Section 3.1.3.5,allowing Alternate Method for Determining Whether Control Rod Drive Pump Is Operating ML20207L6591999-03-11011 March 1999 Proposed Tech Specs Section 2.1, Safety Limits, Revising MCPR Safety Limit ML20199G2021999-01-12012 January 1999 Proposed Tech Specs Section 3/4.4.2 & TS Bases Sections B 3/4.4.2,B 3/4.5.1 & B 3/4.5.2 to Increase Allowable as-found Main Steam SRV Code Safety Function Lift Setpoint Tolerance from +1% to +3% ML20199A7271999-01-0404 January 1999 Proposed Tech Specs Revising Administrative Section of TS Re Controlled Access to High Radiation Areas & Rept Dates for Annual Ore Rept & Annual Rer Rept ML20155H6401998-10-30030 October 1998 Proposed Tech Specs Pages Revising TS SRs 4.8.4.3.b.1, 4.8.4.3.b.2 & 4.8.4.3.b.3 in Order to Reflect Relay Setpoint Calculation Methodology ML20154Q8941998-10-15015 October 1998 Proposed Tech Specs Re Addition of Special Test Exception for IST & Hydrostatic Testing ML20154L3971998-10-13013 October 1998 Revised Tech Spec Bases Pages,Clarifying Thermal Overload Operation for Motor Operated Valves with Maintained Contact Control Switches ML20151Z4721998-09-14014 September 1998 Proposed Tech Specs Revising Table 4.4.6.1.3-1,re Withdrawal Schedule for Reactor Pressure Vessel Matl Surveillance Program Capsules ML20151V0951998-09-0404 September 1998 Proposed Tech Specs Ensuring Fidelity Between TS Pages & 970324 Submittal ML20236M1221998-07-0202 July 1998 Proposed Tech Specs Change Request 96-06-0,modifying FOL Page 8 ML20217K5291998-04-24024 April 1998 Proposed Tech Specs Page 6-18a Revising MCPR Safety Limit for Lgs,Unit 1,cycle 8 ML20202G7871998-02-0909 February 1998 Proposed TS Section 2.1, Safety Limits, Revising MCPR Safety Limit.Nonproprietary Supporting Info Encl ML20199G7771998-01-27027 January 1998 Proposed Tech Specs Pages,Removing Maximum Isolation Time for HPCI Turbine Exhaust Containment Isolation Valve HV-055-1(2)F072 from TS ML20198M7861998-01-12012 January 1998 Proposed Tech Specs Table 4.4.6.1.3-1 Re Surveillance Specimen Program Evaluation for Limerick Generating Station, Unit 1 ML20199H5971997-11-18018 November 1997 Proposed Tech Specs Re Affected Unit 1 FOL Page 8 ML20212D1851997-10-24024 October 1997 Proposed Tech Specs Revising Section 3/4.1.3.6 to Exempt Control Rod 50-27 from Coupling Test for Remainder for Cycle 7 at LGS Unit 1,provided Certain Conditions Are Met ML20216H1101997-09-0808 September 1997 Proposed Tech Specs,Supplementing Change Request 96-06-0 by Adding Three Addl TS Pages Containing Typos Discovered Since 970225 Submittal ML20210T9231997-09-0202 September 1997 Proposed Tech Specs,Revising TS Section 4.0.5 & Bases Sections B 4.0.5 & B 3/4.4.8 Re SRs Associated W/Isi & IST of ASME Code Class 1,2 & 3 Components ML20138A2311997-04-21021 April 1997 Proposed Tech Specs,Providing New Pp B 3/4 8-2a to Accomodate Overflow of Text from TS Bases Pp B 3/4 8-2 ML20137X8101997-04-0909 April 1997 Proposed Tech Specs Re Battery Specific Gravity Changes ML20137G6751997-03-24024 March 1997 Proposed Tech Specs Deleting Drywell & Suppression Chamber Purge Sys Operational Time Limit & Add SR to Ensure Purge Sys Large Supply & Exhaust Valves Are Closed as Required ML20135D0961997-02-25025 February 1997 Proposed Tech Specs Changing Corporate Name from PA Electric Co to PECO Energy Co & Removing Obsolete Info & Correcting Typos ML20133L2141997-01-15015 January 1997 Proposed Tech Specs Pp 3/4 5-5 mark-up Rev for Unit 1 Revising TS by Eliminating in-situ Functional Testing of ADS Valves Requirement as Part of start-up Testing Activities ML20135F0961996-12-0606 December 1996 Proposed Tech Specs 2.1 Re Safety Limits ML20135A4491996-11-25025 November 