ML20071F121

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Jan 1983
ML20071F121
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 02/16/1983
From: Eddings M
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML20071F105 List:
References
NUDOCS 8303150445
Download: ML20071F121 (2)


Text

r

's OPERATING DATA REPORT DOCET NO. 50-327 DATE FEBRUARY 15, 1983 CCt!FtETED FY M 0 EDDINGS TELEPHrhE (615) 751-0421 WEPATING STAT 1JS

1. UNIT NAME: SECWtAH NUCtEAR PLANT, UNIT 1 NOTES: The forced outage rate corrected
2. REPORT PERIOD: JAN'JARY 1983 per the forced outage hours revised
3. LICENSED THEFNL F0WER(MWT):

3411.0 on the Unit Shutdowns and Power

4. Nff!EPLATE RATING (OROSS MWE):

1220.6 Reductions Data Sheet.

5. DESIGN ELECTRICfL RATING (NET MWE):

1143.0

6. MAXIMUM CEPEhDAPLE CAPACITY (GROSS MWE):

1163.0

7. MAXIMUM DEPENDAELE CAPACITY (NET MWE):

1128.0

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEM 3 NLHPERS 3 THROUGH 7)SINCE LAST REPORT, GI'd REASOffi:
9. POWER LEVEL TO WHICH RESTRICTED,IF ANY(NET t%D:
10. REASONS FOR RESTRICTIONS,IF ANY:

THIS MONTH YR.-TO-DATE O.iMULATIVE

11. KURS IN REPORTING PERIOD 744.00 744.00 13921.00
12. NUMPER OF H0'JRS FSACTOR WAS CRITICAL 317.95 317.95 7353.65
13. FfACTOR RESERVE cRIDCWN HOURS 0.00 0.00 0.00
14. HOURS GEEPATOR Cti-LINE 241.30 241.30 7560.80
15. UNIT FESERVE CRTDOWN HOURS 0.00 0.00 0.00
16. OROSS TEFNL ENERGY GEERATED (MWH) 589085.17 589085.17 23871827.17
17. GROSS ELECTRICfL ENERGY GEN. (MWH) 190050.00 190050.00 7947586.00
18. ET ELECTRICfL ENERGY CENEPATED (MWH) 177017.00 177017.00 7613021.00
19. UNIT clRVICE FACTOR 32.43 32.43 54.31
20. UNIT AVAILA5!LITY FACTOR 32.43 32.43 54.31
21. UNIT CAPACITY FACTOR (USING MDC NET) 21.09 21.09 48.43
22. UNIT CAPACITY FACTOR (USING DER NET) 20.73 20.73 47.64
23. UNIT FCRCED OUTACE RATE 13.73 13.73 17.69 *
24. SHUTDOWNS SCHEDULED OVER FEXT 6 MONTHS (TYPE, DATE, fdD DURATION T EACH):
25. IF (RTKW AT END OF FEPORT PERIOD. ESTIMATED DATE OF STARTUP:

NOTE THAT THE THE YR.-TO-DATE AND CUMULATIVE VALUES HAVE BEEN UPDATED.

8303150445 830216 PDR ADOCK 05000327 R

PDR

_9_

s UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-327 s

UNIT NAME seauoyah one DATE January Ic)33 COMPLETED BY M. Eddings REPORT MONTH January 1983 TELEPHONE (615) 751-0341 S

w o

8g "j.

c yy Licensee jj Cause & Corrective No.

Date 8,

O$

8

'802 Event 8*.

Action to y

2e 5y*

Report #

  1. 'g g]

Prevent Recurrence E"

?#5 N"

5" e

o 1

83/01/01 S

454 C

4 Refueling Outage c

J 2

83/01/19 F

0,8 A

9 Turbine Trip 111-111 Level on #1 S/G.

3 83/01/19 F

1.0 A

9 I

Turbine Trip 111-111 Level on #3 S/G.

C 4

83/01/20 F

1.1 A

9 Turbine Trip Hi-Ili Level on #1 S/G.

i 5

83/01/20 F

6.6 A

9 Turbine Trip 111-111 Level on #2 S/G.

6 83/01/20 F

8.8 A

3

  1. 4 Loop Steam Flow /Feedwater Flow Mismatch.

7 83/01/20 F

8.0 A

3 Turbine Trip #1 S/G 111 Level Rx Trip #2 S/G Lo-Lo Level.

8 83/01/21 S

10,3 B

9 Turbine overspeed Trip Test.

9 83/01/24 F

12.1 A

3 Lo-Lo Level #2 S/G.

1 2

3 4

F: Forced Reason:

Method:

Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Haintenance or Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Cont. of Existing 0161)

E-Operator Training & License Examination Outage F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other 5

(9/77)

II-Other (Explain)

Exhibit I-Same Source b evised 2/15/83 from a Forced Outage to a Scheduled Outage.

R