ML20071F121
| ML20071F121 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 02/16/1983 |
| From: | Eddings M TENNESSEE VALLEY AUTHORITY |
| To: | |
| Shared Package | |
| ML20071F105 | List: |
| References | |
| NUDOCS 8303150445 | |
| Download: ML20071F121 (2) | |
Text
r
's OPERATING DATA REPORT DOCET NO. 50-327 DATE FEBRUARY 15, 1983 CCt!FtETED FY M 0 EDDINGS TELEPHrhE (615) 751-0421 WEPATING STAT 1JS
- 1. UNIT NAME: SECWtAH NUCtEAR PLANT, UNIT 1 NOTES: The forced outage rate corrected
- 2. REPORT PERIOD: JAN'JARY 1983 per the forced outage hours revised
- 3. LICENSED THEFNL F0WER(MWT):
3411.0 on the Unit Shutdowns and Power
- 4. Nff!EPLATE RATING (OROSS MWE):
1220.6 Reductions Data Sheet.
- 5. DESIGN ELECTRICfL RATING (NET MWE):
1143.0
- 6. MAXIMUM CEPEhDAPLE CAPACITY (GROSS MWE):
1163.0
- 7. MAXIMUM DEPENDAELE CAPACITY (NET MWE):
1128.0
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEM 3 NLHPERS 3 THROUGH 7)SINCE LAST REPORT, GI'd REASOffi:
- 9. POWER LEVEL TO WHICH RESTRICTED,IF ANY(NET t%D:
- 10. REASONS FOR RESTRICTIONS,IF ANY:
THIS MONTH YR.-TO-DATE O.iMULATIVE
- 11. KURS IN REPORTING PERIOD 744.00 744.00 13921.00
- 12. NUMPER OF H0'JRS FSACTOR WAS CRITICAL 317.95 317.95 7353.65
- 13. FfACTOR RESERVE cRIDCWN HOURS 0.00 0.00 0.00
- 14. HOURS GEEPATOR Cti-LINE 241.30 241.30 7560.80
- 15. UNIT FESERVE CRTDOWN HOURS 0.00 0.00 0.00
- 16. OROSS TEFNL ENERGY GEERATED (MWH) 589085.17 589085.17 23871827.17
- 17. GROSS ELECTRICfL ENERGY GEN. (MWH) 190050.00 190050.00 7947586.00
- 18. ET ELECTRICfL ENERGY CENEPATED (MWH) 177017.00 177017.00 7613021.00
- 19. UNIT clRVICE FACTOR 32.43 32.43 54.31
- 20. UNIT AVAILA5!LITY FACTOR 32.43 32.43 54.31
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 21.09 21.09 48.43
- 22. UNIT CAPACITY FACTOR (USING DER NET) 20.73 20.73 47.64
- 23. UNIT FCRCED OUTACE RATE 13.73 13.73 17.69 *
- 24. SHUTDOWNS SCHEDULED OVER FEXT 6 MONTHS (TYPE, DATE, fdD DURATION T EACH):
- 25. IF (RTKW AT END OF FEPORT PERIOD. ESTIMATED DATE OF STARTUP:
NOTE THAT THE THE YR.-TO-DATE AND CUMULATIVE VALUES HAVE BEEN UPDATED.
8303150445 830216 PDR ADOCK 05000327 R
_9_
s UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-327 s
UNIT NAME seauoyah one DATE January Ic)33 COMPLETED BY M. Eddings REPORT MONTH January 1983 TELEPHONE (615) 751-0341 S
w o
8g "j.
c yy Licensee jj Cause & Corrective No.
Date 8,
O$
8
'802 Event 8*.
Action to y
2e 5y*
Report #
- 'g g]
Prevent Recurrence E"
?#5 N"
5" e
o 1
83/01/01 S
454 C
4 Refueling Outage c
J 2
83/01/19 F
0,8 A
9 Turbine Trip 111-111 Level on #1 S/G.
3 83/01/19 F
1.0 A
9 I
Turbine Trip 111-111 Level on #3 S/G.
C 4
83/01/20 F
1.1 A
9 Turbine Trip Hi-Ili Level on #1 S/G.
i 5
83/01/20 F
6.6 A
9 Turbine Trip 111-111 Level on #2 S/G.
6 83/01/20 F
8.8 A
3
- 4 Loop Steam Flow /Feedwater Flow Mismatch.
7 83/01/20 F
8.0 A
3 Turbine Trip #1 S/G 111 Level Rx Trip #2 S/G Lo-Lo Level.
8 83/01/21 S
10,3 B
9 Turbine overspeed Trip Test.
9 83/01/24 F
12.1 A
3 Lo-Lo Level #2 S/G.
1 2
3 4
F: Forced Reason:
Method:
Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Haintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Cont. of Existing 0161)
E-Operator Training & License Examination Outage F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other 5
(9/77)
II-Other (Explain)
Exhibit I-Same Source b evised 2/15/83 from a Forced Outage to a Scheduled Outage.
R