ML20071A452
| ML20071A452 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 03/31/1991 |
| From: | Boldt G, Mclaughlin R FLORIDA POWER CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 3FO491-03, 3FO491-3, NUDOCS 9104160218 | |
| Download: ML20071A452 (1) | |
Text
.
l
., f,. :
9-v' g*,
e E
b Power-z C0RPORAT4ON l
Crptal Rlwr Unk 3
!,~
Decket No,2302
~
-April 12, 1991 L
.3F0491-03 Document Control Desk U. S.. Nuclear Regulatory Commission Washington, DC-' 20555
Subject:
--Monthly Operating Report i
Dear Sir,
c
- Attached is the Crystal-River Unit 3 March 1991 Monthly Operating Report. This p,
' report.is submitted in accordance with Technical Specification 6.9.1.6.
l, Sincerely, G. L o
. Vice President-
. Nuclear Production
?
/wl a -
i L
-Attachment'-
xc: -Regional Administrator, ' Region II Senior Resident. Inspector
.NRR Project; Manager ~
j l-160034 l
$$ SY '
Pb<
00b Ob0bbbO2 A Florida Progress Company R
/jj
..._,.._,,._...__m__
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-302 UNIT FLCRP 3 DATE APRIL 04,1991 COMPLETED BY R. L. Mclaughlin TELEPHONE (904)795-6486 MONTH MARCH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWo-Net)
(MWo-Net) 1 823 17 823 2
824 18 826 3
'825 19 829 4
654 20 829 5
605 21 829 6
606 22 829 7
634' 23 828 8
831 24 828 9
831 25 826-10
'827 26 822 11 833 27 821 12 836 28 622 13 839 29 823 14 837-30 816 15 834--
31 817 16 829 INSTRUCTIONS:
On this format, list the daily average unit power levelin MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
OPERATING DATA REPORT DOCKET NO.
50 302 L
UNa FLCRP-3 DATE APRIL 04,1991 COMPLETED DY R. L. M0laughlin TELEPHONE (904)795 6486 OPERATING STATUS 1.
UNIT N AME:......
CRYSTAL RIVER UNIT 3
- 2. REPORTING PERIOD...
, MARCH 1-31,1991
- 3. LICENSED THERMAL POWER (MWI):,,....
2544 4.
NAMEPLATE RATING (GROSS MWe):.
890
- 5. DESIGN ELECTRICAL RATING (NET MWo):,
825'
- 6. MAXIMUM DEPENDADLF CAPACITY (GROSS MWa):.. 860
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):.,,
821
- 8. IF CHANGES OCCUR IN C APACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. OlvE REASONS.
NA 9, POWER LEVEL TO WHICH RESTRICTED,IF ANY (NET MWe):
N/A
- 10. REASONS FOR RESTRlCTIONS,IF ANY:
N/A THIS MONTH YR. TO DA1 E CUMULATIVE 11, HOURS IN REPORTING PERIOD 744.0 2,160.0 123,168.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 2,160.0 78.808.0
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0.
0.0 1,280.6 14 HRS GENERATOR ON LINE 744.0 2,160.0 77,170.1_
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,807,940 5,350,881 174,855.087
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 624,981 1,851,483 59,739.948
- 18. NET ELECTRICAL ENERGY OENERATED (MWH) 596.089 1,766,870 56,741,42L
- 19. UNIT SERVICE FACTOR 100.0 %
100.0 %
62.7 %
- 20. UNIT AVAILABLE FACTOR 100.0 %
100.0 %
62.7 %
21, UNIT CAPACITY FACTOR (using MDC net) 97.6 %
99.6 %
57.2 %
- 22. UNIT CAPACITY FACTOR (using DER net) 97.1 %
99.2 %
- 55.8%
- 23. UNIT FORCED OUTAGE RATE 0.0%
0.0%
20.0 %
24, SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE, DATE, AND DURATION OF EACH):
N/A
- 25. IF SHUTDOWN AT END OF REPORT PERIOO, ESTIM ATED D ATE OF STARTUP:
N/A
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
THIS ITEM IS NOT APPLICABLE TO CR-3 FORECAST ACHIEVED INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA NA
j
' UNIT SHUTDOWNS AND POWER REDUCTIONS -
.a..
DOCKET NO.
50-302 UNIT
' FLCRP-3 REPORT MONTit MARCH DATE -
APRIL 04.1991 COMPLETED JY.
R.1-. Mdaughth TEUEPHONE (904)795-4486 NO.
DATE TYPE (1). DURATION. REASON (2).
METHOD OF UCENSEE SYSTEA COMPONENT CAUSF 1LND CORFECTIVE HOURS SHUTTING EVENT CODE (4).
CODE (5) -
ACTION TO PREVENT DOWN REACTOR (3) REPORT # -
RECURRENCE i
97-04' 910304 :
'Fl
. D.G.
B 5
N/A' HC' HTEXCH. Reduced foad to approximately 75%
~
power to locate and repair a salt leak in
- C* watebox.The sacrificial' metal was J
.. also replaced at this time.
S
)
t I
r i
t e
I 1
2 3
4 s
F: FORCED fEAsat METHOD ExtAriG edsTRUCTEWS EXHeff f-SAME 9OURCE S: SCHEDULED A-EQUIPMENT FAlLURE 1-aeANUAL FOR PKPARATKIN OF DATA L
B-4AANTENANCE OR TEST
?-MANUAL SO%M ENTRY SHEETS FOR UCENSEE C 4EFUELING 3-rJFO SCRAM EYENT REPORT (LER) FILE D-51EOUULTORY f1ESTRICTtON 6 'TINUED (NLNEG 064
- E-OPERATOR TRAINING &
6-REEtMID LOAD '
LICENSE ADMtNRSTRATION 94THER F-ADMINISTRATION O-OPERATIONAL ERROR (EXPLAIN)
?
H-OTHER i
l q
i*'-
~f MONTHLY OPERATIONAL
SUMMARY
ST ATEMENT 1
DOCKET NO.
50-302 uNrT FLCAP-3 DATE APRIL 04,1991 COMPLETED BY R. L. Mclaughlin -
TELEPHONE (904)795-6486
-t i
Ij
- MONTH: MARCH h
1
SUMMARY
STATEMENT:
j d-Crystal River Unit 3 continued to perform very well during the month of March,1991. The unit operated nearly uneventfully for the period, j
generating 29.6 Effective Full Power Days in the 31 day period.
1
-The only power reduction for the month was due to a salt leak in "C" waterbox.
- ERLY MDC NET j