1996 Proposed Tech Specs Change Request 96-22-0,revising TS SR 4.8.1.1.2.e.2 & Supporting TS Bases Section 3/4.8,to Clarify Requirements Associated W/Single Load Rejection Testing of EDGs ML20134L7571996-11-0505 November 1996 Proposed Tech Specs Revising Same Pp Contained in TS Change Request 95-14-0 Re Adoption of Performance Based 10CFR50, App J,Option B Testing ML20128N7761996-09-27027 September 1996 Proposed Tech Specs 3/4.6.5 Re Secondary Containment & 4.6.5.1.1 Re Surveillance Requirements ML20116L2701996-08-0808 August 1996 Proposed Tech Specs,Revising TS Sections 3/4.3.1,3/4.3.2, 3/4.3.3 & Associated TS Bases Sections 3/4.3.1 & 3/4.3.2 to Eliminate Selected Response Time Testing Requirements ML20116H6511996-08-0505 August 1996 Proposed Tech Specs Section 2.1, Safety Limits, to Revise Min Critical Power Ratio Safety Limit ML20116E6191996-08-0101 August 1996 Proposed Tech Specs 3/4.4.6 Re Addition of Two Hydroset Curves,Effective for 6.5 & 8.5 Efpy,To Existing Ptol Curves ML20115A9111996-06-28028 June 1996 Proposed Tech Specs,Performing Containment leakage-rate Testing Per 10CFR50,App J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors, Option B ML20117H2621996-05-20020 May 1996 Proposed Tech Specs Sections 3/4.4.9.2,3/4.9.11.1,3/4.9.11.2 & Associated TS Bases 3/4.4.9 & 3/4.9.11 to More Clearly Described RHR Sys Shutdown Cooling Mode Operation ML20117D7801996-05-0303 May 1996 Proposed Tech Specs,Revising TS SRs to Change Surveillance Test Frequency for Performing Flow Testing of SGTS & RERS from Monthly to Quarterly ML20107M5141996-04-25025 April 1996 Proposed Tech Specs 3/4.3.7.7 Re Relocation of Traversing in-core Probe LCO ML20101L9211996-03-29029 March 1996 Proposed Tech Specs,Revising TS SR 4.5.1.d.2.b to Delete Requirement to Perform Functional Testing of ADS Valves as Part of start-up Testing Activities ML20095K5681995-12-22022 December 1995 Proposed Tech Specs Re Increase of Drywell & Suppression Chamber Purge Sys Operating Time Limit from 90 H Each 365 Days to 180 H Each 365 Days ML20094D2381995-10-27027 October 1995 Proposed TS Pages 1-6 & 1-7,revising Definitions 1.33, Reactor Enclosure Secondary Containment Integrity & 1.35, Refueling Floor Secondary Containment Integrity.' ML20093E5711995-10-10010 October 1995 Revised TS Page Re Primary Containment Isolation Valves ML20092J3961995-09-18018 September 1995 Proposed TS Table 4.3.1.1-1, RPS Instrumentation SRs & TS Bases 3/4.3.1,changing Calibr Frequency for LPRM Signal from Every 1,000 EFPH to Every 2,000 Megawatt Days Per Std Ton ML20092J3281995-09-14014 September 1995 Proposed Tech Specs,Removing Secondary Containment Isolation Valve Tables ML20087F9611995-08-10010 August 1995 Revised TS Pages 6-6 & 6-7 ML20087C9531995-08-0101 August 1995 Proposed Tech Specs in Order to Provide Alternate Actions to Allow Continuation of Core Alterations in Event Certain RMCS & Refueling Interlocks Are Inoperable ML20086S6131995-07-28028 July 1995 Proposed Tech Specs Reflecting Changes to Surveillance Test Frequency Requirements for Various RPS Instrumentation 1999-09-27
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217F1041999-10-14014 October 1999 Proposed Tech Specs Pages,Revising TS Sections 2.2 & 3.0/4.0,necessary to Support Mod P000224 Which Will Install New Power Range Neutron Monitoring Sys & Incorporate long- Term thermal-hydraulic Stability Solution Hardware ML20212H5681999-09-27027 September 1999 Proposed Tech Specs Pages,Revising TS to Clarify Several Administrative Requirements,Delete Redundant Requirements & Correct Typos ML20216J3471999-09-27027 September 1999 Corrected Tech Specs Page,Modifying Appearance of TS Page 3/4 4-8 as Typo