ML20071F124
| ML20071F124 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 03/09/1983 |
| From: | Dixon O SOUTH CAROLINA ELECTRIC & GAS CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20071F126 | List: |
| References | |
| NUDOCS 8303110035 | |
| Download: ML20071F124 (2) | |
Text
SOUTH CAROLINA ELECTRIC & GAS COMPANY Posy OFFsCE Ts4 COLuna8IA. SOUTM CAROuN A 29218 O. W.OlXON,JR.
VICE PmE$lOENT Nucuam ortmAfioN.
March 9, 1983 Mr. Harold R.
Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Subject:
Virgil C. Summer Nuclear Station Docket No. 50/395 Operating License No. NPF-12 Seismic Confirmatory Program, Addendum 1 License Condition 2.C.(25)
Dear Mr. Denton:
South Carolina Electric and Gas Company (SCE&G), hereby, submits ten (10) copies the Addendum to Appendix B of Report I, " Seismic Confirmatory Program for Equipment and Components for the Virgil C.
Summer Nuclear Station," in response to Operating License Condition 2.C.(25).
Also enclosed are copies of an Errata Page and Document Approval Sheet to be inserted in the original Report I.
The Document Approval Sheet reflects completion of the Quality Assurance review of the original Appendix B and this Addendum.
Accordingly, the preliminary Quality Assurance notice contained in Appendix B should now be removed.
Please respond in writing to us when your evaluation is complete.
Very truly yours, 7
6 O. W. Dixon, Jr.
NEC:OWD/fjc cc:
V.
C.
Summer W.
A.
Williams, Jr.
E.
C.
Roberts R.
B.
Clary l
H. N. Cyrus O.
S.
Bradham g
T.
C. Nichols, Jr.
A.
R.
Koon ga
,p he'*j,,1 O. W. Dixon, Jr.
C. A.
Price M. B.
Whitaker, Jr.
G. J.
Braddick J.
P.
O'Reilly J.
L.
Skolds H.
T.
Babb J.
C.
Miller
//f f 2E'#
D. A. Nauman J.
B.
Knotts, Jr.
'pa /GSd C. L. Ligon (NSRC)
B. A. Bursey
,y 16 yg Ao*I
[
8303110035 830309 DR ADOCK 050003 5 g),gj gg.
FORM 4.1-1 URS/BLUME DOCUMENT APPROVAL SHEET DOCUMENT TITLE: Experimental Investigation of Relative Response of Accelerograph Pad, Free Field and Structural Foundations at Virgil C. Summer Nuclear Station.
Specification O Other DOCUMENT TYPE:
Criteria Interface Report X PROJECT NAME:
SCE&G/ASLB Confi rmatory Program JOB NO.:
8256 CLIENT:
South Carolina Electric and Gas Comoany This document has been prepared in accordance with:
X the URS/Blume Quality Assurance Manual and project requirements the URS/Blume Project Control System and project requirements Initial issue (Rev. 0)
Prepared by:
b b4 N
$* 8' b Date:
Reviewed by:
b:<wAt D.1ModL.
Date 6 M S d>IG M '
7 Approved by:
l, t
Date: M3 l
A REVISION RECORD:
Revision Prepared Reviewed Approvei By/
Description of Revision No.
By By Date Rev. 9 5/14/82
- ERRATA l
CONTENTS. Add the following:
l FIGURES (148 pages)
IX.
ADDENDUM March 1983 (Separate Document) i 4
TABLE V.C.1:
Run #
Error at Delete or Change To 1
Code Revision #
2 1
110 Code Revision !
2 1
111 Code Revision #
2 1
225 Receivers X/Y 2nd WP/FR 228 Component R
T 1
I l
248 Shot #s 5
248 Receivers X/Y P2/P4 P2/P5 249 Receivers X/Y P2/P4 P2/P5 251 Component R
T 253 Component R
T I
FIGURE TITLES:
i Figure VI.E.4: Averaged Ratio of the Auxiliary Building Foundation to the USGS Pad Response Spectra (5% Damped)
Figure VI.E.5: Averaged Ratio of the Diesel Generator Sump Foundation to the USGS Pad Response Spectra (5% Damped)
Figure VI.E.6: Averaged Ratio of the Service Water Pumphouse Foundation to the USGS Pad Response Spectra (5% Damped)
SB2/Blume m
-w..
e a
w w
n
,,,,-rm,-
-,,,-+-r
--m-e-r r
-,--,w--
r
,,a-