ML20070T963
| ML20070T963 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 02/02/1983 |
| From: | Stolz J Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20070T943 | List: |
| References | |
| TAC-48295, TAC-49318, TAC-49512, TAC-49513, NUDOCS 8302100076 | |
| Download: ML20070T963 (2) | |
Text
7590-01 9
UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKETS NOS. 50-321 AND 50-366 GEORGIA POWER COMPANY, ET AL.
NOTICE OF ISSUANCE OF AMENDMENTS TO FACILITY OPERATING LICENSES The U, S. Nuclear Regulatory Commission (the Commission)'has issued Amendments Nos. 92 and 30 to Facility Operating Licenses Nos. DPR-57 and NPF-5, issued to Georgia Power Company, Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, and City of Dalton, Georgia, which revised Technical Speciff-cations (TSs) for operation of the Edwin I. llatch Nuclear Plant, Units Nos.
1 and 2 (t;1e facility) located in Appling County, Georgia.
The amendments are effective as of the date of issuance.
The amendments revise the TSs for both Hatch Unit No. I and Unit No. 2 to modify the numerical values.of the reactor water 1,evels and the setpoints for reactor water levels measured by the shroud water level instruments to make them consistent with a change in the zero reference level. The amendments also revise the TSs for Hatch Unit No.1 to: 1) establish an upper limit for the rod block monitor high flux trip setting; 2) increase the pressure setting of the safety relief valve tailpipe pressure switches; and 3) add a newly installed torus access hatch to the list of testable containment penetrations.
l The applications for the amendments comply with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and l
f the Commission's rules and regulations. The Commission has made appropriate 8302100076 830202 PDR ADOCK 05000321 P
(
7590-01
. findings as required by the Att and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amer.dnents. Prior j
public notice of these amendments was not required since the amendments do not involve a significant hazards consideration.
The Commission has determined that the issuance of these amendnents will not result in any significant environmental impact and that pur,suant to 10 CFR Section 51.5(d)(4) an environmental impact statement, or negative declaration and environmental impact appraisal need not be prepared in connection with issuance of these amendments.
For further details with respect to this action, see (1) the applica-tions for amendments dated March 10, 1982, April 5, 1982, and January 3,1983 (two applications), (2) Amendments Nos. 92 and 30 to Licenses l{os. DPR-57 and flPF-5, and (3) the Corrnission's related Safety Evaluation. All of these items'are available for public inspection ~
at the Commission's Public Document Roon,1717 H Street, fl.11.,
Washington, D. C. and at the Appling County Public Library, 301 City Hall Drive, Baxley, Georgia 31513. A copy of items (2) and (3) may be obtained upon request addressed to the U. S. fluclear Regulatory Commission, Washington, D. C.
- 20555, Attention: Director, Division of Licensing.
Dated at Bethesda, Maryland, this 2nd day of February 1983.
FOR THE NUCLEAR REGUL TORY COMMISSION f
f Jo n'F. Stolz,' Chief 0 erating Reactors Branch #4 Division of Licensing
,