Identified in Section 3.4.3.1 ML20196F5551999-06-22022 June 1999 Proposed Tech Specs Pages to Delete Surveillance Requirement 4.4.1.1.2 & Associated TS Administrative Controls Section 6.9.1.9.h,removing Recirculation Sys MG Set Stop ML20195H0651999-06-0909 June 1999 Revised Bases Pages B 3/4 10-2 & B 3/4 2-4 for LGS Units 1 & 2,in Order to Clarify That Requirements for Reactor Enclosure Secondary Containment Apply to Extended Area Encompassing Both Reactor Enclosure & Refueling Area ML20195E7611999-06-0707 June 1999 Proposed Tech Specs Table 3.6.3-1 & Associated Notations, Reflecting Permanently Deactivated Instrument Reference Leg Isolation Valve HV-61-102 ML20195G0481999-06-0707 June 1999 Proposed Tech Specs Section 3/4.4.3, RCS Leakage,Leakage Detection Systems, Clarifying Action Statement Re Inoperative Reactor Coolant Leakage Detection Systems ML20195B8431999-05-26026 May 1999 Proposed Tech Specs Section 4.1.3.5.b,removing & Relocating Control Rod Scram Accumulators Alarm Instrumentation to UFSAR & TS Section 3.1.3.5,allowing Alternate Method for Determining Whether Control Rod Drive Pump Is Operating ML20207L6591999-03-11011 March 1999 Proposed Tech Specs Section 2.1, Safety Limits, Revising MCPR Safety Limit ML20199G2021999-01-12012 January 1999 Proposed Tech Specs Section 3/4.4.2 & TS Bases Sections B 3/4.4.2,B 3/4.5.1 & B 3/4.5.2 to Increase Allowable as-found Main Steam SRV Code Safety Function Lift Setpoint Tolerance from +1% to +3% ML20199A7271999-01-0404 January 1999 Proposed Tech Specs Revising Administrative Section of TS Re Controlled Access to High Radiation Areas & Rept Dates for Annual Ore Rept & Annual Rer Rept ML20195J1651998-11-16016 November 1998 Rev D to LGS Emergency Preparedness NUMARC Eals ML20155H6401998-10-30030 October 1998 Proposed Tech Specs Pages Revising TS SRs 4.8.4.3.b.1, 4.8.4.3.b.2 & 4.8.4.3.b.3 in Order to Reflect Relay Setpoint Calculation Methodology ML20154Q8941998-10-15015 October 1998 Proposed Tech Specs Re Addition of Special Test Exception for IST & Hydrostatic Testing ML20154L3971998-10-13013 October 1998 Revised Tech Spec Bases Pages,Clarifying Thermal Overload Operation for Motor Operated Valves with Maintained Contact Control Switches ML20151Z4721998-09-14014 September 1998 Proposed Tech Specs Revising Table 4.4.6.1.3-1,re Withdrawal Schedule for Reactor Pressure Vessel Matl Surveillance Program Capsules ML20151V0951998-09-0404 September 1998 Proposed Tech Specs Ensuring Fidelity Between TS Pages & 970324 Submittal ML20236M1221998-07-0202 July 1998 Proposed Tech Specs Change Request 96-06-0,modifying FOL Page 8 ML20217K5291998-04-24024 April 1998 Proposed Tech Specs Page 6-18a Revising MCPR Safety Limit for Lgs,Unit 1,cycle 8 ML20202G7871998-02-0909 February 1998 Proposed TS Section 2.1, Safety Limits, Revising MCPR Safety Limit.Nonproprietary Supporting Info Encl ML20199G7771998-01-27027 January 1998 Proposed Tech Specs Pages,Removing Maximum Isolation Time for HPCI Turbine Exhaust Containment Isolation Valve HV-055-1(2)F072 from TS ML20198M7861998-01-12012 January 1998 Proposed Tech Specs Table 4.4.6.1.3-1 Re Surveillance Specimen Program Evaluation for Limerick Generating Station, Unit 1 ML20203H2501997-12-31031 December 1997 Rev 19 to Odcm ML20198N8061997-12-31031 December 1997 NPDES Permit PA-0052221 Study Plan for Fecal Coliform Bacteria in Pont Pleasant Water Diversion Sys During May- Sept 1998 ML20199H5971997-11-18018 November 1997 Proposed Tech Specs Re Affected Unit 1 FOL Page 8 ML20212D1851997-10-24024 October 1997 Proposed Tech Specs Revising Section 3/4.1.3.6 to Exempt Control Rod 50-27 from Coupling Test for Remainder for Cycle 7 at LGS Unit 1,provided