Proposed Tech Specs Re Mod of Definition 1.8,Item 1.8.3 & Surveillance Requirement 4.6.1.1.b to Indicate That Impact of Containment Air Locks on Containment Integrity Based on Compliance W/Spec 3.6.1.3
ML20070T728
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 04/02/1991
From:
BALTIMORE GAS & ELECTRIC CO.
To:
Shared Package
ML20070T723 List:
References
NUDOCS 9104050076
Download: ML20070T728 (4)


Text

.

m 1

1 DEFINITIONS REPORTABLE EYENT 1.7 A REPORTABLE EVENT shall be any of those conditions spectfied in Section 50.73 to 10 CFR Part 50.

CONTAINHENT INTEGR!TY 1.8 CONTAINMENT INTEGRITY shall exist when: .

1.8.1 All penetrations required to be closed during accident conditions are either:

a. Capr.ble of being closed by an OPERABLE containment automatic isolation valve system, or
b. Closed by manual valves, blind flanges, or deactivated autopatic valves secured in their closed positions. .

except as provided in Table 3.61 of Specification 3.6.4.1.

1.8.2 All equipment hatches b cmpt;areaeclosed w;& 4Leand sealed, repira se d e 8f

( 1.B.3 Each airlock is(OFERABLE pursuant to) Specification 3.6.1.3, 1,8.4 The containment leakage rates are within the limits of

[

Specification 3.6.1.2, and 1.8.5 The sealing mechanism associated with each penetration (e.g. , welds, bellows or 0-rings) is OPERABLE.

s ,

CHANNEL CALIBRATION

. 1.9 A CMANNEL CALIBRATION shall be the adjustment, as necessary, of the channel output such that it responds with the necessary range and accuracy to known values of the parameter which the channel monitors. The CHANNEL CAL!BRATION shall encompass the entire channel including the sensor and alarm and/or* trip functions, and shall include the CHANNEL FUNCTIONAL TT.57. The CHANNEL CALIBRATION may be perfonned by any series of sequen-tial, overlapping or total channel steps such that the entire caannel is calibrated.

9

( CALVERT CLIFFS-UNIT 1 1-2 Amendment No. 28 b 0104050076 910402 PllR ADOCK 05000317 P PDR

3/4.6 CONTA!NMENT SYSTEMS 3/ 4. 6.1 PRittARY CONTAlt!!iENT ,

CONTAINMENT INTEGRITY LfMITING COND,fTf0N FOR OPERATION l 3. 6.1.1 Primary CONTAINtiENT INTEGRITY shall be maintained.

4 APPLICABit,!TY : MODES- 1, 2, 3 and 4.

ACTION:

Without primary CONTAINMENT INTEGRITY, restore CONTAINMENT INTEGRITY within one hour or be in at least HOT STAHDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVE1LLANCE REQUIREMENTS

4. 6.1.1 Primary CONTAINMENT INTEGRITY shall be demonstrated:
a. At least once per 31 days by verifying that all penetrations * ,

not capable of being closed by OPERABLE containment automatic isolation valves and required to be closed during accident conditions are closed by valves, blind flanges, or deactivated automatic valves secured in their positions. .except as provided  ;

in Table 3.6-1 k of Specification cwpHaut toi& 3.6.4.1.

h.s re.fu irt MirA C e ~

b. By verifying that each containment air lock is LOPERABi.E per]l Specification 3.6.1.3. f'
c. By verifying that tha-equipment hatch is closed and sealed, prior to entering liode 4 following a shutdown where the equipment hatch was opened, by conducting a Type B test per Appendix J to 10 CFR Part 50.
  • Except valves, blind flanges, and deactivated automatic valves which are located inside the contairsnent and are locked, sealed,- or otherwise secured in the closed position. These penetrations shall be verified closed during i each COLD SHUTDOWN except that such verification need not be ' performed more often than once per-92 days.

