ML20070V000

From kanterella
Jump to navigation Jump to search
Proposed Change 114 to Tech Specs,Table 4.7.2.a Allowing Use of Manual Valve to Effect Primary Containment Isolation
ML20070V000
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 02/08/1983
From:
VERMONT YANKEE NUCLEAR POWER CORP.
To:
Shared Package
ML20070U993 List:
References
NUDOCS 8302140118
Download: ML20070V000 (1)


Text

_.

VYNPS a

TABLE 4.7.2.a PRIMARY CONTAINMENT ISOLATION VALVES VALVES SUBJECT TO TYPE C LEAKAGE TESTS Number of Power Maximum Action on Isolation Operated Valves Operating Normal Initiating Group (Note 1)

Valve Identification Inboard Outboard Time (sec) Position Signal 4

1 Main' Steam Line Isolation (2-80A, D & 2-86A, D) 4 4

5(note 2)

Open GC 1

Main Steam Line Drain (2-74, 2-77) 1 2

35 Closed SC l

1 Recirculation Loop Sample Line (2-39, 2-40) 1 1

5 Closed SC 2

RHR Discharge To Radwaste (10-57, 10-66) 2 25 Closed SG i

2 Drywell Floor Drain (20-82, 20-83) 2 20 Open GC 2

Drywell Equipment Drain (20-94, 20-95) 2 20 Open GC 3

Drywell Air Purge Inlet (16-19-9) 1 10 Closed SC 3

Drywell Air Purge Inlet (16-19-8) 1 10 Open GC 3

Drywell Purge & Vent Outlet (16-19-7A) 1 10 Closed SC 3

Drywell Purge & Vent Outlet Bypass (16-19-6A) 1 10 Closed SC 3

Drywell & Suppression Chamber Main Exhaust (16-19-7) 1 10 Closed SC y.,,

3 Surpression Chamber Purge Supply (16-19-10) 1 10 Closed SC g

4 3

Suppression Chamber Purge & Vent Outlet (16-19-7B) 1 10 Closed SC gg 3

Suppression Chamber Purge &. Vent Outlet Bypass (16-19-6B) 1 10 Open GC oo 3

Exhaust to Standby Gas Treatment Sfstem (16-19-6) 1 10 Open GC

$[

3 Containment Purge Supply (16-19-23) 1 10 Open GC l

m 3

Containment Purge Makeup (16-20-20, 16-20-22A,.16-20-22B)*

3 NA Closed SC ogg 5

Reactor Cleanup System (12-15, 12-18) 1 1

25 Open GC oo 5

Reactor Cleanup System (12-68) 1 45 Open GC 20$$

6 IIPCI (23-15, 23-16) 1 1

55 Open GC gjW 6

RCIC (13-15, 13-16) 1 1

20 Open GC Primary / Secondary Vacuum Relief (16-19-11A,16-19-11B) 2 NA Closed SC Primary / Secondary Vacuum Relief (16-19-12A, 16-19-12B) 2 NA Closed Process Cont rol Rod Hydraulic Return Check-Valve (3-181)

NA Open Process:

3 Containment Air Sampling (VG 23, VC 26, 109-76A&B) 4_

5 Open GC I

l

  • Note:

16-20-22D may be closed to effect primary containment isolation during repairs to valves 16-20-20 and 16-20-22B.

Use of valve 16-20-22D in this manner is restricted to one time for a period not to exceed 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. Use of 16-20-22D in this manner is not allowed after March 5, 1983.

i 135-