Certain Conditions Are Met ML20211P9471997-10-15015 October 1997 Revised MSRV Tailpipe Temp Action Plan ML20216H1101997-09-0808 September 1997 Proposed Tech Specs,Supplementing Change Request 96-06-0 by Adding Three Addl TS Pages Containing Typos Discovered Since 970225 Submittal ML20210T9231997-09-0202 September 1997 Proposed Tech Specs,Revising TS Section 4.0.5 & Bases Sections B 4.0.5 & B 3/4.4.8 Re SRs Associated W/Isi & IST of ASME Code Class 1,2 & 3 Components ML20141K9461997-05-27027 May 1997 PECO Nuclear Limerick Generating Station Unit 2 Startup Test Rept Cycle 5 ML20203H2701997-04-30030 April 1997 Rev 18 to Odcm ML20138A2311997-04-21021 April 1997 Proposed Tech Specs,Providing New Pp B 3/4 8-2a to Accomodate Overflow of Text from TS Bases Pp B 3/4 8-2 ML20137X8101997-04-0909 April 1997 Proposed Tech Specs Re Battery Specific Gravity Changes ML20137G6751997-03-24024 March 1997 Proposed Tech Specs Deleting Drywell & Suppression Chamber Purge Sys Operational Time Limit & Add SR to Ensure Purge Sys Large Supply & Exhaust Valves Are Closed as Required ML20135D0961997-02-25025 February 1997 Proposed Tech Specs Changing Corporate Name from PA Electric Co to PECO Energy Co & Removing Obsolete Info & Correcting Typos ML20133L2141997-01-15015 January 1997 Proposed Tech Specs Pp 3/4 5-5 mark-up Rev for Unit 1 Revising TS by Eliminating in-situ Functional Testing of ADS Valves Requirement as Part of start-up Testing Activities ML20135F0961996-12-0606 December 1996 Proposed Tech Specs 2.1 Re Safety Limits ML20135A4491996-11-25025 November 1996 Proposed Tech Specs Change Request 96-22-0,revising TS SR 4.8.1.1.2.e.2 & Supporting TS Bases Section 3/4.8,to Clarify Requirements Associated W/Single Load Rejection Testing of EDGs ML20134L7571996-11-0505 November 1996 Proposed Tech Specs Revising Same Pp Contained in TS Change Request 95-14-0 Re Adoption of Performance Based 10CFR50, App J,Option B Testing ML20128N7761996-09-27027 September 1996 Proposed Tech Specs 3/4.6.5 Re Secondary Containment & 4.6.5.1.1 Re Surveillance Requirements ML20116L2701996-08-0808 August 1996 Proposed Tech Specs,Revising TS Sections 3/4.3.1,3/4.3.2, 3/4.3.3 & Associated TS Bases Sections 3/4.3.1 & 3/4.3.2 to Eliminate Selected Response Time Testing Requirements ML20116H6511996-08-0505 August 1996 Proposed Tech Specs Section 2.1, Safety Limits, to Revise Min Critical Power Ratio Safety Limit ML20116E6191996-08-0101 August 1996 Proposed Tech Specs 3/4.4.6 Re Addition of Two Hydroset Curves,Effective for 6.5 & 8.5 Efpy,To Existing Ptol Curves ML20113E0491996-06-28028 June 1996 Technical Basis & Description of Approach for Review Method Selection ML20115A9111996-06-28028 June 1996 Proposed Tech Specs,Performing Containment leakage-rate Testing Per 10CFR50,App J, Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors, Option B ML20117H2621996-05-20020 May 1996 Proposed Tech Specs Sections 3/4.4.9.2,3/4.9.11.1,3/4.9.11.2 & Associated TS Bases 3/4.4.9 & 3/4.9.11 to More Clearly Described RHR Sys Shutdown Cooling Mode Operation ML20112C1691996-05-17017 May 1996 Startup Rept Cycle 7 ML20117D7801996-05-0303 May 1996 Proposed Tech Specs,Revising TS SRs to Change Surveillance Test Frequency for Performing Flow Testing of SGTS & RERS from Monthly to Quarterly ML20107M5141996-04-25025 April 1996 Proposed Tech Specs 3/4.3.7.7 Re Relocation of Traversing in-core Probe LCO ML20101L9211996-03-29029 March 1996 Proposed Tech Specs,Revising TS SR 4.5.1.d.2.b to Delete Requirement to Perform Functional Testing of ADS Valves as Part of start-up Testing Activities 1999-09-27
[Table view] |
Text
_ _ . - . _ _ _ - _ - - - . . . . . _ . - - _ _ . . _ . . _ _ - . . . _ .