< CALVERT CLIFFS - UNIT 1 3/4 6-1 Amendment No. ffg,///,

l

. - - _ . . . _ . - . - . . . - . _ _ , _ _ . . . . . . _ _ _ . _ . . . . , _ . _ . . . . . . _ , _ . . _ _ _ - , , , , . , . . _,...,_,...~_,,_.,.._..,_._,,_.__.__._,,,--.,..,..___..,.m-.-

s DEFINITIONS REPORTABLE EVENT 1.7 A REPORTABLE EVENT shall be any of those conditions specified in Section 50.73 to 10 CFR Part 50.

CONTAINMENT INTEGR!TY 1.8 CONTAINMENT INTEGRITY sna11 exist wnen:

1.8.1 All penetrations recuired to be closed during accident c conditions are either: ,

a. Capable of being closed by an OPERABLE containment automatic isolation valve system, or
b. Closed by manual valves, blind flanges, or deactivated automatic valves secured in their closed positions,.

except as providad in Table 3.51 of Specification 3.6.4.1.

1.8.2 All equipment hatchesw;S arebe closed o and sealed,ts er in cwohbee taggiremen 1.8.3 Each airlock is (OPERABLE oursuant tc) Specification 3.5.1.3, sd 1.8.4 The containment leakage rates are witnin :ne limits of Specification 3.6.1.2, and 1.8.5 The sealing meenanism associated witn eacn cenetration (e.g. , welds , cellows or 0-rings) is CFERABLE.

CHANNEL CAL:3 RATION 1.9 A CHANNEL CALIBRATION shall be the adjustnent, as necessary, of tne channel output such that it responds with the necessary range and accuracy to known values of the parameter which the channel monitors. The CHANNEL CALIBRATION shall encompass the entire channel including tne sensor and alarm and/or trio functions, and shall incluce tne CHANNEL FUNCTIONAL TEST. The CHANNEL CALIBRATION may se performed by any series of sequen-tial, overlapoing or total enannel staps such that the entire channel is-calibrated.

J CALVERT CLIFFS-UNIT 2 1-2 AmencmentNo.TJ,f/

  • + ,-+-ww-rm--ever er, m w e---m --r.w-wra- w-c-w, +.--w-.--r-v.-.-r,-e--ww,--ww-w,-,ms --

3/A.6 CONTAINMENT SYSTEMS 3 / a . 6.1 PRIMARY CONTAIN!1ENT CONTAINMENT INTEGRITY LIMITING CONDITION FOR OproaT10N 3.6.1.1 Primary CONTAIRMENT INTEGRITY shall be maintained.

Appl 1CABILITY: MODES 1, 2, 3 and 4.

ACTION:

Without primary CONTAINMENT INTEGRITY, restore CONTAINMENT INTEGRITY within one hour or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCERE0b1RENENTS

4. 6.1.1 Primary CONTAINMENT INTEGRITY shall be demonstrated:
a. At least once per 31 days by verifying that all penetrations
  • not capt.ble of being closed by OPERABLE containment automatic isolation valves and required to be closed during accident conditions are closed by valves, blind flanges, or deactivated automatic valves secured in their positions, except as provided in Table 3.6-1 of Specification 3.6.4.1.

ls eeq%ue' ni+k he rap;twenks o$ m

b. By verifying that each containment air lock is [0PERABLE__perl+ /}

Specification 3.6.1.3.

c. By verifying that the equipment hatch is closed and sealed, prior to entering Mode 4 following a shutdown where the equipment hatch was opened, by conducting a Type B test per Appendix J to 10 CFR Part 50.
  • Except valves, blind flanges, and deactivated automatic valves which are located inside the containment and are locked, sealed, or otherwise secured in the closed position. These penetrations shall be verified closed during each COLD SHUTOOWN except that such verification need not be performed more often than once per 92 days.

CALVERT CLIFFS - UNIT 2 3/4 6-1 Amendment No. 6,66, 99 l