ATTACHMENT 2 LIMERICK GENERATING STATION UNITS 1 AND 2 DOCKET NOS. 50 352 50 353 LICENSE NOS. NPF-39 NPF-85 TECHNICAL SPECIFICATIONS CHANGE REQUEST NO. 9416-0 LIST OF AFFECTED PAGES UNIT 1 UNIT 2 3/4 3-60a 3/4 3 60a 3/442 3/442 618a 618a l
t 9407110189 940630 PDR- ADOCK 05000352 P PDR
. r- TABLE 3.3.6-2 (continued) -
E S3 CONTROL R00 BLOCK INSTRUMENTATION SETPOINTS 8
TRIP FUNCTION TRIP SETPOINT ALLOWABLE VALUE
]' '
si 6. REACTOR COOLANT SYSTEM RECIRCULATION
- 3 FLOW
- a. Upscale. * *
- b. Inoperative N.A. N.A.
- c. Comparator s 10% flow deviation s II% flow deviation
- 7. REACTOR MODE SWITCH SHUTDOWN POSITION N.A. N.A.
M.
Y 8
- Refer to the COLR for these setpoints.
- May be reduced provided the Source Range Monitor has an observed count rate and signal-to-noise ratio on or above the curve shown in Figure 3.3.6-1.
(a) There are three upscale trip levels. Each is applicable only over its specified operating core thermal power range. A'. RBM trips are automatically bypassed below the low power setpoint (LPSP). The upscale LTSP is applied beiween the low power setpoint (LPSP) and the intermediate power setpoint (IPSP). The upscale ITSP is applied between the intermediate power setpoint and the high power setpoint (HPSP).
The HTSP is applied above the high power sr:tpoint.
(b) Power range setpoints control enforcement of appropriate upscale trips over the proper core thermal powe. ringes. The power signal to the RBM is provided by the APRM.
, . . , . . , - , - - - - ~ - - - .-
, , BL% TOR COOLANT SYSTEM SVRVEllLANCE RE0VIREMENTS 4.4.1.1.1 Each pump discharge valve shall be demonstrated OPERABLE by cycling each valve through at least one complete cycle of full travel during each startup* prior to THERMAL POWER exceeding 25% of RATED THERMAL POWER.
4.4.1.. 2 Each pump MG set scoop tube mechanical and electrical stop shall be demonstrated OPERABLE with overspeed setpoints less than or equal to the setpoints as noted in the CORE OPERATING LIMITS REPORT, as a percentage of rated core flow, at least once per 24 months.
4.4.1.1.3 Establish a baseline APRM and LPRM** neutron flux noise value within the regions for which monitoring is required (Specification 3.4.1.1, ACTION c with!n 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> of entering the region for which monitoring is required unless )
baselining has previously been performed in the region since the last refueling outage.
4.4.1.1.4 With one reacto'r coolant system recirculation loop not in operation, at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> verify that:
- a. Reactor THERMAL POWER is s 70% of RATED THERMAL POWER,
- b. The recirculation flow control system is in the Local Manual modo, and
- c. The speed of the operating recirculation pump is s 90% of rated pump speed.
- d. Core flow is greater than 39% when THERMAL POWER is within the restricted zone of Figure 3.4.1.1-1.
4.4.1.1.5 With one reactor coolant system recirculation loop not in operation, within 15 minutes prior to either THERMAL POWER increase or recirculation loop flow increase, verify that the following differential temperature requirements are met if THERMAL POWER is s 30% of RATED THERMAL POWER or the recirculation loop flow in the operating recirculation loop is s 50% of rated loop flow:
- a. s 145'F betweer reactor vessel steam space coolant and bottom head drain line coolant,
- b. s 50*F between the reactor coolant within the loop not in operation and the coolant in the reactor pressure vessel, and
- c. s 50*F between the reactor coolant within the loop not in operation and the operating loop.
The differential temperature requirements of Specification 4.4.1.1.5b. and c.
do not apply when the loop not in operation is isolated from the reactor p pressure vessel.
- 1f not performed within the previous 31 days.
- Detector levels A and C of one LPRM string aer core octant plus detectors A and C of one LPRM string in the center of tie core should be monitored.
LIMERICK - UNIT-1 3/4 4-2
,, AD'MINISTRATIVE CONTROLS CORE OPERATJJ1G LlHITS REP 0jil 6.9.1.9 Core Operating Limits shall be established prior to each reload I cycle, or prior to any remaining aortion of a reload cycle, and shall be documented in the CORE OPERATING _lHITS REPORT for the following:
- a. The AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR) for Specification 3.2.1,
- b. MAPFAC(P) and MAPFAC(f) factors for Specification 3.2.1,
- c. The MINIMUM CRITICAL POWER RATIO (MCPR) for Specification 3.2.3,
- d. The MCPR(P) and MCPR(F) adjustment factors for specification 3.2.3,
- c. The LINEAR 11 EAT GENERATION RATE (LHGR) for Specification 3.2.4,
- f. The power biased Rod Block Monitor setpoints and the Rod Block Monitor MCPR OPERABILITY limits of Specification 3.3.6,
- g. The Reactor Coolant System Recirculation Flow upscale trip setpoint and allowable value for Specification 3.3.6,
- h. The Recirculation MG set mechanical and electrical overspeed stop setpoints for Specification 4.4.1.1.2.
6.9.1.10 The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC, specifically those described in the following document:
- a. NEDE-240ll-P-A " General Electric Standard Application for Reactor fuel" (Latest approved revision).
6.9.1.11 The core operating limits shall be determined such that all applicable limits (e.g., fuel thermal-mechanical limits, core thermal-hydraulic limits, ECCS limits, nuclear limits such as SHUTDOWN MARGIN, transient analysis limits, and accident analysis limits) of the safety analysis are met.
6.9.1.12 The CORE OPERATING LIMllS REPORT, including any mid-cycle revisions or supplements, shall be provided upon issuance for each reload cycle to the NRC Document Control Desk with copies to the Regional. Administrator and Resident inspector.
SPECIAL REPORTS 6.9.2 Special reports shall be submitted to the Regional Administrator of the Regional Office of the NRC within the time period specified for each report.
LIMERICK - UNIT 1 6-18a
TABLE 3.3.6-2 (Continued) ,
hk CONTROL R00 BLOCK INSTRUMENTATION SETPOINTS B
5? TRIP FUNCTION TRIP SETPOINT ALLOWABLE VALUE
- 4. INTERMEDIATE RANGE MONITORS 25 a. Detector not full in N.A. N.A.
-4
- b. Upscale s 108/125 divisions of s 110/125 divisions of
- c. Inoperative N.A. N.A.
- d. Downscale 2 5/125 divisions of full 2 3/125 divisions of full scale scale S. SCRAM DISCHARGE VOLUME
- a. Water Level-High 5 257' 7 3/8" elevation *** s 257" 9 3/8" elevation
- a. Float Switch
- 6. REACTOR COOLANT SYSTEM RECIRCULATION us FLOW ls a. Upscale ***** ***** l us b. Inoperative N.A. N.A.
g c. Comparator s 10% flow deviation 511% flow deviation w
- 7. REACTOR MODE SWITCH SHUTDOWN POSITION N.A. N.A.
- The rod block function varies as a function of recirculation loop drive flow (W). The trip settir?g of the average power range monitor rod block function must be maintained in accordance with Specification 3.2.2.
- May be reduced, provided the source range monitor has an observed count rate and signal-to-noise ratio on or above the curve shown in Figure 3.3.6-1.
- The value of N is shown in the CORE OPERATING LIMITS REPORT in accordance with Specifications 6.9.1.9 thru 6.9.1.12.
- Refer to COLR for these setpoints.
l REACTOR COOL ANT SYST@
SURVElltANCE RE0VIREMENTS aump discharge valva. shall be demonstrated OPERABLE by cycling 4.4.1,1.1 Each each valve througi at least one cor,slete cycle of full travel during each startup* prior to THERMAL POWER c4ceeding 25% of RATED THERMAL POWER.
4.4.1.1.2 Each pump MG set scoop tube mechanical and electrical stop shall be demonstrated OPERABLE with overspeed setpoints less than or equal to the m setpoints as noted in the CORE OPERATING LIMITS REPORT, as a percentage of rated core flow, at least once per 24 months.
4.4.1.1.3 Establish a baseline APRM and LPRM** neutron flux noise value within the regions for which monitoring is required (Specification 3.4.1.1, ACTION c) within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> of entering the region for which monitoring is required unless baselining has previously been performed in the region since the last refueling outage.
4.4.1.1.4 With one reacto'r coolant system recirculation loop not in operation, at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> verify that:
- a. Reactor THERMAL POWER is s 70% of RATED THERMAL POWER,
- b. The recirculation flow control system is in the local Manual mode, and
- c. The speed of the operating recirculation pump is s 90% of rated pump speed.
- d. Core flow is greater than 39% when THERMAL POWER is within the restricted zone of Figure 3.4.1.1-1.
4.4.1.1.5 With one reactor coolant system recirculation loop not in operation, within 15 minutes prior to either THERMAL POWER increase or recirculation loop flow increase, verify that the following differential-temperature requirements are met if THERMAL POWER is s 30% of RATED THERMAL POWER or the recirculation loop flow in the operating recirculation loop is s 50% of rated loop flow; a, s 145'F between reactor vessel steam space coolant and bottom head drain line coolant,
- b. s 50'f between the reactor coolant within the loop not in operation and the coolant in the reactor pressure vessel, and
- c. 5 50*f between the reactor coolant within the loop not in operation and the operating loop.
The differential temperature requirements of Specification 4.4.1.1.5b. and c.
do not apply when the loop not in operation is isolated from the reactor pressure vessel.
- 1f not performed within the previous 31 days.
- Detector levels A and C of one LPRM string per core octant plus detectors A and C of one LPRM string in the center of the core should be monitored.
LIMERICK - UNIT 2 3/4 4-2
. ,.ADhlNISTRATIVf CONTROLS CORE OPERATING LIMITS REPORT
~
6.9.1.9 Core Operating Limits shall be established prior to each reload .
cycle, or prior to any remaining portion of a reload cycle, and shall be documented in the CORE OPERATING LIMITS REPORT for the following:
- a. The AVERAGE PLANAR LINEAR HEAT GENERATION RATE (APLHGR) for Specification 3.2.1,
- b. The MINIMUM CRITICAL POWER RATIO (MCPR) for Specification 3.2.3,
- c. The K, core flow adjustment factor for specification 3.2.3,
- d. The LINEAR HEAT GENERATION RATE (LHGR) for Specification 3.2.4,
- e. The upscale flow biased Rod Block Monitor setpoint and the upscale high flow clamped Rod Block monitor setpoint of Specification 3.3.6,
- f. The Reactor Coolant System Recirculation flow upscale trip setpoint and allowable value for Specification 3.3.6,
- g. The Recirculation MG set mechanical and electrical overspeed stop setpoints for Specification 4.4.1.1.2.
6.9.1.10 The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC, specifically those i described in the following document:
- a. NEDE-240ll-P-A " General Electric Standard Application for Reactor Fuel" (Latest approved revision).
6.9.1.11 The core operating limits shall be determined such that all applicable limits (e.g., fuel thermal-mechanical limits, core thermal-hydraulic limits, ECCS limits, nuclear limits such as SHUTDOWN MARGIN, transient analysis limits, and accident analysis limits _ of the safety analysis are met.
6.9.1.12 The CORE OPERATING LIMITS REPORT, including any mid-cycle revisions or supplements, shall be provided upon issuance for each reload cycle to the NRC Document Control Desk with copies to the Regional Administrator and Resident inspector.
SPECIAL REPORTS 6.9.2 Special reports shall be submitted to the Regional Administrator of the Regional Office of the NRC within the time period specified for each report.
LIMERICK - UNIT 2 6-18a